The Demolition Phase consisted of the following:
- Remove remaining cabinetry and shelving
- Remove rods in the storage room
- Remove sinks, cap plumbing
- Remove staining room cabinet and blower system
- Remove all wood paneling in the main room
- Remove remaining conduit and wiring for the stage lighting system. Pull wires back to the utilities closet on the south side and secure
- Get the electric blinds cleaned and in working order
The Remodel Phase consisted of the following:
- Install New Alarm
- Clean up / repair sheetrock that is behind the paneling and other areas
- Paint all sheetrock surfaces
- Carpet the entire flooring area including side rooms and back storage
- Move all band equipment storage from F1/F2
- Install new musical cabinetry
- Install sound dampening solutions