1 of 31

Understanding how we work

Get rid of subpar systems… for good.

Let's get started

2 of 31

Checkpoints we will be hitting in these slides

PRE-GAME CONTEXT_

Align goals, metrics, and stakeholder vision.

Map future architecture and quantify returns.

Launch automations fast and upskill your team.

BLUE-PRINT AND ROI FORECAST_

IMPLEMENTATION SPRINT_

Uncover process gaps and baseline performance.

Refine, measure, and roll out company‑wide.

DISCOVERY & AUDIT_

OPTIMISATION & SCALE_

Ongoing support to lock in and grow gains.

BEYOND SCALE - BESIDE YOU_

Where inadequate systems come to die - Probably Ryan Reynolds

2025

3 of 31

PRE-GAME CONTEXT

1

4 of 31

Meet�the team

Where inadequate systems come to die - Probably Ryan Reynolds

2025

Insight & Alignment

Turns goals, risks, and exec intent into one crystal‑clear mission brief

Process Diagnostics Lab

Dissects every workflow and data touchpoint to expose bottlenecks and baseline KPIs

Solution Architecture Studio

Designs the future stack, models ROI, and sequences quick wins for sign‑off

Optimization & Scale Taskforce

Monitors live KPIs, iterates for efficiency, and rolls the solution into new teams

Implementation &

Enablement

Builds, integrates, and trains—owning go‑live and the first‑week success metrics

05

01

02

03

04

5 of 31

Rapid Time-to-Value

Documented Impact

Enterprise-Scale Performance

Cross-Industry Playbook

20 × faster build vs. Python scripts

40‑80 % efficiency gains across clients

4 K+ actions per second, single story

10 sectors, 120+ live automations

Trusted & Certified By Industry Leaders

Where inadequate systems come to die - Probably Ryan Reynolds

2025

No‑code stack lets us ship a production‑ready workflow in hours, not weeks.

Admin time cut 40 % – 80 % in property, insurance & contracting roll‑outs.

Architecture proven to spike‑load without throttling or data loss.

From property to print‑manufacturing, templates accelerate first wins.

Our Credentials

6 of 31

What we do

Audit the real bottlenecks.

Build Custom Automations INSIDE your Stack

Prove ROI before we code

Own the whole journey.

Train & Support Your Team

Work on transparent, fixed scope

Shadow your workflows, map every hand-off, and put numbers on the pain.

Any system. Any flow. All automated. We connect the tools you already paid for (or may need)

We layout the plan in its entirety BEFORE you say yes to anything. Total transparency.

One team. One contact through the whole journey. No confusion, no chaos. Just progression.

The entire system will be made so a clean handoff is what is expected. Not a system reliant on third parties. We will train your staff for you.

Whatever has been agreed, will be what stays. Any changes will go through the proper channels to ensure both parties are in the know for anything and everything.

7 of 31

And what we do not.

Guess from a template deck

Push proprietary platforms & licenses

Hide behind jargon or hourly billing

Disappear after go-live

Automate the spotlight issue but leave the hidden issues

Lock you into one vendor

We never prescribe “best practice” without seeing real data.

No bait-and-switch SaaS upsells—your stack stays your stack.

Scope, price, and ROI are locked in before a single line of code.

Baseline success is included; retainers simply add extra firepower—not patch neglect.

The goal is systemic throughput, not cosmetic macros.

Everything we build is API-driven and portable by design.

8 of 31

What we need from you

ACCESS & DATA

PEOPLE & TIME

COLLABORATION CHANNEL

Admin/API keys to your core apps (accounting, job management, email, file storage) plus a 90-day export of recent invoices and job logs—whatever tools you use.

Call out an upcoming event, workshop, onboarding talk, team-building exercise, etc.

Private Slack space for < 4 h approvals and questions

Where inadequate systems come to die - Probably Ryan Reynolds

2025

9 of 31

90-Day Timeline

This is just an indicator and not your actual plan. Plans are based on your actual circumstances*

Where inadequate systems come to die - Probably Ryan Reynolds

2025

Week 1 - Week 3

W1

W2

W3

Week 4 - Week 6

W4

W5

W6

Week 7 - Week 10

W7

W8

W9-W10

Week 11 - Week 13

W11

W12

W13

Discovery & Audit

Blueprint and ROI

Implementation Sprint

Optimisation & Scale

Pre-Game Context

Approvals/Sign-offs

Internal or client reviews

10 of 31

Pick Your North-Star KPIs

Job Turnaround time

Quote to Money Days

Approval Turnaround

Cost/invoice

Overtime spend

Overspending for multiple programs/softwares

Error Rate %

Customer NPS

Automatic Follow Ups

Cycle Time

Quote Accuracy

SLA hit %

Customer Satisfaction

No. of Orders

Web traffic management

Lead Generation

Gross Margin

Automation %

It doesn’t have to be these, but these are just to give you an idea on what you can have as your KPIs or what you would like to better in your business.

Extra KPI Options — pick the ones that matter

11 of 31

Risk Analysis & Mitigation Plan

Pain points/ Risks

Mitigation plan

Give participants a problem. Ask them to add pain points and solutions to the appropriate columns.

WHY RISK ANALYSIS MATTERS

Data-integrity gaps – missing fields, duplicate records, format mismatches.

System-throughput limits – APIs, webhooks, or batch caps choking volume.

User-adoption drag – staff cling to old spreadsheets / emails.

Security drift – stale admin tokens or over-broad permissions.

Scope creep – extra features appear mid-sprint.

Regulatory curveballs – new compliance rules mid-project.

Every automation project carries uncertainty—data hand-offs, system limits, user adoption, compliance.

We score each risk on Likelihood × Impact, then pair it with a mitigation owned by Holistc™ or your team.

Weekly reviews keep the list live: closed risks drop off, new issues get added before they bite.

Automated pre-migration validator → flags errors, fixes recipes; restore test on 10 % sample before cut-over.

Smart queue & back-off logic; off-peak scheduling; live “90 % threshold” alert in Slack

Role-based micro-videos, in-app nudges, 30-day leaderboard that rewards first movers.

30-day key rotation, least-privilege OAuth scopes, weekly audit-log digest emailed to the client champion.

Change-control gate: quick impact-vs-benefit check; non-critical items deferred to next cycle.

Policy watch-bot pings legal feeds; feature flags let us pivot without code freeze.

12 of 31

Discovery & Audit

2

13 of 31

Shadow & Observe

Where inadequate systems come to die - Probably Ryan Reynolds

2025

How we do it

Sit beside (or screen-share) with 2-3 key roles.

Note every click, hand-off, and wait state.

Disruption levels are low to none - We watch, they work.

Why this matters for the next step - It provides real data, not assumptions.

Time estimate* 2-3 business days depending on work area, busyness, etc.

14 of 31

Quick Interviews

Where inadequate systems come to die - Probably Ryan Reynolds

2025

How we do it

30-min chats with Sales, Operations, Finance leads.

Ask “What breaks? Where’s the drag?”

Disruption levels are low to none - calendar slots only.

This helps us capture tribal knowledge & edge cases. Real data.

Time estimate* ½ day total depending on work area, busyness, etc.

15 of 31

Where inadequate systems come to die - Probably Ryan Reynolds

2025

Process Mapping

What is Data System Pull? Well its to help us calculate real volumes, error counts, cycle times and baseline KPIs so we can properly map out all the complexities and system requirements for a clean and secure migration (or upgrade). This could be as easy as a CSV files of all the processed orders or can be a bit more complex like logs from each and every machine operating.

ENGAGEMENT LAYER

Web Lead ➜ HubSpot

HubSpot MQL ➜ Salesforce Opp

PandaDoc Quote (e-sign)

↘ NetSuite Order + Asana Project

Fishbowl Pick/Pack + Shippo label

SendGrid customer emails

Zendesk ticket on device alert

ORCHESTRATION LAYER

AWS IoT Core streams

live sensor data

Lambda ML predicts anomalies

Fivetran → BigQuery nightly

dbt models → Looker KPI boards

Delighted NPS auto-triggers

PagerDuty watches error logs

INTELLIGENCE LAYER

Routes every webhook/API call

Dead-letter queue & retries

Publishes to AWS SQS for scale

Kicks edge flows in Zapier / Make

Zapier (edge automations) | Make (complex branching flows)

Slack deal-won alert | Telemetry ≥ threshold ➜

Stripe pay → Xero reconcile | Simpro job + route plan

This is a real-world solution we built for an IoT hardware-as-a-service client (shared with permission). The map shows the original automation layer; they’ve since expanded with additional AI features.

16 of 31

Disruption Mitigation Check

Before we move on, we’ll run a Disruption-Mitigation Check—a brief but thorough audit that makes sure the incoming data loads without missing IDs or duplicates, all API keys are locked to read-only access, overall workflow volume stays safely below 70 percent of any rate limit, and both rollback snapshots and real-time on-call alerts are in place. If any of these conditions aren’t met, we halt the rollout, apply the necessary fix, retest, and only then proceed, ensuring go-live poses virtually no risk to your day-to-day operations.

Checklist:

  • Data Integration pass
  • Read only access locked
  • Throughput buffer
  • Rollback point set
  • User-adoption trigger
  • Compliance gate
  • Alerting wired
  • Comms plan

Every rollout passes this seven-point gate before we flip the switch.

Fail one box, we fix it first—so you never feel the hiccup

17 of 31

Opportunity Drafting

What you’ll see on the outcome page

What it is

A shortlisting session where we translate every pain point uncovered in Discovery & Audit into 3–5 automation or integration concepts, each ranked by effort, ROI potential, and disruption risk.

  • One-line description of each idea�
  • Effort tag (S / M / L)�
  • ROI tier (High / Med / Low)�
  • Disruption level (Low / Med / High)�
  • Next step (POC, scope, or backlog)�

Turning audit insights into concrete, high-ROI ideas

That set becomes the input for the Blueprint & ROI phase

18 of 31

What Success Looks Like — 90-Day Snapshot

40-80%

4-6×

Key Automations in Sprint 1

These are the outcomes and milestones we aim to hit once the first automation sprint goes live

Go-Live Milestone

System cut-over on day 45

Efficiency Gain

“We went from chasing problems to scaling with clarity—Holistc™ gave us back our time and our sanity.”

ROI Payback

Where inadequate systems come to die - Probably Ryan Reynolds

2025

Admin hours reclaimed

50%+ drop in staff time spent on manual tasks

On time payments

98-100% rent collected by due date

Head count avoided

2 planned hires no longer needed

19 of 31

Blueprint and ROI Forecast

3

20 of 31

future state blueprint

Unified Engagement Hub

Event-Driven Orchestration

Single-Source Core Systems

Intelligence & Resilience Layer

Where inadequate systems come to die - Probably Ryan Reynolds

2025

A single front door—web forms, e-sign quotes, Slack buttons—so every request starts in one place and arrives pre-structured. Users stop wondering “which system do I open?” and data enters clean from the first click.

A central brain that listens for webhooks and streams, then routes tasks through queues and retries automatically. Because the flows react to real-time events, work moves the moment it’s ready—no nightly batch delays or lost hand-offs.

Finance, operations and CRM each live in exactly one system of record after go-live. That clarity lets dashboards pull truth from a single table, eliminates double entry, and keeps audits straightforward.

Warehousing, dashboards, anomaly detection and on-call alerts sit above the flows, watching everything. Issues surface before users feel them, and leadership sees live KPIs that prove the automation is paying back.

21 of 31

Three ROI outlooks based on adoption speed, data quality, and volume growth.

ROI Sensitivity Forecast

1

2

3

Where inadequate systems come to die - Probably Ryan Reynolds

2025

Best-Case Scenario

• ROI 6 × (120 % net gain)

• Payback ≤ 3 months

• Admin hours cut 80 %

Conservative Scenario

• ROI 2.5 × (40 % net gain)

• Payback ≤ 9 months

• Hours cut 40 %

Expected Scenario

• ROI 4 × (75 % net gain)

• Payback ≈ 5 months

• Hours cut 60 %

22 of 31

Success Metrics We’ll Track from Day 1

Success Metrics Dashboard

“We measure what we promise—every KPI is pulled live and visible to you 24/7.”

Where inadequate systems come to die - Probably Ryan Reynolds

2025

Within the first 90 days we expect to slash the average hours spent on each job from roughly twelve to five, compress the quote-to-cash cycle from eighteen days to six, and drive data-entry error rates down from about four-and-a-half percent to one percent or less. We’ll track each of these figures in real time—drawing job-duration stamps from Simpro, stage times from HubSpot and Xero, and sync-failure logs from the automation hub—so progress is visible to everyone, not hidden in a spreadsheet.

These live metrics serve three purposes: they prove the automation is paying for itself as it runs, they give us an early-warning system if performance drifts by more than five percent in any direction, and they create a single scoreboard so Operations, Finance, and the Executive team are always discussing the same, up-to-date numbers instead of debating isolated reports.

23 of 31

Sign-Off & Sprint 1 Kick-Off

We’re ready to start building—sign here and Sprint 1 kicks off in three business days.

Where inadequate systems come to die - Probably Ryan Reynolds

2025

By approving the Blueprint, ROI forecast, and risk-mitigation checklist, you lock the scope, budget, and success metrics. We issue the fixed-price statement of work within one business day and schedule the 60-minute kick-off call within three. Your dashboards go live the same week, so the 90-day payback clock starts immediately.

Why this partnership works� • Shared scoreboard — live KPIs visible to both teams 24/7� • Fixed scope — no surprise invoices, no shifting goalposts� • Single pod — the same Holistc™ crew from discovery through scale� • Risk gate — we don’t deploy until every mitigation box is ticked

What happens next

  1. Sign & date the SoW (e-sign link in email).�
  2. Issue read-only API keys and grant Slack channel access.�
  3. Join kick-off call → sprint backlog reviewed → first ticket starts.

24 of 31

Implementation Sprint

4

25 of 31

“Did the numbers move once we went live?”

“Within two weeks of go-live we could literally watch the manual hours drop in real time—no spreadsheets, no chasing, just proof that the new system was working.”

Day-15 KPI Snapshot

Where inadequate systems come to die - Probably Ryan Reynolds

2025

Day 15 is our first performance checkpoint. We stream live data from the finance, ops, and CRM systems you already use, then display the three KPIs the project set out to change—Efficiency, Speed, and Quality. Nothing is manual; dashboards refresh every hour so you can track progress without waiting for month-end reports.

Tile Label What the metric mean How to read it

EFFICIENCY

Hours per Job

Lower is better

SPEED

Quote to cash Days

Lower is better

QUALITY

Data Entry Error %

Lower is Better

26 of 31

Optimization & Scale Roadmap

5

27 of 31

Optimization & Scale Roadmap

Week 6 quick tweaks

We spend two weeks shaving seconds off every click: removing redundant steps, tightening alert thresholds, and deploying two backlog automations. The goal is to lock in early wins before we invite more users.

Month 3 – Cross-Team Roll-out

With core KPIs stable, we clone the proven workflows into a second department and onboard those users with a short enablement clinic. ROI now multiplies without additional build cost.

Month 6 – Enterprise Scale

We stand up a fail-over instance, layer on predictive analytics, and pipe the cleaned data into the company-wide BI stack. The solution graduates from “dept tool” to resilient enterprise backbone.

28 of 31

Beyond Scale - beside you

6

29 of 31

Continuous-Improvement Loop

“Who watches this thing after the sprint?”

Where inadequate systems come to die - Probably Ryan Reynolds

2025

Most clients keep Holistc™ on call. They choose a light retainer (Kronos Lite) for monitoring + bug-fix SLAs, or a growth retainer (Kronos Growth) that adds new micro-builds and quarterly ROI reviews. Pricing tiers, SLAs, and upgrade add-ons are outlined at https://holistctm.com/pages/pricing.

After-Sprint Ownership Options

Full Handoff – You take the wheel internally. We export the workflows, revoke our keys, move all secrets to your vault, and deliver a final playbook that shows you how to restart, roll back, or extend every automation. From that moment the stack is 100 % yours, and so is the operational risk. If an issue later proves to be a defect in our original build, we’ll fix the code free of charge—but we aren’t liable for revenue loss once the sign-off is complete.

Retainer Support – We stay in the loop on a monthly retainer. You get priority tickets, 24-hour response, and proactive dashboard monitoring. We don’t do your daily ops work; we keep the automations healthy and jump in if a flow breaks. Higher tiers move you to same-day response and include small enhancements.

Ad-Hoc Rescue – No retainer, no strings. If something goes wrong that traces back to our code, we’ll patch it free—just email support. Anything new or out of scope is quoted as a one-off mini-project.

30 of 31

Questions? Let’s talk.

These slides are meant to guide the conversation, not replace it.

If anything feels unclear—or you’d just like to explore an idea in more depth—drop me a note at zain@holistctm.com and I’ll respond within one business day (often much faster).

31 of 31

Ready to Build?

If you haven’t filled out the short intake form yet, head to� holistctm.com/pages/start-build and lock in your spot—it takes less than five minutes.

Already submitted? You’re all set. I’ll review your details and reach out with next-step options within one business day.

Have a question in the meantime? Email me anytime at zain@holistctm.com and I’ll get right back to you.

Congratulations for making it to the end!

Remember—efficiency isn’t about doing more, it’s about doing less of the stuff that wastes your tequila money.

— Probably Ryan Reynolds