Modular Shower Index
Abstract
The modular shower is an open source, parallel-built module with well-defined interfaces which is part of a 5 day parallel build of a complete Seed Eco-Home from scratch with a team of 30-60 people. Designed for an Extreme Build workflow, it allows for building the module outside of the house and installing it rapidly by putting it into place and making 3 plumbing connections: hot + cold water in, and 2” drain out.
Cunning Plan 1
Tub Shell
Base
Valve Panel
Shower Head 78” from base
Water Inlet + Outlet
Drain + Overflow
Drain Pipe, 1.5”
Divider Wall
Note that Plumbing Panel and Divider Wall sits on top of Pedestal, while West Wall sits on floor
West wall
Goes to 8’ Tall
West wall
Cunning Plan 2
Pedestal Top View
Pedestal Side View
31”
5’8”
5’
4’
17”
[5] 1x4 lumber slats
¾” OSB or Plywood
1.5” Hub to Slip Joint
1.5” PVC
Notch in OSB for plumbing
1.5” PVC
Extend this up so there is never standing water above mechanical joint
Do we really know this length?
Drain from sink?
2q
Wall section to fit
½” above X
X
Y
Bathroom Layout Concept
6”
Shower
4’ wide
Toilet Panel
4’ wide
Toilet out to Utility Room, pumped
Macerating Pump
Sink
3’ or 4’ panel
To drain pit
P Line
Commercial Version 2.5 slip in or 3” slip over
8’
2’2”
5’
(60” stall)
4”
Openable Panel
South Shower Wall Sits on top of Pedestal. South shower wall 8’ tall minus pedestal height.
Plywood covering South Wall is 8’ tall minus the amount needed to connect to top plywood for connection to ceiling.
4’
4’
2x4 Wall with Plywood on toilet side
Utility Channel
4’
1’
2x6 wall
Over utility channel
North Shower Wall Sits on top of Pedestal
Length will be determined by end of shower stall
Design Rationale
Conditions of Satisfaction for Modular Build
Pedestal + Panel Breakdown
6”
Shower Base
4’ wide
8’ long
2’2”
5’ long
4”
Pedestal 2
Shower base includes exit of tub
5’
31”
5’8”
2x4 wall ends even with shower shell
2x6 bathroom wall panel stands on top of pedestal on South side. Next East panel is not even.
2x6 bathroom wall panel stands on top of floor on West side
Water source lines
South panel includes valve plumbing, but is adjustable for final fit. Shell is predrilled for valve hole and faucet hole.
Shell is pre-drilled and leveling blocks are fixed to pedestal so that shell is simply placed on top of pedestal and fixed at bottom to East trim. Then South side is fixed by installing the South panel and fixing trim to vertical and top sides. Then W wall is fixed to floor and S panel
Move this over next to tub
Build + Install Workflow: Pedestal + Shell
5’
31”
5’8”
Pedestal Build:
Valve assembly:
Shower Shell:
Valve Panel
Tub Height
48”
31” to edge of shower
Shower Head 78” from bottom of panel
Spigot
48”
Adjustable plywood + cross members holding Valve Assembly
Valve
Steps for Fitting to Shower Shell:
Plywood backing
No Plywood backing up to 2” above valve (drainage and plumbing through-access is needed)
P-Trap Stub
(in Pedestal)
10”
20”
Top of Shower
Shell
14.5” away from leftwall
Reinforcing
Block above tub
Overflow Location
Bottom Drain
Width = 8.5
Valve Assembly vBOM
3”
Shower Head Screws in here
Water inlet
Water inlet
Faucet slips over the PEX
48”
Nip size should make for 5” vale-spigot separation
Visual BOM