1 of 14

2 of 14

SERVER

OCP NIC Community Update�August 2026

for Server Project

�����Sub-project Project Wiki: https://www.opencompute.org/wiki/Server/NIC�

Mailing List: https://ocp-all.groups.io/g/OCP-NIC

NIC3.0

3 of 14

Agenda

​

  • OCP Global Summit
  • 200W Power connector
  • Electrical and Spec update

​

​

​

4 of 14

OCP Global Summit

Accepted Topic

Innovation Village

  • Focused on AI / Liquid cooling discussions and demo to help drive spec requirements
    • Broadcom Inc. Dell Technologies, Intel Corporation, Meta, Portwell
    • In the “IT Infra” area this year.
  • Workstream started planning with Intel/Thomas leading

5 of 14

200 W power connector

  • SFF-TA-1037 (PMM) ⇒ 200W 4C+ EP connector
    • Backwards compatible with SFF-TA-1002 cards
    • Large Power / GND blade on NIC/connector
    • Requires updated platforms for high power cards

​

  • Configurations
    • Available in vertical, RA and straddle mount
    • Cabled / panel mount?
    • Gen 7 support?

​

  • Things to solve
    • Cooling
    • Preventing 200W card from plugging into legacy chassis.
    • Mechanical interlock - interference fit?
    • FRU - read power budget first? Hardware pin interlock?

Reference – Public SNIA document: https://members.snia.org/document/dl/51356

6 of 14

SFF-TA-1037 4C+ EP Connector

Reference – Public SNIA document: https://members.snia.org/document/dl/51356

7 of 14

Specification Updates → v1.7

  • v1.7 Draft work in progress
    • Review draft available now:
    • High level change list
    • DMTF FRU / MFG Date/Time Rollover
    • PCIe Gen 7
    • Power excursions
    • Thermal updates

8 of 14

Section 3.x - Baseboard Mechanical

Section 3.2.1 - Add section regarding Baseboard EMI compression features.

​

Section 3.3.4/3.3.5 - Update DSFF/TDSFF figures with flange

​

Addresses chassis issues seen in 2025 Global Summit.

9 of 14

Section 4.10.x - Power Supply Limits

Section 4.10.2 -

Add power excursion limits per SFF-TA-1002 Rev 1.6a

​

​

​

10 of 14

Section 5.10.3 - FRU Content

Add notes regarding the Board Info Area Mfg Date/Time rollover for card mfg dates after Nov 24th 2027.

​

Add support for DMTF DSP0220 FRU Data Specification Format. Refer to slides from prior meetings.

​

​

​

11 of 14

Section 5.10.3.1 - FRU Content

Base OEM Record (0xC0)

​

Offset 3 - Add support encoding support for specification Version 1.7.0.

​

Offset 30 - Add support for Power Excursion Indication

​

​

​

​

12 of 14

Section 6.3.1.2 - Add-in Card Budget

Add support for PCIe CEM 7.

​

Align OCP NIC electrical insertion loss budget to CEM Draft 0.5 ⇒ -9.5 dB at 32 GHz

13 of 14

Section 7.2.2 - TSFF - Hot Aisle

Thermal workstream contributed the TSFF Card ASIC cooling estimates for Hot Aisle operation.

​

​

14 of 14

​

Thank You

​

​

​

​

​