NOTICE:
ACE Power Systems will be performing code required testing of the emergency standby generator on , between the hours of .
The test will require two short interruptions of the emergency electrical power. (1-5 Seconds each). During this time brief power interruptions may occur. Elevator operation may be reduced during the test, we apologize for the inconvenience.
GENERATOR TESTING