CHAPTER 8: Concept Selections

​

​

​

SKMJ 1902

ENGINEERING PRINCIPLES

AND PRACTICE

UTM JOHOR BAHRU

2 of 32

Solution Concept

    • Generating multiple solutions to the problem.

Conceptualization

    • Identifying the highest potential solution.

Evaluating Alternatives

3 of 32

Concept Selection

Concept generation phase develops a number of concepts.

Hence, the next step is to select the final concept to be further developed.

​

Problems

  • The criteria for selection may contradict to each other such as precision device may demand a higher cost in manufacturing process.

​

  • Each concept may have good and bad features within a single design; however a perfect final design is having good features.

4 of 32

Selection Method

2 stage of selection

  • Concept Screening : screening matrix
  • Concept Scoring : scoring matrix

​

Or (if required)

Screening 🡪 Screening 🡪 Scoring

​

5 of 32

Evaluating conceptual alternatives

Based on comparing alternatives with the list of specification table

Matrix Selection: Criteria

Bad Criteria

Improved Criteria

Good Criteria

  • Easy to compare (No of steps taken)
  • Well understood by group
  • Specific item is compared.

6 of 32

Datum

One of the concept or similar product in market

​

For each criterion, the concept will be compared with the same of criterion of the datum.

​

​

Range of mark depends on type of selection matrix

​

  1. Screening (‘-’ , 0 , ‘+’) : worse, equal, better
  2. Scoring (-2, -1, 0, 1 ,2 ): worst, worse, equal, better , best

7 of 32

Screening and Scoring Matrix

Screening Matrix: when the number of concepts is larger than 6.

​

Scoring Matrix: when the number of concepts is equal or less than 6.

​

​

​

​

​

​

8 of 32

Screening of Concepts

1. The concepts are directly measured with respect to a fixed set of limits (specifications). If a concept doesn’t satisfy them, it will be dropped.

E.g.: Using sonar to align a wheelchair - cost limitation.

9 of 32

Screening of Concepts

2. The designers use their experience (engineering sense) to eliminate some concepts because the technology is not yet available, or it is not feasible.

E.g.: Use parachute to stop the wheelchair – from engineering standpoint, it doesn’t make sense.

10 of 32

Screening of Concepts

3. The concepts are evaluated with respect to each other using measures defined by the criteria (specifications/wishes).

11 of 32

Screening Matrix

Selection Criteria

Concept

Datum

Concept 1

Concept 2

…

Concept 3

Ease of use

 

 

 

 

 

Ease of handling

 

 

 

 

 

…

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  Total mark

 0

 

 

 

 

12 of 32

Screening Matrix

◊ Screen the concepts to be selected for concept scoring

◊ Proceed with at least half of the total number of concepts to the second level of selection

◊ Datum: existing product on market or one of the concepts

◊ Mark is given based : + 1: better than datum

0: equal to datum

- 1: worse than datum

​

Significance of the total mark

  • Higher mark: better than datum
  • Equal mark between two concept: indicate similar and may be can be combined to generate another new concept

13 of 32

Scoring Matrix

Selection Criteria

Weight

 

Concept 1

 

Concept n

Datum

Mark

Tot

…

Mark

Tot

Ease of use

0.15

 

1

0.15

 

 

 

Ease of handling

0.2

 

5

1

 

 

 

…

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total Overall Mark

 

 

 

 

 

 

 

14 of 32

Scoring Matrix

◊ Scoring is used when increased resolution of the criteria

◊ Weightage on each criteria is set. PDS is referred

◊ Datum: existing product on market or one of the concepts

◊ Mark is given based :

1: much worse than datum

2: worse than datum

3: equal to datum

4: Better than datum

5: much better than datum

◊ Mark on each criteria for each concept = mark x weightage

​

15 of 32

Selection of criteria

◊ reference on selection criteria: PDS, sketch, discussion

◊ Cover from functional aspect to production and expected costing

◊ performance of the concept from their functional aspect or user perception (ease of use, ease of handling)

◊ Production and manufacturing aspect (ease of fabrication, material used, manufacturing processed required, etc)

◊ Monetary aspect (man-hours, costing)

if necessary, criteria in scoring is more specific from screening criteria, for instance

Material 🡪 Ease to get

Ease to cut

Price

​

​

​

16 of 32

17 of 32

Weigthage : scoring matrix

  • The total weightage = 1.0
  • You have to decide each criteria weightage.
  • Different weightage yields to different final concept. If highest is set to cost, the final concept will be the cheapest one and you may sacrifice the performance

18 of 32

Dysfunctions of concept selection

  • Fail to include the whole spectrum of criteria: refer back to your PDS
  • Weight sets on each criterion can result a total different concept: discuss thoroughly and always refer to problem definition
  • Only one person decides on the mark: all the team has to write the pros and cons on each concept before discussion
  • Criteria set is vague: discuss the criteria and make sure each member has the same understanding

19 of 32

Overall Concept Selection

Concepts

Screening

Concepts after scoring

Scoring

20 of 32

Importance of weightage

 

Factor

Performance

1 

- Perf 1

 

- Perf 2

 

- Perf 3

 

…

 

- Perf N

 

 

 

Manufacturing/Production

 0

- Manf 1

 

- Manf 2

 

- Manf 3

 

…

 

- Manf 5

 

 

 

Aesthetic

 0

- Aes 1

 

- Aes 2

 

- Aes 3

 

…

 

- Aes 5

 

 

Factor

Performance

0 

- Perf 1

 

- Perf 2

 

- Perf 3

 

…

 

- Perf N

 

 

 

Manufacturing/Production

1

- Manf 1

 

- Manf 2

 

- Manf 3

 

…

 

- Manf 5

 

 

 

Aesthetic

 0

- Aes 1

 

- Aes 2

 

- Aes 3

 

…

 

- Aes 5

 

 

Factor

Performance

0

- Perf 1

 

- Perf 2

 

- Perf 3

 

…

 

- Perf N

 

 

 

Manufacturing/Production

 0

- Manf 1

 

- Manf 2

 

- Manf 3

 

…

 

- Manf 5

 

 

 

Aesthetic

 1

- Aes 1

 

- Aes 2

 

- Aes 3

 

…

 

- Aes 5

 

Final concept: the best performance and may be very expensive and worst look

Final concept: very easy to manufacture but poor in performance and aesthetic

Final concept: very nice to see but may not working and cannot be manufactured

Therefore, the criteria may contradict to each other and to have best design, weightage is very important.

21 of 32

Detail of each criterion

Performance

Balls stuck in starting container

  • When the balls fall into the contanier together

Balls bounce back from the container

  • When the balls move in the container

Smoothness of flow out from the container

  • This criteria is evaluate when the balls move out from the container into the runway

Accuracy of the balls to success according mechanism 1

  • Ability of certain balls to sort according 1st mechanism

Accuracy of the balls to success according mechanism 2

  • Potential of sorting balls according 2nd method

Collision of the balls

  • Internal collision and external collision of the ball

Accuracy of the balls to bounce into other pathway

  • Capability of the balls to jump into other path

Balls stuck in runway

  • Ability of the ball to stuck before and after sorting

Balls stick together and move at the same time

  • Possibility of the balls to stick together during the motion

Sensitivity of the regulators to recover

  • Potential of the regulator to return to its form before working

Balls bounce from the final container

  • Possibility of the balls to jump out from the last container

22 of 32

Example Criteria 1

23 of 32

Example Criteria 2

24 of 32

Example Criteria 3

25 of 32

Example

26 of 32

4.1 Criteria

No

Selection Criteria

Description

1

Safety

Concerns the safety of the children

2

Cleanliness

The product must be difficult to get dirty

3

Ease of play

The product must not be too hard for children to play with

4

Aesthetic

Visual attractiveness of product

5

Durability

The ability to withstand damage

6

Size

Overall dimension and parts dimension

7

Portability

The ease of moving the product

8

Efficiency

How it stimulates the children’s mind

9

Exposure to engineering knowledge

How much it exposes engineering knowledge such as engineering steps and engineering components (gears and chains)

10

Enhance cooperative play

How much it enhances cooperative play through operational steps and difficulty

11

Versatility

The ability to make more than one design of toy from the parts

12

Adaptability

The ability to adapt/fit in other material into play

13

Material / Environmentally friendly

Made of environmentally friendly material

27 of 32

4.2 Weightage

Selection Criteria

Weightage

Reason

Safety

0.11

Safety is set to be one of the highest criteria because it is one of the crucial things to be ensured.

Cleanliness

0.07

Cleanliness is important because it is significant to children’s health.

Ease of play

0.07

Ease of play is set as 0.07 because if it is too difficult to play with, the design objective might fail.

Aesthetic

0.06

Nice looking design and colour is important to attract customers.

Durability

0.05

Choice of material and construction is important as to maintain the product.

Size

0.06

Size is set to be 0.06 because children must be able to hold it easily.

Portability

0.05

Portability is set as shown because the product will need to be easily moved from one place to another

Efficiency

0.1

Efficiency is high because the product needs to achieve the main objective to stimulate the children’s mind.

Exposure to engineering knowledge

0.09

The product must be able to expose children to engineering so as to achieve one of the objectives.

Enhance cooperative play

0.1

The product must be able to expose cooperative play to the children as part of the objectives.

Versatility

0.1

Versatility is also set as the highest to ensure the toy can produce more than one model.

Adaptability

0.06

The product needs to be able to fit other objects in its function to enhance relation to other objects.

Material / Environmentally friendly

0.08

Material is set to be 0.08 because environmentally friendly product is prioritized.

28 of 32

4.3 Screening Matrix

Selection Criteria

Concept

Datum

Concept 1

Concept 2

Concept 3

Safety

 

+

+

+

Cleanliness

 

0

0

+

Ease of play

 

-

-

+

Aesthetic

 

0

0

0

Durability

 

0

0

0

Size

 

+

+

+

Portability

 

0

0

+

Efficiency

 

+

+

0

Exposure to engineering knowledge

 

+

+

+

Enhance cooperative play

 

+

+

0

Versatility

 

-

-

-

Adaptability

 

-

-

-

Material / Environmentally friendly

 

0

0

0

Net score

 

2

2

4

The datum used is Lego

29 of 32

4.4 Scoring Matrix

Selection Criteria

Weight

Concept

Datum

Concept 1

Concept 2

Concept 3

Mark

Total

Mark

Total

Mark

Total

Mark

Total

Safety

0.11

2

0.22

4

0.44

4

0.44

5

0.55

Cleanliness

0.07

3

0.21

4

0.28

4

0.28

5

0.35

Ease of play

0.07

4

0.28

4

0.28

3

0.21

4

0.28

Aesthetic

0.06

3

0.18

3

0.18

3

0.18

3

0.18

Durability

0.05

4

0.2

4

0.2

4

0.2

4

0.2

Size

0.06

3

0.18

4

0.24

4

0.24

4

0.24

Portability

0.05

3

0.15

3

0.15

3

0.15

3

0.15

Efficiency

0.1

3

0.3

4

0.4

4

0.4

3

0.3

Exposure to engineering knowledge

0.09

4

0.36

4

0.36

4

0.36

3

0.27

Enhance cooperative play

0.1

3

0.3

4

0.4

4

0.4

2

0.2

Versatility

0.1

4

0.4

3

0.3

3

0.3

3

0.3

Adaptability

0.06

3

0.18

3

0.18

3

0.18

3

0.18

Material / Environmentally friendly

0.08

3

0.24

3

0.24

3

0.24

3

0.24

Total

 

 

3.2

 

3.65

 

3.58

 

3.44

30 of 32

4.5 Final Concept

31 of 32

Final Design

The final design can be

​

  • One of the proposed concepts with the modification during reflection of the final design

​

  • The integration of two or more proposed concepts.

32 of 32