SAP Material Management
using ADSUBCON
for MM
Subcontracting processing
Item Category āLā subcontracting
scenario in PR
Message below because BOM not maintained for components to provide to subcontrctor but can enter manually here...
Enter components to provide to subcontractor..
BACK
SAVE
PR#
10013560
ADSUBCON
Souce Determination (Subcon PIR)
All PR related to material subcon-fg will be shown here
Click check box to show PR detail
Change PR
system branch to ME52N, change, save, and return to ADSUBCON
Convert
PR to PO
ABSUBCON is a facilitation program, now it branches to ME21N
SAVE
No Message
Refresh
Note it is now refreshed as PO
Pencil will branch to ME22N
system branch to ME22N, change, save, and return to ADSUBCON
Use SD to delivery components to Vendor via DN
Current stock in our warehouse
subcon-rm1 1000pc
subcon-rm2 1000pc
Use MM to transfer components to Subcontractor
system branches to MB1B
note movement type 541 (transfer to subcon mov type)
special stock āOā 10pc at subcontractor
MB52 same info
10 at subcon
990 remain at own store
subcon-fg now
0 stock at store
GR completed FG or Assembly
System branches to MB01 for GR of FG
and GI of RawMat
101+
GR of subcon-fg
541-
GI of subcon-rm1
GI of subcon-rm2
subcon-rm1 and rm2 now 990
subcon stock 10
consumed
subcon-fg received 10
subcon-rm1 and rm2 now 990
subcon stock 10
consumed
subcon-fg received 10
Refresh
PO not longer outstanding
Anticipating some changes in S4HANA ...