MCQ
on
Contracts and Accounts
Subject Code 22601
1
1) After Completion of Diploma, The Engineer is able to become
1. S.E
2. C.E
3.A.E
4. J.E
Answer is JE
2) Who of the following Ensures all tools, Plants and machineries are properly maintained
1. S.E
2. C.E
3.E.E
4. J.E
Answer is EE
3) Who of the following prepares RA Bills and final Bills
1. S.E
2. C.E
3.E.E
4. J.E
Answer is JE
4) Who of the following prepares all types of estimates.
1. S.E
2. C.E
3. E.E
4. J.E
Answer is JE
5) Who of the following is administrative and technical control of the circle.
1. S.E
2. C.E
3. E.E
4. J.E
Answer is SE
6. The formal acceptance of the proposal by the department is called as
1. Administrative approval
2. Technical sanction
3. Security Deposit
4. Budget provision.
Answer is Administrative approval
7. The sanction of detailed estimate, Design, calculations, rates and costs of the work by the competent is called as
1. Administrative approval
2. Technical sanction
3. Security Deposit
4. Budget provision.
Answer is Technical sanction
8. The method adopted to have a proper and effective control over expenses and production cost in an organization is called as
1. Administrative approval
2. Technical sanction
3. Security Deposit
4. Budget provision.
Answer is Budget provision.
9. Who of the following is head of Subdivision
1. Assisstant Engineer Grade- 1
2. Subdivisional Officer
3. Subdivisional Engineer
4. All of the above.
Answer is All of the above.
10. Which of the following is/are the method used in PWD for carrying out the works
1. Contract
2. Rate list
3. Piece work
4. All of the above.
Answer is All of the above.
11. What is the full form of BOQ
1. Beginning of Quarter
2. Bill of Quantities
3.Begin of Quote
4.Basic Officer Qualification.
Answer is Bill of Quantities
12. In which of the following contract, the contractor has to quote rates of each individual item of work
1.Item rate contract
2. Percentage rate contract
3. Both 1 and 2
4. None of the above.
Answer is Item rate contract
13. In which of the following contract, the contractor has to quote only the percentage above or below or at par with the rate shown in the schedule.
1. Item rate contract
2. Percentage rate contract
3. Both 1 and 2
4. None of the above.
Answer is Percentage rate contract
14. Which of the following method of execution of work is used for the works which are having cost of small value.
1. Item rate contract
2. Percentage rate contract
3. Rate list method
4. All of the above.
Answer is Rate list method
15.Which of the following method of execution of work is used for the works which are not having definite quantity
1. Item rate contract
2. Percentage rate contract
3. Rate list method
4. Piece work method
Answer is Piece work method
16. Which of the following method is suitable for Maintenace and repair works.
1. Item rate contract
2. Percentage rate contract
3. Rate list method
4. Piece work method
Answer is Piece work method
17. Which of the following method of execution of work is used for the works on the basis of actual labourers and materials required.
1. Item rate contract
2. Day work method
3. Rate list method
4. Piece work method
Answer is Day work method
18. Which of the following method of execution of work is used for the works which are not having definite quantity
1. Day work method
2. Piece work method
3. Both 1 and 2
4. NOTA
Answer is Both 1 and 2
19. What is Full form of NMR
1. Nuclear Magnetic Resonance
2. Nominal Muster Roll
3. Neonatal mortality rate
4. National Military Representative
Answer is Nominal Muster Roll
20. Which of the following method of execution of work is used if the department wants to eliminate the profit of contractor
1. Item rate contract
2. Day work method
3. Rate list method
4. Departmental method of employing Daily Labour.
Answer is Departmental method of employing Daily Labour.
21. Who of the following issues the Blank NMR
1. EE
2. AE
3. JE
4. SE
Answer is EE
22) Form no 21 Contains…………..parts.
1) 2 parts
2) 3 parts
3) 4 parts
4) 1 parts
Answer is 2 parts
23) Which of the part of the NMR shows, the details of the work done and the amount paid to the labourers.
1) Part 1
2) Part 2
3) Part 3
4) Part 4
Answer is Part 2
24) Which of the part of the NMR shows, the details of the labours.
1) Part 1
2) Part 2
3) Part 3
4) Part 4
Answer is Part 1
25) The payment of unpaid wages is recorded in form no. ………..
1) 25
2) 28
3) 30
4) 32
Answer is form no. 28
26) Duplicate Muster rolls should not be maintained, the statement is right or wrong
1. Right
2. Wrong.
Answer is Right.
27) The Attendance of labourers in NMR should be taken……..
1. Daily
2. weekly
3. Fortnightly
4. Monthly
Answer is Daily
28. In Which of the following method of execution of work , The valuing of work is done on the basis of time spent by the labourers.
1. Daily wages method
2. Piece work method
3. Both 1 and 2
4. NOTA
Answer is Daily wages method
29. In Which of the following method of execution of work , The valuing of work is done on the basis of quantity of work actually done by the labourers.
1. Daily wages method
2. Piece work method
3. Both 1 and 2
4. NOTA
Answer is Piece work method