1 of 28

  • Planning Grant for Stormwater, Wastewater, and Community Resiliency from the MPCA
  • 2-part project

RCWD Climate Change & Floodplain Resiliency Project

2 of 28

  • Planning Grant for Stormwater, Wastewater, and Community Resiliency from the MPCA
  • 2-part project

RCWD Climate Change & Floodplain Resiliency Project

3 of 28

Core Directive: Foster collaboration among stakeholders that advance the implementation of priority actions

​

The Community Resilience Building Workshop is trusted by over 100 communities. It employs a

unique community-driven process.

​

Community Resilience Building Workshops

4 of 28

Core Directive: Foster collaboration among stakeholders that advance the implementation of priority actions

​

The Community Resilience Building Workshop is trusted by over 100 communities. It employs a

unique community-driven process.

​

Community Resilience Building Workshops

5 of 28

Core Directive: Foster collaboration among stakeholders that advance the implementation of priority actions

​

The Community Resilience Building Workshop is trusted by over 100 communities. It employs a

unique community-driven process.

​

Community Resilience Building Workshops

6 of 28

Community Resilience Building Workshops

Rice Creek�Watershed District

City of Hugo

City of�Lino Lakes

City of New Brighton

City of Roseville

City of White Bear Lake

Ramsey County

Washington County

Anoka County

Met�Council

Core Team

Organize workshops

Engage stakeholders- send workshops invites

Prepare materials for workshop

Help facilitate groups at workshop

7 of 28

Community Resilience Building Workshops

Determine weather, natural, and climate-related hazards

ID features, locations, ownership, etc.

ID existing and future vulnerabilities and strengths

Develop and prioritize actions

8 of 28

Workshop Activities: Risk Matrix

9 of 28

Increase stormwater management systems in parking lots

Increase buffer areas around lakes and streams

Integrate public art and creative educational campaigns to reach a variety of audiences

Increase and support urban green space developments and tree canopies

Make changes to turf grass ordinances to allow alternatives such as native plants

10 of 28

Results

Developed a Community Resilience Action Plan

Positioned RCWD for funding to implement the plan

Increased community awareness of climate-related issues in RCWD.

Support. Other city and county climate change initiatives and projects.

11 of 28

Up Next…

12 of 28

Floodplain Resiliency Project

Project Purpose:

  • Utilize the existing District-Wide model to assess future conditions climate change hydrology,
  • Identify vulnerable locations and communities related to higher rainfall total and intensities and,
  • Identify capital improvement projects reduce the risk to increasingly vulnerable areas
  • Funding: MPCA Grant

​

​

​

MPCA Understanding environmental justice in Minnesota

13 of 28

District-Wide Model

  • Completed in 2011
  • Updated Annually
  • “Model” 🡪 11 H&H models
  • Focus on the Public Drainage System
  • NOAA Atlas 14 Rainfall depths
    • 2-year: 2.8”
    • 10-year: 4.2”
    • 100-year: 7.2”
    • 100-year Snowmelt: 7.2”

​

14 of 28

Future Climate Hydrology

  • NOT a climatology study
  • Utilized EPA and other �available resources
  • 19% Increase in Rainfall Depth

15 of 28

Future Climate Hydrology

250-year 🡪 100-year

16 of 28

District-Wide Model

  • 19% Increase, equivalent to 1.4” across the 185 sq. mi. watershed
  • 13,800 additional acre-feet of runoff volume

17 of 28

Future Climate Hydrology �Change to Lake Levels

18 of 28

Long Lake = Increase of 1.3’

19 of 28

20 of 28

Potential Capital Improvement Projects

  • Proactive instead of Reactive
  • Storage on a Regional Scale
  • Optimal Locations
  • Areas that don’t change the general function of the land by storing more water

​

21 of 28

Potential CIP Screening

GIS Screening

  • Public Parcels
  • NWI
  • CPI

22 of 28

Potential CIP Screening

Manual Screening

  • Site size
  • Drainage Area
  • Location
  • Existing Floodplain

23 of 28

CIP Screening

7 Primary �Project Locations

22 Secondary Project locations

24 of 28

Concept Design Example

25 of 28

Potential CIP

26 of 28

CIP Locations

  • Site 2 – Jones Lake; RCD 5 / RCD 2 Main Trunk, New Brighton, MN
  • Site 3 – South Hansen Park; RCD 2 Main Trunk, New Brighton, MN
  • Site 7 – JD 2 Main Trunk; Forest Lake, MN

27 of 28

Outcomes

  • Value in having a District Wide Model
  • Identifying vulnerable areas and potential CIP sites prior to site loss due to development
  • Similar vulnerable areas compared to Future Land Use study
  • Locations with greatest risk related to future climate hydrology: JD2, Middle Rice Creek, Long Lake
  • Three CIP sites identified that provide greatest opportunity for reducing negative impacts of climate change risk
  • Having concept designs = access to multiple funding sources for implementation

28 of 28

Questions?

Kendra Sommerfeld, Rice Creek Watershed District

Bret Zimmerman PE, Houston Engineering, Inc.