1 of 13

KHNP’s Confidence

for the Dukovany project

2 of 13

Contents

1 KHNP’s Strengths

2 On Time & Within Budget

3 Licensability for European Requirements

4 Substantive Localization

5 Mobilization of Manpower

6 KHNP, The Preferred Bidder

7 Cooperation with the Region

8 Czechia-Korea Cooperation

3 of 13

KHNP’s STRENGTHS

EXCELLENT CONSTRUCTION KNOW-HOW

COMPETITIVE COSTS

RELIABLE SAFETY

EXCELLENT PROJECT SCHEDULE

Design basis earthquake: 0.3g

Resistant to magnitude 7.0 earthquakes

Passive Auxiliary Feedwater System (PAFS)

Removes decay heat from the reactor core without power supply for at least 24 hours in the event of an accident

Severe Accident Mitigation System

Minimizes the off-site release of radioactive materials after a serious incident without external power or operators

PROJECT

KOREA

(APR1400)

FRANCE

(EPR1600)

DOMESTIC

Saeul 1

(98 months)

Flamanville 3

(2007 to present)

OVERSEAS

Barakah 1, 2, 3

(104, 107, 101 months)

Olkiluoto 3

(212 months)

Accumulated construction expertise over 50 years

TOTAL

IN OPERATION

28

UNDER CONSTRUCTION

3

DOMESTIC

25

DOMESTIC

2

OVERSEAS

3

OVERSEAS

1

36 UNITS

Planned for construction: 2 units

Shutdown: 2 units

Awaiting life extension: 1 unit

K

H

N

P

Source: IAEA PRIS

1

Dukovany New Nuclear Build

Latest most competitive cost

Cost reduced due to building 2 units

200 bil. CZK per 1 unit

4 of 13

ON TIME & WITHIN BUDGET

KHNP has never requested any deadline extension so far.

Dukovany Nuclear Power Plant (EDU5) will be completed in 2036.

MARCH 2022

INVITATION TO BID

BID PROCESS

NOV. 2022

Submitted INITIAL BID

2022 to 2023

OCT. 2023

Submitted UPDATED INITIAL BID

FEB. to MAY 2023

Participated in CLARIFICATION MEETINGS with THE OWNER (5 TIMES)

EVALUATION & NEGOTIATIONS

JULY 2024

PREFERRED BIDDER SELECTION

2024

MARCH 2025

CONTRACT CONCLUSION

PROJECT EXECUTION

2029 ONWARDS

2029

CONSTRUCTION STARTS

2036

COMMERCIAL OPERATION

APRIL 2024

Submitted UIB SUPPLEMENT

2

5 of 13

ON TIME & WITHIN BUDGET

KHNP has simultaneously constructed 9 units of nuclear power plants.

KHNP will deliver everything on time.

2000

2010

2020

2030

SHIN-KORI 1&2

SHIN-WOLSONG 1&2

SAEUL 1&2

SHIN-HANUL 1&2

SAEUL 3&4

SHIN-HANUL 3&4

BARAKAH 1&2

BARAKAH 3&4

SAEUL 2,

SHIN-HANUL 1&2,

SAEUL 3&4,

BNPP 1 to 4

CONSTRUCTED �9 UNITS AT THE SAME TIME

DUKOVANY 5

50 Years of Non-stop Construction

Success Story in the UAE

2

Unit 4 COD 5th of Sep.

Unit 1~3 in operation

FIRST NPP in the MIDDLE EAST

6 of 13

LICENSABILITY FOR EUROPEAN REQUIREMENTS

EUR CERTIFICATION

KHNP is familiar with European requirements, has acquired EUR certification for the APR1000

Discussions between regulatory bodies of both countries are ongoing to secure licensability

KHNP is pursuing Korean Standard Design Approval (SDA) for the APR1000 on time for licensing documentation submission for Dukovany NPP

STANDARD DESIGN APPROVAL (SDA)

REGULATORY COOPERATION

3

Classification

2023

2024

2025

2026

2027

2028

2029

Dukovany Project

SDA for APR1000

Preparation Phase

Review Phase

Issuance of Certificate

EPC Contract

(Mar. 2025)

Construction Commencement

(Aug. 2029)

Application for SDA

(Dec. 2024)

Issuance of Safety Evaluation Report

(Sep. 2026)

Issuance of SDA Certificate

(Mar. 2027)

EUR Certificate for the APR1000

Schedule for SDA of APR1000 for Dukovany

7 of 13

SUBSTANTIVE LOCALIZATION

“KHNP is the only company that will utilize the turbines produced in the Czech Republic.”

AREA

CORE STRATEGY

CZECH COMPANIES

Design

Consultation & joint design

with Czech companies

UJV Rez, I&C Energo, OSC, SKODA JS, Bilfinger Tebodin, etc.

Components

Subcontracting, categorizing based on technical difficulties

ABO Valve, I&C Energo, MICo, NUVIA, OSC, Sigma Group, SKODA JS, Skoda Power, VES, ZAT, BAEST, Chemcomex, IBC Praha, Infer, TES Vsetin, VALVEA, ZVVZ, etc.

Construction

Local workforce, materials,

construction equipment

and logistics, etc.

Metrostav DIZ, Arch. Design, Algeco, Baucomex, Bohemia Müller, CHB Logistics,

Colas CZ, ELECTROTRANS, Hilti, Hutni Montaze, Reko Praha, etc.

Maintenance

OJT&OJP (Training&Participa-

tion) based plant maintenance

I&C Energo, TES, Betvar, G-Team, HOCHTIEF, etc.

Nuclear fuel

Consultation for core design & safety analysis of nuclear fuel

UJV Rez, ALVEL, etc.

KHNP’s Localization Strategy

Over 200 companies identified by KHNP, total 1,000 companies by Korean companies & 76 MOUs concluded

4

8 of 13

MOBILIZATION OF MANPOWER

Labor Forces

(Expected 3,000 for 1 unit, 5,000 for 2 units)

Mobilize the labor forces from EU and other European countries in case of lack of workers in the Czech Republic

Mobilize the labor forces from the Czech Republic first as many as possible considering localization

Mobilize U.A.E. experienced labor forces under the Czech authority’s approval in case No. 1 & 2 are insufficient

Czech workers

European workers

Other workers

KHNP will mobilize Czech workers first as many as possible considering localization.

Priority

1

2

3

Countries preferred by the Czech Republic are priorities.

5

9 of 13

KHNP, THE PREFERRED BIDDER

6

“The Decision was unanimous.

“The Korean offer was better practically in all assessed criteria.”

- Prime Minister

· Shared Vision

for the Project’s Sucess

· KOR Government’s willingness

to Support

Special Envoys to Czechia

CEOs of CEZ and KHNP

Negotiation Kick-off

· Beginning the Preparation for the � Final Contract in March 2025

Press Briefing on the Selection of the Preferred Bidder(17th July)

10 of 13

COOPERATION WITH THE REGION

7

Construction Infrastructure

  • Office Buildings, Transportation, Energy, Communication, Logistics

Facilities for workers

  • Accomodation Facilities, Dining Facilities, �Medical Facilities, Commuting Facilities

· Preparing for Full-scale Construction starting from 2029

· Cooperation with the region is KHNP’s priority

KHNP will continue communicating with the region through ET and OHK Trebic

PROJECT PREPARATION

PROJECT EXECUTION

NEGOTIATIONS

2025

ENGINEERING

2027

LICENSING

2029

CONSTRUCTION STARTS

MAR. 2025

CONTRACT CONCLUSION

Dukovany 1~4

Dukovany 5&6

11 of 13

COOPERATION WITH THE REGION

7

Sponsor since 2018

Invitation program to Korea

Donation

Volunteer Program since 2017

KHNP will explore new collaboration programs based on the successful cooperation with the region.

12 of 13

CZECHIA-KOREA COOPERATION

  • No. 1 in terms of hydrogen car supply and hydrogen fuel cell production in 2021
  • MOUs for cooperation signed between Czech & Korean companies

IT & 5G

First country to commercialize 5G network (2019)

TOURISM

  • Direct flights between Praha & Incheon
  • More than 400K travelers per year

SEMICONDUCTORS

BATTERIES

No. 2 in the global market share for secondary batteries in 2021

  • Advancement of Korea’s high-speed rail to the Czech market

Secured supply chain for automotive semiconductors between the Czech Republic & Korea

DEFENSE & TRANSPORTATION

HYDROGEN

Cooperation in the nuclear industry can expand to multiple sectors.

8

13 of 13

DĚKUJI

BE GREAT TOGETHER