Foundation Data Collection

After foundation pour, prior to skirt. In January winter conditions.

N

How did this get so far out? May be freeze-thaw? Bowed foundation forms?

0

0

-⅛”

+¼”

+¼”

+⅝”

0

Z height of Foundation at corners:

32’⅛”

15’⅞”

31’¾”

16’

Cross should be 35’9.4” (35.78’)

  • 2” off? Remeasure.
  • First, verify what the long side should be if short side is 16’ and diagonal is 35’11-½”:
    • 32.2=sqrt(35.96^2 -16^2)
    • -> long side should be 2.4” longer than 32’ if diagonal were this much.
  • Thus, measurement must be off! Remeasure.
    • Same measurement for diagonals (longtape)!!!
    • Conclusion: bad tape!!! The long tape is 0.75” stretched per 16 feet, and explains the discrepancy to within measurement errors.

35’11-½”

35’11-½”

16’¾”

16’½”

Same data day after

2 of 5

Gravity Pond filling

After one rain.

Depth 0

Depth 6’

14 year pecan

3 of 5

Foundation Hole for Plumbing Rough-In

Pictures

Depth 0

12-¾”

19”

22”

50-⅜”

4 of 5

Foundation Marking with String

Pictures

3’

  • String for level (z height) and XY (location)
  • Corner stakes must be in tight - string doesn’t sag
  • Laser square (look this up on wiki)

Forms - outside the 16x32

Forms - outside the 16x32

5 of 5

Corner Detail

Pictures

3’

Forms - outside the 16x32

Forms - outside the 16x32

Inside form - exactly 16’

Forms - outside the 16x32

Forms - outside the 16x32

Inside form - exactly 16’

Forms - outside the 16x32

Forms - outside the 16x32