PARTITIONS IN SCHOOLS
Duncaroo Designers: Charlie, Jacob, Andrei, Anh, Vivian, Rachel
Background
2
Defining the Problem
Socioeconomic Perspective:
3
Defining the Problem
4
https://cf-images.us-east-1.prod.boltdns.net/v1/static/5615998034001/c9b623fb-dd44-483c-b2bf-0ddd0372b358/d9ab7b82-fe3c-4989-90ae-458b85573ffe/1280x720/match/image.jpg
Defining the Problem
5
https://www.texastribune.org/2020/07/16/texas-shutdown-greg-abbott/
Goal:
Limit transmission of COVID-19 in schools
6
Design Criteria & Constraints
7
Design Criteria |
Affordable - less than $20 |
Adjustability - fits different desk sizes; materials can be substituted |
Easy to assemble - under 5 minutes / desk |
Easy to clean (materials could also be disposable) |
Safe for children - rounded edges on poles and dowels |
Durable - lasts > full academic year |
Idea Proposal
Cost: $9.18 with flexible vinyl sheeting
Manufacturing: Sturdy craft cardboard rolls with wooden dowels to stabilize between rolls and zip ties to secure to desk
Dimensions: ~ 24” x 24’’ x 27”
(can be modified to specific desk sizes)
8
Lunch Table Implementation
9
10
Low Fidelity Prototype
11
Low Fidelity Prototype
Cost Breakdown
12
Material | Amount Needed | Cost | Example Link |
Cardboard rolls | 4 rolls / desk | $4.28 | https://www.uline.com/Product/Detail/S-2643/Kraft-Mailing-Tubes/Kraft-Mailing-Tubes-with-End-Caps-3-x-24-070-thick |
Vinyl sheeting | 2 yards / desk | $4.10 | |
Wooden dowels | 3 dowels / desk | $0.7 | https://tinyurl.com/yylj49m4 |
Zip Ties | 8 zip ties / desk | $0.1 | |
Total cost: | | $9.18 | |
Levels of Cost
13
Cost | Posts | Clear Sheet | Stabilizers | Attachment to Desk |
High | PVC Pipes | 40 Gauge Clear Vinyl Roll | PVC Pipes | C-Clamp |
Medium | 3-Ply Kraft Cardboard Tubes | 10 Gauge Clear Vinyl Roll | Wooden Dowels | Zip Ties |
Low | Sturdy Craft Rolls | Saran Wrap | Wooden Dowels | Zip Ties |
Why This Matters
14
Implementation
15
Mid-fidelity
prototype and test physical principles
Contact Houston school districts and individual teachers
Distribute partition units to small
number of districts
4 weeks
2 weeks
1 week
Implementation
16
Data evaluation
and monitoring
phase
Distribute to wider range of districts in Texas
Expand nationally
and internationally
5 weeks
3-4 months
6 months-1 year
Why Our Solution
17
Sources
18
Sources
19
20
Questions?