Project Selection Committee�Project Types and Intake Streams�
2
Project Type | Definition |
Hardware Solution | Projects where the solution is purely hardware focused |
Software Solution | Projects where the solution is purely software focused |
Hybrid | Projects which consist of both a hardware and software component(s) |
Intake Streams | Target Objective for Helpful |
Ideation | Mentor a project towards Pre-Incubation |
Pre-Incubation | Mentor projects towards an MVP |
Incubation | Mentor projects towards prototype scaling and product market fit |
MVP | Partner with projects to support scale and distribution activities |
5 stage PLM Lifecycle
Design and Simulated Testing
Stop
Architect/re-architect the product + update change register (create if this is the first pass)
Populate library with updated version
(0.1 increment)
Create testing plan against risks and specifications
Perform simulated testing and document outcome
Construction phase
QA/RA Initial Documen-tation
Initial Business Analysis
Project plan
Project risk register (Risks to the project)
Initial market analysis and viability
Refine Submission
Ideation and�Basic Concept
Project Requirements Assessment
Physical/Deployment Testing
Minimally Viable
Engineering Product
Risk characteristics
(hazard Identification)
System risk analysis and mitigation plans
General helpful requirements specification
User requirements specification
Fail
Pass
Fail under safety or ethical grounds
Interim design review
Pass
Project concept to be presented to selection committee
Pass
Helpful project agreement
Write residual risk acceptance and manufacturing + QC plan
Final design review against criteria
Minimally viable engineering product
Populate library with V1.0 version
Product component requirement specification
Product architecture requirements specification
Final design review assessment criteria creation
Full regulatory standards assessment with helpful support
Project selection review
Fail
Perform Physical testing and document outcome
Pass
Fail
Update initial QA/RA documents
Pass
Ideation and Basic Concept
Helpful Review
Project Requirements Assessment
Design and Simulated Testing
Physical/Deployment Testing
Minimally Viable Engineering Product
Fail
Project Selection Committee�Incubation Support for Projects�
4
What do Projects need? | What does Helpful provide? |
Project Management |
|
Funding |
|
Manufacturing |
|
Technical Mentoring |
|
Access to Resources |
|
Marketing & Network |
|
Product Strategy |
|