1 of 26

Capital Project Proposal

1

2 of 26

Proposed Budget Summary

2

Initial project scope budget : $80 Million

Revised project scope (top priority items) $36 Million

Energy Performance Contract project: ($4 Million)

Final project scope

Proposition 1: $36 Million (not to exceed)

Proposition 2: $12 Million (not to exceed)

3 of 26

Building Condition Survey/Capital Improvement Project Planning Process

3

Two Propositions:

  • Many “End of Life” Components in Proposition 1
    • Health, Welfare, and Safety Concerns

  • Proposition 2 Cannot Pass without Proposition 1 Passing
    • Proposition 2 is Athletics/Fine Arts Heavy (turf/lighting)
    • Not Health, Welfare, and Safety Related

4 of 26

Building Condition Survey/Capital Improvement Project Planning Process

4

Tax Impact:

Proposition 1: $68 for home assessed at $100,000 without STAR

$49 for home assessed at $100,000 with BASIC STAR

$12 for home assessed at $100,000 with STAR Enhanced

Proposition 2: $85 for home assessed at $100,000 without STAR

$60 for home assessed at $100,000 with BASIC STAR

$16 for home assessed at $100,000 with STAR Enhanced

-First impact will be August 2025 at the earliest.

-20 Year Borrowing

5 of 26

Building Condition Photos

5

6 of 26

Building Condition Photos

6

7 of 26

7

Valley Primary - major BCS items

  • Select window reglazing project
  • Kindergarten ADA toilet room in classrooms
  • Elevator reconstruction
  • Classroom ceiling replacement
  • Replace end of life steam boiler plant, add air conditioning
  • Replace end of life Air Handler Units
  • New paving on east side of lot, repair select areas of pavement at bus loop

8 of 26

Valley Primary

8

Scope of repaving and paving repair at bus loop

9 of 26

Gorham Intermediate – major BCS items

9

  • Add ADA ramp at main entrance near bus loop
  • Roof reconstruction – liquid membrane on BOCES wing and a portion of original building
  • Elevator reconstruction
  • Classroom ceiling replacement
  • Replace end of life steam boiler plant, add air conditioning
  • Replace end of life Air Handler Units
  • Replace domestic hot water boiler system and main mixing valve.
  • New paving at east parking lot

10 of 26

Gorham Intermediate

10

Scope of roof reconstruction work

11 of 26

Gorham Intermediate

11

Scope of repaving

12 of 26

Middle/ High School – major BCS items

12

  • Brick reconstruction
  • Roof reconstruction – liquid membrane
  • Replace exterior metal panels at bus loop facade
  • Exterior door replacement
  • Reconstruction of Exterior Insulation Finishing System (EIFS) at MS gym
  • New pool deck finish, new bleachers, misc. pool work
  • Pool locker room renovation
  • PE locker room renovation
  • Elevator reconstruction at MS
  • Toilet room renovations (four main toilet rooms at HS)

13 of 26

Middle/ High School – major BCS items

13

  • Replace bleachers at MS gym
  • HS corridor locker replacement
  • Replace classroom ceilings at BOCES
  • Replace HS chiller, primary chiller pump and associated piping
  • Replace exterior wall louvers at BOCES
  • Replace older electrical panels
  • Reconstruction of east parking lot
  • Lights on field 3

14 of 26

Middle/ High School

14

Scope of roof reconstruction work

15 of 26

Middle/ High School

15

Scope of repaving

16 of 26

Transportation Center - major BCS items

16

  • Roof reconstruction –liquid membrane
  • Site/ roadway work/ fuel island canopy

17 of 26

Project Budget

17

Proposition 1:

Valley Primary $ 9.5 Million

Gorham Intermediate $ 9.5 Million

Middle/ High School $15.0 Million

Transportation Center $ 2.0 Million

Total: $36.0 Million

Proposition 2:

Softball field $ 1.0 Million

Baseball field $ 2.0 Million

Wildcat field $ 9.0 Million

Total: $12.0 Million*

*Fields will need $4M in repair if Proposition 2 does not pass.

18 of 26

Proposed Proposition 2

18

  • Valley - Softball field synthetic turf infield
  • Gorham - Baseball field synthetic turf infield
  • MS/HS - Wildcat field new track and synthetic turf stadium and associated upgrades

19 of 26

Wildcat Field

19

  • Turf field
  • Increase size of track

for wider soccer field

  • New track surface
  • New pressbox
  • Exist. bleachers to

remain

  • New scoreboard
  • New fencing

20 of 26

Valley Softball Field

20

  • Turf infield
  • Exist. grass outfield
  • New dugouts
  • New backstop/ fence
  • Turf bullpen

21 of 26

Gorham Baseball Field

21

  • Turf infield
  • Exist. grass outfield
  • New dugouts
  • New backstop/ fence
  • Turf bullpen

22 of 26

Energy Performance Contract

22

“An Energy Performance Contract is an Agreement with an Energy Provider that There Will Be Utility Savings with Updated Equipment, Lights, and Controls.”

Valley

  • Convert pneumatic controls to electronic
  • New lighting in select areas including classrooms

Gorham

  • Convert pneumatic controls to electronic
  • New lighting in select areas including classrooms

MS/HS

  • Convert pneumatic controls to electronic
  • New lighting in select areas including classrooms

23 of 26

Proposed Project Timeline

23

24 of 26

Proposed Project Timeline

24

25 of 26

Why Now??

25

  • Recession = Competition = Lower Labor/Material Cost
  • Construction Costs Increase 6.5% per Year at Minimum
  • Financial Impact will be August 2025 at Earliest
  • Many Items in Proposition 1 are End of Life Issues
    • Roofs
    • Boilers
  • Field Items in Proposition 2 will Need Repair Regardless to Remain Playable

26 of 26

Next Steps

26

  • Vote – December 13th 2022
    • 12PM – 8PM High School Gym