DPMPTSP — SPECIAL REGION OF YOGYAKARTA

Investment Prospectus

Study on Primary and Secondary Sector Investment Potential Based on Leading Commodities in DIY

Investment Project Ready to Offer (IPRO), KPI Sentolo, Kulon Progo Regency

Coconut Coir Processing Industry

Integrated Chili Processing

Future Expansion Opportunity: Biomass

Conceptual design illustration of the coconut coir plant in Tuksono, KPI Sentolo

2026

2 of 25

2

Contents

01

Project Profile

  • Project rationale and strengths
  • Investment value and business classification
  • Location, land status, and lease rate

02

Market Aspects

  • Kulon Progo’s leading commodities
  • Development direction and priority industries
  • Products, target markets, and competitive advantages

03

Legal Aspects and Business Model

  • Applicable regulations
  • Licensing and incentives
  • Business model and canvas for each project

04

Technical Aspects

  • Accessibility and utilities
  • Plant design and process flow
  • Development phasing and shared facilities

05

Financial Aspects

  • Investment requirement and financing structure
  • Model assumptions and projected performance
  • Feasibility, sensitivity, and break-even points

06

Socio-Economic and Environmental Aspects

  • Employment and local economic linkages
  • Environment and circular economy
  • Sustainable Development Goals

07

Risks and Mitigation

  • Risks by stage and mitigation measures
  • Investment decision points

08

Conclusions and Recommendations

  • Conclusions by aspect
  • Recommendations and responsible parties

Future Expansion Opportunities: rice husk and straw biomass, presented separately on page 24.

Illustration of the chili plant’s production and packaging area

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

3 of 25

3

01. Project Profile

Project Rationale

Kulon Progo produces large volumes of coconut, chili, and rice, yet most of this output is still sold as raw material. Raw-material collection, post-harvest processing, quality standards, and secure buyers are not yet in place, so much of the added value is captured outside the regency. The Sentolo Industrial Designated Area (KPI), particularly Tuksono, is being developed as a processing hub that closes these gaps.

2025 GRDP of IDR 17.93 trillion, about 8.6% of DIY’s GRDP, growing 4.36%

2025 investment realization of ±IDR 567 billion, above the regional target of IDR 160 billion

±2,569 ha of KPI across five sub-districts; KPI Sentolo covers ±1,718.63 ha

Aligned with the 2025–2029 RPJMN, the 2025–2045 RPJPD, and the 2022–2042 Kulon Progo RPIK

Agriculture is a base sector, while manufacturing shows positive growth

Close to Yogyakarta International Airport, the national road, and the railway line

Project Strengths

Both projects buy raw materials from local farmers and collectors, process them in Tuksono, and sell to industrial buyers. Coconut Coir Project uses coconut husk that is currently wasted, without competing with the coconut market, while Chili Project absorbs grade B/C chili and harvest surpluses that are now sold at low prices.

Land is provided under long-term leases, so investor capital goes into buildings, machinery, and working capital. The coir investment can start with a small pilot phase, and every feasibility result comes with clearly stated risk limits.

Investment Value

IDR 33.49 billion

for two ready-to-offer projects

  • Coconut Coir Project — Coconut coir: IDR 21.37 billion
  • Chili Project — Chili processing: IDR 12.12 billion
  • The biomass expansion opportunity is presented separately (page 24)

Business Classification (KBLI)

32905

Coconut fiber industry (Coconut Coir Project)

10303

Drying of fruits and vegetables, including dried chili (Chili Project)

10779

Seasonings, including chili powder and sauces (Chili Project)

Final codes are set at OSS registration according to the process configuration.

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

4 of 25

4

01. Project Profile

Indicative Project Location

Map of the five KPIs in Kulon Progo Regency; project location is indicative

  • Indicative plant site: Wonobroto, Tuksono Village, Sentolo Sub-district
  • Estate: KPI Sentolo, the largest industrial designated area in Kulon Progo
  • Coconut Coir Project pilot phase: Sendangsari Cempol coir SME cluster, Pengasih Sub-district

Land Status

78 parcels

±24.52 ha in Tuksono–Salamrejo

72 parcels

±22.61 ha in Tuksono

6 parcels

±1.91 ha in Salamrejo

21 parcels

±13.4 ha in the Wonobroto cluster

Almost all parcels hold freehold titles (SHM) registered to their owners, mostly designated as residential yard land. The Wonobroto cluster alone exceeds the ±4.3–5.3 ha required by the three facilities. Each parcel still needs to be checked for ownership, effective area, road access, and spatial-plan compliance, and its tenure arrangement agreed, before it is offered to investors.

Land Lease Rate

IDR 35,316

per m² per year (estimate)

Reconciled from three benchmarks: lease rates for regional government assets in Sentolo, land lease offers in Tuksono, and land value. Landowners currently record a preference for sale; the lease arrangement will be agreed during due diligence.

Land requirement

Area

Annual lease cost

Coconut Coir Project — commercial phase

±2.8 ha

±IDR 988 million

Coconut Coir Project — pilot phase (SME partner land)

±1.5 ha

As agreed with the SME partner

Chili Project — chili plant

±0.32 ha

±IDR 112 million

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

5 of 25

5

02. Market Aspects

Leading Commodities in Kulon Progo

Commodity

2025 production

Raw-material potential

Project

Coconut (as copra)

±26,950 tonnes; >65,000 farming households

±124,000,000 nuts/year; husk largely unused

Coconut Coir Project

Curly red chili

±38,310 tonnes

Seasonal harvest; Panjatan is the largest producer

Chili Project

Bird’s eye chili

±10,690 tonnes

Supplementary supply

Chili Project

Source: Kulon Progo Agriculture and Food Office; Statistics Indonesia (BPS) Kulon Progo; compiled by the study team, 2026.

Development Direction

  • Downstream processing of coconut into industrial raw materials
  • Food processing to stabilize horticultural prices
  • Partnerships with farmers, cooperatives, and SMEs as industrial suppliers
  • An integrated processing hub with shared facilities in KPI Sentolo

Priority Industries

Coconut fiber industry

Chili processing: paste, sambal, and dried chili

Integrated farm-produce processing in KPI Sentolo

Competitive Advantages

Abundant raw materials nearby

Coconut and chili production centers lie within Kulon Progo and neighboring regencies.

Low raw-material cost

Husk is bought as a by-product; grade B/C chili is bought at about 30% of the farm-gate price within a price band.

Strategic location

Tuksono lies at the center of the regency, close to the national road, the railway, and Yogyakarta International Airport.

Leased land and shared facilities

Investors do not need to buy land; weighbridges, warehouses, and wastewater treatment can be shared.

Regional government support

Licensing facilitation, utility coordination, and a regional investment incentive framework.

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

6 of 25

6

02. Market Aspects

Products and Target Markets

Project

Product

Annual volume

2026 price assumption

Target buyers

Coir

Coconut fiber (cocofiber)

±960 t

IDR 2,775/kg

Mattress and spring bed makers, geotextiles

Coir

Bristle fiber (coco bristle)

±480 t

IDR 11,436/kg

Brush makers, asphalt additives, automotive (later market)

Coir

Coir pith (cocopeat) blocks

±3,480 t

IDR 3,324/kg

Growing media and horticulture, domestic and export

Chili

Chili paste or ground chili

±500 t

IDR 30,338/kg

Food manufacturers

Chili

Sambal and chili sauce

±250 t

IDR 19,826/kg

Brand owners (toll manufacturing), hotel, restaurant, and catering distributors

Chili

Dried chili

±33 t

IDR 51,363/kg

Seasoning manufacturers and distributors

Coconut Coir Project volumes are at full capacity of 40,000 husks per day. The bristle price uses the export bristle benchmark and still needs to be confirmed by buyer quotations, since the asphalt-additive market generally uses lower grades.

Coconut Husk Supply Area

Commercial-scale supply requires husk from Purworejo and Kebumen in addition to Kulon Progo. The plant buys husk, not whole coconuts, so it does not compete with the fresh coconut, copra, and coconut sugar markets.

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

7 of 25

7

03. Legal Aspects and Business Model

The processing hub in KPI Sentolo is based on Government Regulation No. 20 of 2024 on Industrial Zoning and on the DIY and Kulon Progo spatial plans, which designate industrial areas. At the regency level, the 2022–2042 Kulon Progo Industrial Development Plan guides industry built on local resources.

Spatial Planning and Regional Development

  • Presidential Regulation No. 12/2025 on the 2025–2029 RPJMN
  • DIY Regional Regulation No. 10/2023 on the 2023–2043 DIY Spatial Plan
  • Kulon Progo Regulation No. 1/2012 on the 2012–2032 Spatial Plan
  • Kulon Progo Regulation No. 7/2024 on the 2025–2045 RPJPD
  • Kulon Progo Regulation No. 5/2025 on the 2025–2029 RPJMD
  • Regent Regulation No. 41/2026 on the Central Kulon Progo Detailed Spatial Plan

Industrial Sector

  • Law No. 3/2014 on Industry
  • Government Regulation No. 20/2024 on Industrial Zoning
  • Kulon Progo Regulation No. 7/2022 on the 2022–2042 Industrial Development Plan

Licensing and Incentives

  • Government Regulation No. 28/2025 on Risk-Based Business Licensing
  • Minister of Investment and Downstreaming/BKPM Regulation No. 5/2025 on licensing and investment facilities through OSS
  • Kulon Progo Regulation No. 21/2012 as amended by No. 4/2021 on investment incentives and facilities
  • Regent Regulation No. 62/2015 as amended by No. 11/2017 on incentive procedures

Environment and Food Products

  • Law No. 32/2009 on Environmental Protection and Management
  • Government Regulation No. 22/2021 on Environmental Protection and Management
  • Law No. 33/2014 on Halal Product Assurance
  • Government Regulation No. 86/2019 on Food Safety

Licensing and Incentives

Risk-Based OSS

Licenses are filed through OSS according to the KBLI code and the activity’s risk level.

Basic Approvals

Spatial-use conformity (PKKPR), environmental approval, and building approval.

Product Standards

Distribution permits, halal certification, and a food-safety system for chili products.

Regional Incentives

May be applied for and are assessed against set criteria; not granted automatically.

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

8 of 25

8

03. Legal Aspects and Business Model

Business Model of Coconut Coir Project

Coconut farmers and collectors

Sub-district cooperatives (aggregators)

Dwarf-coconut farmer groups (outgrowers)

Sendangsari Cempol coir SMEs (pre-processing)

Coconut Coir Project Company

(investor)

Coir plant in Tuksono

Mattress and spring bed makers

Growing media and horticulture

Geotextiles, asphalt additives, soil stabilization

Automotive industry (later market)

Industrial mentor partner: skills, process, quality; prospective buyer

Regional government: land, utilities, licensing, incentives

Bank: loan for 60% of investment

husk and semi-processed material

coconut fiber, bristle, coir pith

Project company

:

The investor owns the plant, funds buildings, machinery, and working capital, and runs production and sales.

Purchasing principle

:

The plant buys husk, not whole coconuts, so farmers keep selling coconuts in existing markets and earn extra income.

Cooperatives and outgrowers

:

Sub-district cooperatives collect husk from collectors; dwarf-coconut farmer groups supply under contract as outgrowers.

Coir SMEs

:

The Sendangsari Cempol SME cluster hosts the pilot phase and later supplies semi-processed material to the commercial plant.

Industrial mentor partner

:

An industrial partner has expressed interest in mentoring skills, process, and quality and in buying output; a written agreement is being prepared.

Two sites, one chain

:

A 5,000 husks/day pilot at the Sendangsari Cempol SME cluster, which already has facilities and skilled workers; a 40,000 husks/day plant in Tuksono (industrial land, 500 kVA power, wastewater plant). The SMEs keep supplying pre-processed input.

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

9 of 25

9

03. Legal Aspects and Business Model

Business Model of Chili Project

Chili farmers and farmer groups

Chili collectors

Chili Project Company

(investor)

Chili plant in Tuksono: paste, sambal, dried chili

Food manufacturers

Brand owners (toll manufacturing)

Hotel, restaurant, and catering distributors

grade B/C (food grade) chili and harvest surplus; seasonal contracts within a 25–33% price band

Regional government: land, utilities, licensing, food standards

The dried-chili line absorbs harvest surpluses so that farm-gate prices do not fall too far.

Raw material

:

Grade B/C chili, off-spec for the fresh market but still food grade, is bought through seasonal contracts within a price band of 25–33 percent of the farm-gate price.

Products

:

Chili paste or ground chili uses about 70% of raw material, sambal and sauce 20%, and dried chili 10% as a price buffer.

Buyers

:

Business-to-business sales to food manufacturers, brand owners through toll manufacturing, and hotel, restaurant, and catering distributors.

Off-season

:

The model uses only about 52% of machine capacity; buffer stocks of frozen paste and dried chili, staggered planting, and multi-center sourcing keep production going outside peak harvest.

Raw-Material Price Controls

  • Price band of 25–33% of the farm-gate price; ceiling below the 33.9% break-even
  • Contract farming with farmer groups for a base volume
  • Multi-center sourcing across different harvest seasons
  • Buffer stocks of frozen paste and dried chili
  • Price-adjustment clauses with industrial buyers

Investment Offering Options

Single project — offered to investors in the matching business: fiber processors for Coconut Coir Project, food manufacturers for Chili Project.

Agro Green Investment Platform — one operator running several business lines in Tuksono with shared facilities; each line keeps separate cash flows.

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

10 of 25

10

03. Legal Aspects and Business Model

Business Model Canvas — Coconut Coir Project

Key Partners

Farmers, collectors, cooperatives, and coir SMEs; industrial mentor partner; buyers; machinery suppliers; PLN and water provider; DPMPTSP and regional agencies; logistics partners.

Key Activities

Collection, grading, decortication, drying, baling, coir pith washing, quality control, dispatch.

Key Resources

Tuksono site, pilot line at the SME cluster, collection network, decorticators, drying yard, wastewater treatment, quality lab.

Value Proposition

Three products from one raw material: coconut fiber, bristle, and coir pith of consistent, traceable quality. Husk is bought as a by-product, so it does not compete with coconut markets and adds farmer income.

Customer Relationships

Specification-based contracts, quality certificates per shipment, repeat orders, joint technical trials.

Channels

Direct contracts with industrial buyers, distributors and exporters, the industrial mentor partner, product trials.

Customer Segments

Mattress and spring bed makers; growing media and horticulture; geotextiles and land reclamation; asphalt additives and soil stabilization; automotive as a later market.

Cost Structure

Husk purchase and collection, haulage, labor, power, water and wastewater treatment, maintenance, packaging, quality control, land lease, and loan interest. Investment of IDR 21.37 billion in two phases.

Revenue Streams

Sales of coir pith (±59%), bristle (±28%), and coconut fiber (±13%) at full capacity. EBITDA of about IDR 7.9 billion in 2036; rubberized coir as a later product.

Why Invest in the Coconut Coir Project

Abundant, low-cost raw material

Potential of ±124,000,000 coconuts per year; husk is bought as a by-product.

Three products from one input

Revenue spread across coir pith, bristle, and coconut fiber.

Risk tested in stages

An IDR 3.07 billion pilot tests supply, quality, and buyers before the commercial investment.

Domestic and export markets

Mattresses, growing media, geotextiles, and exports; an industrial partner is interested in mentoring and buying.

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

11 of 25

11

03. Legal Aspects and Business Model

Business Model Canvas — Chili Project

Key Partners

Farmers, farmer groups, and collectors; industrial buyers; food technologists and machinery suppliers; logistics partners; Agriculture and Food Office; DPMPTSP.

Key Activities

Purchasing and grading, washing, drying and grinding, wet processing, pasteurization, packaging, quality assurance (HACCP).

Key Resources

Food zone at the Tuksono site, dry and wet process lines, cold room, clean process water, quality lab, supplier network.

Value Proposition

A seasonal value buffer: grade B/C chili that is still food grade and harvest surpluses are turned into shelf-stable paste, sambal, and dried chili that meet buyer specifications and are traceable.

Customer Relationships

Letters of intent or offtake contracts, joint product specifications, repeat orders, food-safety documentation.

Channels

Direct contracts with industrial buyers, distributors, toll manufacturing, sample approval.

Customer Segments

Food manufacturers; brand owners (toll manufacturing); hotel, restaurant, catering, and retail distributors; industrial buyers of paste, sambal, and dried chili.

Cost Structure

Grade B/C chili within a price band, labor, energy, water, packaging, cold chain, sanitation, quality assurance, logistics, land lease, and loan interest. Investment of IDR 12.12 billion.

Revenue Streams

Sales of chili paste or ground chili (±500 t/year), sambal and sauce (±250 t/year), and dried chili (±33 t/year). EBITDA of about IDR 5.3 billion in 2036.

Why Invest in the Chili Project

Large, affordable raw-material base

Chili output of ±49,000 tonnes per year; grade B/C chili bought at about 30% of the farm-gate price.

Stronger returns

IRR of 16.6% and payback of 5 years 5 months in the base case.

Room to grow

Machine capacity is only about 52% utilized, so output can rise with demand.

Price risk under control

A price band, contract farming, buffer stocks, and buyer LoIs facilitated by the regional government.

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

12 of 25

12

04. Technical Aspects

Accessibility

Industrial carrying-capacity map of KPI Sentolo

National road

Yogyakarta–Wates, with collector roads to Tuksono

Planned toll road

Corridor passing through or near Sentolo

Railway

Sentolo and Wates stations

Yogyakarta International Airport

Located in Kulon Progo Regency

Tanjung Emas Port

Semarang, about 145 km

Truck access, turning radius, and road class to the site still need to be checked at the detailed design stage.

Infrastructure and Utilities

Utility

Current condition

Status

Next step

Electricity

PLN grid available around the area; the Tuksono substation cannot yet be relied on for project demand

Awaiting confirmation

Power availability letter and connection point from PLN

Water

Water for washing coir pith and clean water for food processing

Awaiting confirmation

Confirmation from the water provider or a groundwater permit

Wastewater

A treatment plant for each facility, matched to its effluent

Planned

Wastewater plant design and environmental approval

Access road

Collector road to the Wonobroto cluster

Available

Check road class and truck circulation

The regional government is facilitating the allocation of electricity and water from PLN and the water provider for the Tuksono area; official confirmation letters are a prerequisite before the investment decision. Utility status falls into three categories: available, planned, and awaiting confirmation.

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

13 of 25

13

04. Technical Aspects

Plant Design of Coconut Coir Project

Conceptual site plan illustration; not a construction drawing.

Key Specifications

Item

Description

Capacity

5,000 husks/day (pilot) → 40,000 husks/day (commercial)

Land

±1.5 ha SME partner land (pilot); ±2.8 ha leased in Wonobroto (commercial)

Buildings

Production ±1,400 m²; warehouses and drying yard ±11,200 m²

Output

Coconut fiber ±960 t, bristle ±480 t, coir pith ±3,480 t per year

Power

±0.4–0.5 MVA; 500 kVA MV connection (subject to PLN confirmation)

Workforce

±180–220 people at a 50,000 husks/day benchmark

Process Flow

1. Husk receiving and weighing

2. Decortication into fiber and pith

3. Separation of fiber and bristle

4. Sun-drying and drying

5. Washing and screening of coir pith

6. Baling and block pressing

7. Warehousing and dispatch

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

14 of 25

14

04. Technical Aspects

Plant Design of Chili Project

Conceptual illustrations of the site plan and production area; not construction drawings.

The food zone is separated from the coir and biomass zones to meet hygiene and food-safety requirements.

Key Specifications

Item

Description

Land

±3,160 m² leased in Wonobroto, Tuksono

Buildings

±2,600 m²

Machine capacity

7.66 tonnes of fresh chili per day

Raw material

±1,001 tonnes per year (±52% of capacity)

Output

Paste ±500 t, sambal ±250 t, dried chili ±33 t per year

Workforce

±79 people

Standards

GMP/HACCP, halal certification, distribution permit

Process Flow

1. Receiving and sorting

2. Washing and grading

3. Drying, or grinding and cooking

4. Packaging and quality testing

5. Warehousing and cold chain

Buyer Commitment for the Chili Project: Steps within 0–3 Months

10–15

prospective buyers listed

Business

matching and sample trials

Templates

for LoI or MoU

1–2

companies signing LoIs

500 + 250 t

paste and sambal per year

Facilitated by DPMPTSP DIY and DPMPTSP Kulon Progo. Banks generally require a buyer LoI or MoU before disbursing investment loans.

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

15 of 25

15

04. Technical Aspects

Development Scenario

2026

Preparation and initial construction

Parcel verification, utility confirmation, supply contracts, and buyer letters of intent. Construction of the Coconut Coir Project pilot and the Chili Project plant.

2027–2028

Pilot operations

The Coconut Coir Project pilot operates to test supply, quality, and buyers. Chili Project starts operating with a gradual production ramp-up.

2028

Commercial-phase decision

The Coconut Coir Project commercial plant in Wonobroto is built if pilot results meet price, quality, and volume conditions.

2029 onward

Commercial operations

Coconut Coir Project operates at 40,000 husks/day. Further study of the biomass opportunity and shared facilities.

Shared Facilities

Weighbridge

Shared warehouse

Power and water network

Wastewater and waste management

Fire protection system

Truck traffic management

Quality laboratory

Estate management office

Go/No-Go Indicators for the Coconut Coir Commercial Phase

≥90%

of target supply for 6 months

≤+10%

husk price vs assumption

≥97%

selling price vs assumption

≥50%

commercial volume under LoI

500 kVA

PLN letter and land lease ready

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

16 of 25

16

05. Financial Aspects

Capital Expenditure of Coconut Coir Project (IDR million)

Component

Pilot

Commercial

Total

Buildings

1,029

8,636

9,665

Machinery and equipment

1,740

8,106

9,846

Licensing and pre-operation

83

502

585

Working capital

219

1,057

1,276

Total investment

3,071

18,301

21,372

Debt (60%)

1,843

10,981

12,823

Equity (40%)

1,228

7,320

8,549

Chili Project (IDR million)

Component

Value

Buildings

7,026

Machinery and equipment

3,293

Licensing and pre-operation

310

Initial working capital

1,493

Total investment

12,121

Bank loan (60%)

7,273

Equity (40%)

4,848

Total Investment Requirement

Project

IDR million

Coconut Coir Project

21,372

Chili Project

12,121

Total, two projects

33,493

Financing Structure

DEBT 60%

EQUITY 40%

Financial Model Assumptions

Parameter

Coconut Coir Project

Chili Project

Note

Projection period

10 years

10 years

Model assumption

WACC

7.83%

7.79%

Cost of capital calculation

Loan interest

8.2%

8.2%

Investment loan benchmark

Debt : equity

60 : 40

60 : 40

Model assumption

Tenor / grace period

8 years / 2 years

8 years / 2 years

Model assumption

Corporate income tax

22%

22%

Tax regulation

Price escalation

3.5% per year

3.5% per year

To be updated at financing stage

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

17 of 25

17

05. Financial Aspects

Projected EBITDA (IDR billion)

Feasibility of Coconut Coir Project

NPV

IDR 3.30 billion

IRR

11.0%

Net B/C

1.16

Profitability index

1.19

Payback period

7 years 3 months

Discounted payback

8 years 11 months

Minimum DSCR

1.62

WACC

7.83%

CONDITIONALLY FEASIBLE

Feasibility of Chili Project

NPV

IDR 6.78 billion

IRR

16.6%

Net B/C

1.59

Profitability index

1.64

Payback period

5 years 5 months

Discounted payback

6 years 9 months

Minimum DSCR

1.32

WACC

7.79%

CONDITIONALLY FEASIBLE

Coconut Coir Project is feasible but its margin is thin: IRR exceeds WACC by only about 3.2 percentage points. Chili Project has more headroom but is sensitive to the price of grade B/C chili and to selling prices. Conditional status means selling prices, supply, and buyers must be proven before full investment.

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

18 of 25

18

05. Financial Aspects

Sensitivity of the Coconut Coir Project

Scenario

NPV (IDR million)

IRR

Min. DSCR

Status

Base case

3,302

11.0%

1.62

Feasible

Building cost −20%

5,097

13.1%

1.75

Feasible

Loan interest +20%

2,425

11.0%

1.55

Feasible

Husk purchase price +20%

253

8.1%

1.51

Borderline

Production volume −10%

181

8.0%

1.53

Borderline

Selling price −5%

(1,028)

6.8%

1.46

Not feasible

Selling price −10%

(5,374)

2.0%

0.92

Not feasible

Bristle price −50%

(8,799)

−2.2%

−0.09

Not feasible

Sensitivity of the Chili Project

Scenario

NPV (IDR million)

IRR

Min. DSCR

Status

Base case

6,784

16.6%

1.32

Feasible

Building cost −20%

8,281

19.5%

1.47

Feasible

Production volume −10%

2,651

11.4%

1.15

Feasible, thinner margin

Grade B/C price at 33% of farm-gate

1,529

9.9%

1.03

Borderline

Selling price −5%

906

9.1%

0.98

DSCR below 1

Grade B/C price at 35% of farm-gate

(1,984)

4.9%

0.70

Not feasible

Selling price −10%

(5,007)

−0.1%

0.43

Not feasible

Break-Even Points (NPV = 0)

−3.8%

Coir selling price

+21.7%

Husk purchase price

−10.6%

Coir production volume

−5.8%

Chili selling price

33.9%

Grade B/C chili price relative to farm-gate (±IDR 10,270/kg)

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

19 of 25

19

06. Socio-Economic and Environmental Aspects

Employment Analysis

Project

Workforce requirement

Key skills

Coconut Coir Project

±180–220 people (50,000 husks/day benchmark; to be adjusted to 40,000 husks/day)

Decorticator operators, grading, drying, pressing, wastewater treatment, maintenance

Chili Project

±79 people

Food handling, drying and grinding, GMP/HACCP, cold storage, laboratory

Workforce figures are planning requirements and exclude shared services and supplier-level employment.

Local Economic Linkages

Coconut farmers and collectors

Additional income from husk without giving up existing coconut markets

Chili farmers and farmer groups

An additional sales channel for grade B/C chili and harvest surpluses

Cooperatives and coir SMEs

Roles as aggregators and suppliers of semi-processed material

Local food SMEs

Subcontracting opportunities in packaging and product sample trials

Economic Impact

Benefits to the region are measured through local raw-material purchases, logistics and maintenance services, contracts with small businesses, local wages, and regional taxes and levies. This study does not compute multipliers because no input–output model or project-specific household survey is available; local value should be recorded from the start of operations so that impact can be measured with transaction data.

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

20 of 25

20

06. Socio-Economic and Environmental Aspects

Environmental Aspects

Issue

Coconut Coir Project

Chili Project

Water and wastewater

High — coir pith washing; treatment from the start

High — processing and cleaning

Energy

Moderate

Moderate–high — dryers and cold chain

Dust and fire

High — fiber dust, stacked bales

Low–moderate

Food safety

—

Very high

Circular Economy

Coconut husk

coconut fiber and bristle

Coir pith

cocopeat for growing media

Chili harvest surplus

dried chili and paste

Chili organic residue

compost and organic processing

Sustainable Development Goals (SDGs)

SDG 8

Decent work and economic growth

SDG 9

Industry, innovation, and infrastructure

SDG 12

Responsible consumption and production

SDG 6

Clean water and sanitation

SDG 7 & 13

Clean energy and climate action (once baseline data exist)

SDG 17

Partnerships for the goals

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

21 of 25

21

07. Risks and Mitigation

PRE-CONSTRUCTION

Risks

  • Legal status of parcels and spatial-plan conformity not yet final
  • Power and water capacity not yet confirmed
  • Buyers not yet under contract
  • Investment costs still estimates

PRE-CONSTRUCTION

Mitigation

  • Parcel due diligence and spatial conformity (PKKPR)
  • Power and water availability letters before costs are fixed
  • Letters of intent or offtake contracts before full investment
  • Quotations from several machinery suppliers and contractors

CONSTRUCTION

Risks

  • Rising building and machinery costs
  • Delays in utility connections
  • Traffic disruption and community complaints

CONSTRUCTION

Mitigation

  • Contingency and final design before procurement
  • Joint monitoring of connection milestones with PLN
  • Truck schedules, route management, and a grievance channel

OPERATION

Risks

  • Husk collection below target
  • Volatile chili prices and seasons
  • Inconsistent product quality
  • Wastewater, dust, and fire

OPERATION

Mitigation

  • Collection points, cooperative contracts, and gradual ramp-up
  • Seasonal contracts with price caps; flexible product lines
  • Quality laboratory and specification limits
  • Wastewater treatment, dust control, hydrants, and safety audits

Decision Points before Full Investment

Decision point

Evidence required

Consequence if not met

Land and legality

Final parcels, ownership due diligence, spatial conformity, legal access

No irreversible construction

Utilities

Power and water availability letters, connection points, connection costs

Utility investment costs remain provisional

Supply

Supply contracts or MoUs specifying volume and quality; collection trials

Remain at pilot stage or gradual ramp-up

Market

Buyer specifications, product trials, letters of intent or offtake contracts

No premium prices in the base case

Food safety (Chili Project)

Process flow, GMP/HACCP plan, shelf-life validation

No commercial product launch

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

22 of 25

22

08. Conclusions and Recommendations

Market

Kulon Progo has large supplies of coconut and chili. Coconut fiber, coir pith, chili paste, sambal, and dried chili have clearly defined industrial buyer segments, although most are not yet under contract.

Legal

The site lies within an industrial designated area and is consistent with the RTRW, RPJPD, RPJMD, and RPIK. Licensing follows risk-based OSS; regional incentives exist and are assessed against set criteria.

Technical

The plants are designed for Wonobroto, Tuksono, with the Coconut Coir Project pilot hosted by the coir SME cluster. Power and water confirmation and detailed design are still required.

Socio-Economic and Environmental

The projects raise incomes of farmers, collectors, cooperatives, and SMEs and make use of agricultural residues. Wastewater, dust, fire, and food safety must be managed from the outset.

Financial

Coconut Coir Project (IDR 21.37 billion) yields an NPV of IDR 3.30 billion and an IRR of 11.0%; Chili Project (IDR 12.12 billion) yields an NPV of IDR 6.78 billion and an IRR of 16.6%. Both are CONDITIONALLY FEASIBLE: margins are sensitive to selling and raw-material prices.

Risk

The largest risks are husk collection, buyer commitment, chili prices, utility capacity, and land status. Phased investment and evidence-based decision points are the main mitigation tools.

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

23 of 25

23

08. Conclusions and Recommendations

Recommendations

Responsible parties

Land and Spatial Planning

  • Designate priority parcels in Tuksono
  • Complete verification of rights, access, spatial conformity, and land tenure arrangements

DPMPTSP DIY, Kulon Progo Regency Government, ATR/BPN, Public Works Office

Utilities

  • Obtain official confirmation of power and water capacity and connection points
  • Prepare each project’s load list before investment costs are fixed

PLN, water provider, Kulon Progo Regency Government, investors

Coconut Coir Project

  • Start the pilot phase with the coir SME cluster
  • Survey delivered husk prices, test quality, and obtain buyer price quotations
  • Review building costs and the start date of the land lease

Investors, cooperatives, coir SMEs, industrial mentor partner, Agriculture and Food Office

Chili Project

  • Prepare the machinery supplier layout and food-safety design
  • Secure supply contracts for grade B/C chili and buyer letters of intent

Investors, farmer groups, industrial buyers, Trade and Industry Office, Health Office

Buyer Commitment for the Chili Project (0–3 Months)

  • List 10–15 prospective buyers; hold business matching and sample trials
  • Target LoIs from 1–2 companies and record them in the investor data room

DPMPTSP DIY, DPMPTSP Kulon Progo, Trade and Industry Office, local food SMEs, prospective buyers

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

24 of 25

24

Future Expansion Opportunities

Not part of the ready-to-offer package

Rice Husk and Straw Biomass

Rice husk and straw can be processed into fuel pellets or briquettes for industry, with sugarcane bagasse as a supplement if its availability is confirmed. The opportunity does not yet have a stand-alone cash-flow model, a closed mass-energy balance, or a fuel purchase contract, so its NPV and IRR have not been calculated. It is therefore shown separately from the Coconut Coir Project and the Chili Project and can be upgraded to an IPRO once its prerequisites are met.

125,560 t

Kulon Progo rice output 2025

16,880 t

Sentolo rice output 2025

±IDR 22 bn

preliminary investment estimate

±1.5–2.0 ha

land requirement

800 kVA–1.5 MVA

power requirement

Prerequisites for Becoming an IPRO

1

Rice-mill census and raw-material volume

2

Delivered raw-material cost

3

Fuel specification tests (calorific value, moisture, ash)

4

A closed mass-energy balance

5

Letters of intent or fuel purchase contracts

6

A stand-alone cash-flow model for the Tuksono configuration

Link to the Estate

Reserve space in Tuksono can be prepared for this opportunity, drawing on shared facilities and residues from the Coconut Coir Project. Details are provided in Appendix J of the Final Report.

Investment Prospectus — Primary and Secondary Sector Investment Study, DIY 2026

DPMPTSP Special Region of Yogyakarta

Sentolo Industrial Designated Area — Tuksono, Kulon Progo Regency

25 of 25

Conceptual site plan illustration of the chili plant in Tuksono

Contact Us

Investment and One-Stop Integrated Service Office (DPMPTSP)

Special Region of Yogyakarta

Jl. Raya Janti No. 8, Wonocatur, Banguntapan, Bantul Regency, DIY, Indonesia

Office +62 274 4538737, +62 274 552521 · Call center +62 274 5021639

WhatsApp +62 821-1136-0606

dpmptsp@jogjaprov.go.id

https://jogjainvest.jogjaprov.go.id

All figures in this prospectus are taken from the 2026 Final Report of the Study on Primary and Secondary Sector Investment Potential Based on Leading Commodities in DIY and are indicative. Investment decisions still require due diligence, data verification, and approval by the relevant parties.