SAP Project System

Unit 2 Exercise 10, 11

Overhead Costing Sheet

for Project System

2 of 17

Investigating Overhead Costing for a Project

3 of 17

Network Type and Plant defaults Costing Variants

Project with Network

Costing Variant Determination

4 of 17

Network Type and Plant defaults Costing Variants

OPUV

5 of 17

Costing Variant Configuration

6 of 17

7 of 17

Note Valuation Variant 010 assigned to Costing Variant PS02

8 of 17

Project with Network

Costing Sheet Determination

9 of 17

10 of 17

Costing Sheet for Network

11 of 17

Costing Sheet

12 of 17

Costing Sheet

13 of 17

14 of 17

15 of 17

1 actual

2 planned

OH rates

16 of 17

Calculated Overhead is posted to this secondary cost element

17 of 17

Total Overhead Costs is

sum of line 50-70