Cedar River Watershed
Water Storage and Climate Resiliency
Cody Fox, CRWD Administrator
Bret Zimmerman PE, Houston Engineering, Inc.
OVERVIEW
CEDAR RIVER WATERSHED
BACKGROUND
EXISTING CAPITAL IMPROVEMENT SITES
EXISTING CAPITAL IMPROVEMENT SITES
“TYPICAL” DESIGN
2022 STUDY
FUTURE CLIMATE HYDROLOGY
This was NOT a Climate Change Study
18% Increase in Rainfall Depth
Return Period Probability | 100-year 1% Chance | 500-year 0.2% Chance |
NOAA Atlas 14 | 7.8 | 10.7 |
Future Climate Hydrology | 9.2 | 12.6 |
Stormy/Not as Stormy
Warm/Wet
Hot/Dry
High/Low Emissions
End of Century
Far Term Projections
STACKED HYDROGRAPH ANALYSIS
Where to prioritize
storage
…where not to
store water
STACKED HYDROGRAPH ANALYSIS
IDENTIFIED POTENTIAL CIP LOCATIONS
18 Identified Sites
1 – Upper Cedar River
2 – Roberts Creek
2 – Wolf Creek
4 – Middle Cedar River
9 – Dobbins Creek
PROJECT PORTFOLIOS
Design Criteria
100-yr < spillway
500-yr < TOD
Targeted 4” of �runoff storage
MODELING AND RESULTS
OUTLET OF DOBBINS CREEK
2022 STUDY SUMMARY
2023 CAPITAL IMPROVEMENT PROJECTS
LOCAL SUPPORT
Tracking and showing projects for public to follow along and understand projects and their locations.
EDUCATION AND OUTREACH
TAKE-AWAYS
Questions
Cody Fox, CRWD Administrator
Bret Zimmerman PE, Houston Engineering, Inc.