1 of 24

Team 4

Automate Sample Measurement for Leco GDS 900

Risk Reduction Presentation

2 of 24

Project Overview: Background

  • Our Sponsor: Prof. Kenneth Vecchio & Dr. Haoren Wang
    • Advanced materials discovery
  • Sponsors Objective: Automate the elemental analysis via Glow Discharge Spectrometer

2

xx%

3 of 24

Project Overview: Objective

3

xx%

4 of 24

Project Overview: Hardware Requirements

  1. Positioning of wagon-wheel requires 3 DOF
  2. Precision: +/-.5mm
  3. Move and retract wagon-wheel between samples
  4. 3 seconds (~200mm Y and ~ 100mm Z)
  5. Press wagon wheel against O-ring
  6. 3.5-5N

4

xx%

5 of 24

Project overview: Software Requirements

4. Facilitate Communication between GDS900 Machine, CornerStone Application, and PLC

  • User Input requirements:
    • Start/Stop machine from PC
    • Vacuum seal response
      • Skip specific spoke
      • Try again
      • Abort

5

6 of 24

Project Overview: Constraints

  • Physical components must fit in enclosure
  • Electrical harnesses must fit through grommet
  • P1K PLC is limited to 15 expansion modules
    • I/O modules & ethernet module
  • Single spoke calibration

Units (mm)

6

xx%

7 of 24

Design Ideas

Rotating Gripper

2-Axis Gantry

7

8 of 24

High Risk Areas

8

xx%

9 of 24

Risk Reduction 1 - Gripper Design

9

10 of 24

Wagon Wheel Diameter Tolerance Analysis

10

11 of 24

Moving Forward

  • Going with the 2-Axis Gantry Design for aligning the wagon wheel

  • 3rd axis mechanism TBD

11

12 of 24

12

13 of 24

13

14 of 24

3. Deflection of y-axis rods

14

15 of 24

Questions and Challenges

15

16 of 24

Gantt Chart

16

17 of 24

Thank You

Questions?

17

18 of 24

Extra Slides

18

19 of 24

Application/Device Communication Risk Reduction

19

20 of 24

Extra Slides

Slider with in size constraints

Waggon Wheel Slipping

20

21 of 24

Movement of 3rd Axis

  • 2 Proposed Ideas:
  • Pushing Platform on Base Plate
  • Pushing mechanism built into gripper
  • Dependent on 2-Axis Gantry and must be finalized after

21

22 of 24

Pushing Platform on Base Plate

  • Ball Screw driven by servo motor with integrated force feedback
  • Moves the entire 2D Gantry
  • Low profile rails

22

23 of 24

Pushing Mechanism built into gripper

  • TBD after finalization of 2D gantry system and gripper (to accommodate dimensional constraints)

23

24 of 24

GDS Remote Client

Remote client enables customized programming of GDS commands

Achieved:

  • Remote Client login and connection
  • Learned GDS Commands syntax
  • Received information from GDS

Challenges:

  • Unable to send commands
    • Appears that no commands exist
    • Emailed LECO - awaiting response

Software Communication

24