1 of 27

SAP Extended Warehouse Management

(ECC6 & SCM-EWM System scenario)

Set Up the

Staging for Production

2 of 27

  1. Create Production Supply Area
  2. Assign the PSA to Work Center
  3. Create Control Cycle
  4. Create BOM
  5. Manual create new PSA in EWM
  6. Map EWM PSA to ERP PSA
  7. Create PSA Bin Assignment in EWM

3 of 27

Create PSA in the ERP system

4 of 27

Plant SPCW

Supply Are PSA-PP##

Description Production Supply Area ##

Storage Loc. PW##

PSA is assigned with ERP Storage Location

5 of 27

  • Create Production Supply Area
  • Assign the PSA to Work Center
  • Create Control Cycle
  • Create BOM
  • Manual create new PSA in EWM
  • Map EWM PSA to ERP PSA
  • Create PSA Bin Assignment in EWM

6 of 27

7 of 27

Assign PSA

PSA-PP## to

Work Center STAG-##

8 of 27

  • Create Production Supply Area
  • Assign the PSA to Work Center
  • Create Control Cycle
  • Create BOM
  • Manual create new PSA in EWM
  • Map EWM PSA to ERP PSA
  • Create PSA Bin Assignment in EWM

9 of 27

ERP Control Cycle is for the Staging Methods of Materials for WM or EWM system

10 of 27

“Pick Part” is for Preparation of Material picked for Each Production Order

ERP WM Warehoues

11 of 27

“Pick Part” is for Preparation of Material picked for Each Production Order

ERP WM Warehoues

12 of 27

“Released Order Part” is for Grouping Materials for Picking for multiple Production Orders

ERP WM Warehoues

13 of 27

“Released Order Part” is for Grouping Materials for Picking for multiple Production Orders

ERP WM Warehoues

14 of 27

  • Create Production Supply Area
  • Assign the PSA to Work Center
  • Create Control Cycle
  • Create BOM
  • Manual create new PSA in EWM
  • Map EWM PSA to ERP PSA
  • Create PSA Bin Assignment in EWM

15 of 27

16 of 27

Materials in the Control Cycle are in the BOM.

Control Cycles for T-EW42/43/46/47 is setup in the ERP system because the Triggering for Replenishment is from the ERP system then send to the EWM system for processing.

T-EW41-11 will be setup as Crate Replenishment method in the EWM system (because the Replenishment Triggering is in the EWM system and not in the ERP system)

17 of 27

  • Create Production Supply Area
  • Assign the PSA to Work Center
  • Create Control Cycle
  • Create BOM
  • Manual create new PSA in EWM
  • Map EWM PSA to ERP PSA
  • Create PSA Bin Assignment in EWM

18 of 27

Setup the PSA in the EWM system

19 of 27

in EWM

Supply Area PSA-PP##

PSA Description PSA for PP##

SAVE

EWM PSA the same coding as the ERP PSA (see Slide 4)

20 of 27

  • Create Production Supply Area
  • Assign the PSA to Work Center
  • Create Control Cycle
  • Create BOM
  • Manual create new PSA in EWM
  • Map EWM PSA to ERP PSA
  • Create PSA Bin Assignment in EWM

21 of 27

In the EWM system, Map the EWM PSA to the ERP PSA

22 of 27

map

PSA-PP## in the ERP system

to the

PSA-PP## in the EWM system

(in the EWM system)

23 of 27

  • Create Production Supply Area
  • Assign the PSA to Work Center
  • Create Control Cycle
  • Create BOM
  • Manual create new PSA in EWM
  • Map EWM PSA to ERP PSA
  • Create PSA Bin Assignment in EWM

24 of 27

Assign PSA BIn to PSA/Products to use the EWM system

(in EWM system)

25 of 27

Material T-EW41-11

set for Create Replenishment (Kanban Containers)

(EWM system)

26 of 27

Blank Product as the Staging Method is via the Control Cycle in the ERP System (Slide 10, 11, 12, 13) for Material T-EW42-11, T-EW43-11, T-EW46-11 and T-EW47-11

27 of 27

T-EW41-11 with “Create Part” Replenishment method setup in the EWM Control Cycle

The rest of the Material

T-EW42/43/46/47 Staging Storage Bin in the EWM system where the Replenishment Methods is from the ERP Control Cycle