SAP PM Overview

SAP PM Team

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 1

2 of 42

�Agenda

    • SAP Overview
    • SAP PM Overview
    • SAP PM Master Data
    • SAP PM-MM/FI Integration
    • Work Order Management
    • Preventive Maintenance Process

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 2

3 of 42

  • Industry best practices for business processes
  • Seamless Integration of business processes
  • One system for all functions
  • Improvement in quality of information
  • Online data entry & Data transparency
  • Authorization matrix
  • Reduction in document flow across various departments
  • Online Reporting for decision making & activity monitoring

SAP Overview

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 3

4 of 42

�Various Data Types in SAP

  • Customization Data / Key Data Structure (KDS)

  • It represents data which is customized according to the needs of the organization. Defined only by the implementation team members (Consultants / Core Team Members) as an one-time activity.

  • Master Data

  • This data explains the characteristics and attributes. It is defined by Core Team Members (CTM) and updated as and when required

  • Transactional Data

        • It records the execution of business processes in the form of transactions. This data is recorded in the system by end users as a routine activity

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 4

5 of 42

�SAP Plant Maintenance (PM) Overview

SAP Plant Maintenance is a core SAP ERP module, integrated into the logistics chain of the R/3 System, that helps management in performance of maintenance tasks, including:

  • Representing organizational structures within maintenance
  • Representing and managing maintenance objects in detail
  • Planning and processing maintenance tasks in detail:
    • Inspection ; Determining the actual condition of a technical system
    • Preventive maintenance ; Maintaining the ideal condition of a technical system
    • Repair ; Restoring the ideal condition of a technical system
    • Constructing and modifying technical systems
  • Processing external services.
  • Performing cost planning and cost determination
  • Recording important data and enabling a maintenance information system(mis)

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 5

6 of 42

�Organizational Structure-Plant Maintenance

Planning plant

Planning

-

Based Organizational Units

Maintenance plant

Ex: Units 0725

Client

Maintenance Work

Center

Ex: 101, 102..115

Ex: Mech, Elec

Plant section

Location

Plant- SHAH

Company code- ADGD

Location

-

Based Organizational Units

Ex: P05, F05…

Maintenance planner

Group

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 6

7 of 42

�What are the Benefits of SAP PM?

  • SAP PM can consolidate all inspections, supplemental work, and corrective work into one common, standardized corporate-wide maintenance management system.
    • Improved visibility enables drive towards planned and preventive maintenance.
  • Integration with MM, FI/CO and HR/CATS captures cost information directly to the Work Order without rekeying, interfaces or validation errors.
  • Integrated processes automate reserving inventory and purchasing goods or services.
    • Increase procurement process efficiency, more control of availability of materials and purchased services.
  • Equipment information can be standardized so that consistent data is being collected and maintained.

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 7

8 of 42

�What are the Benefits of SAP PM?

  • Complete picture of costs and failures associated with an Asset.
    • Full cost visibility, powerful tool for decision whether to maintain or replace.
  • Planning of the work order will support improved utilization of both internal and external resources.

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 8

9 of 42

�SAP PM Structure Overview

1

2

3

SAP PM can be thought of as having three major sub-modules or processes.

Work Order Management

Preventive Maintenance

Master Data

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 9

10 of 42

�SAP PM Master Data

  • SAP PM Master Data is information which tends to remain static over time.
  • Master Data defines the objects which we are interested in (FLOC, EQ) and the attributes of those objects that are used for search, classification, reporting.
  • Attribute examples could include manufacturer, model, serial number, design specifications, size, weight, spare parts, location specific data, etc.
  • Master Data helps to represent the physical structure of your systems in SAP based on the Maintenance requirements.

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 10

11 of 42

�Functional Location

Functional Location (FLOC) is an SAP concept that describes where an equipment is located logically.

  • Functional locations are built in a hierarchy so that a user can start at a general location and drill down to a specific location.
  • Functional Locations are a basis for organizing Assets logically, facilitating search for Assets and as a roll-up mechanism for reporting.
  • The design of Functional Location for an organization must consider all the potential uses.

Str. Ind.

Structure Ind. Text

Edit Mask

AHSN

AHG Structure Indicator

XX-XX-XXXX-XXXX-XXXX-XXXX

Mask

Level

Remarks

XX

1

Abu Dhabi Gas Development Company Ltd

XX

2

Shah Gas Project

XXXX

3

Plant Area

XXXX

4

Unit

XXXX

5

Processing Unit

XXXX

6

System Unit

FL

FL

FL

AD (1st level node)

AD-SH (2nd Level)

AD-SH-AR02-0725 (4th Level

FL

AD-SH-AR02 (3rd Level)

FL

FL

AD-SH-AR02-0725-ES09 (5th Level

AD-SH-AR02-0725-ES09-E209 (6th Level

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 11

12 of 42

�Equipment Master

Equipment Master (EQ) describes a specific equipment and its attributes such as manufacturer, model, serial number, status, design specifications, size, weight, etc.

  • Examples of equipments could be the machinery, production Equipments, etc.
  • Equipment may have sub-equipment linked to them, which can be defined and maintained in their own right.

AD-SH-AR02-0725-ES09-E209 (6th Level

FL

FL

FL

AD (1st level node)

AD-SH (2nd Level)

AD-SH-AR02-0725 (4th Level

FL

AD-SH-AR02 (3rd Level)

FL

FL

AD-SH-AR02-0725-ES09 (5th Level

EQ

Transformer

  • Equipment's are “installed” into a Functional Location so that the relationship of equipment to F. location can be established and maintained.
  • If the Equipment is removed, then it is “dismantled” from the specific location and its replacement equipment is “installed” into the Functional Location.

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 12

13 of 42

�Over all Structure

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 13

14 of 42

�Equipment Bill of Materials (BOM)

An Equipment BOM is a data structure that describes the structure of an equipment in terms of MM Material Master Numbers. The BOM may be a complete structure , intended to describe the construction of the Equipment, or a partial structure , for example to designate spares.

FL

EQ

Shearing Machine

BOM

MM

MM

MM

  • SAP can track changes to the BOM over time.
  • BOM can be unique to a specific equipment, or using the ‘construction type’ field one BOM can � be assigned to multiple equipments of the same type.

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 14

15 of 42

��Work center�

The Work center usually represents one person or a department, responsible for ensuring that the maintenance work in an order is executed

Functions:

    • Costing can be determined based on the standard values specified for the activity types
    • Scheduling can be done for the operations

Examples of

maintenance

work centers

Mechanics

Electricians

Cleaners

Plumbers

Welders

Instrument Technicians

Carpenters

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 15

16 of 42

�Classifications and Characteristics

The SAP Classification system is a powerful feature that enables classification schemes to be set up for Functional Locations, Equipment .

Classification enables the definition of additional fields, together with business rules – i.e. mandatory / optional, validated against list of entries.

Classification entries can then be used to search for and to report on different objects.

  • Classifications are used to group Functional Locations and Equipment Master records of the same type
  • Characteristics are assigned to a Classification
  • Individual Characteristic values are assigned at the unique Functional Location or Equipment Master record to identify specific attributes for that object.
  • Characteristics can record many different types of attributes, such as what something is, different measurements and dimensions values, where it is and what is its status.

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 16

17 of 42

�Measuring Points

A Measuring Point is a physical or logical point where measurement readings are taken.

  • Measuring Points can be assigned to equipment or functional locations (each can have more than one measuring point)

  • A Measuring Point is a physical or logical point where measurement readings are taken.
  • Measuring Points are configurable for specific applications and can be used as counters. Examples:
    • Odometer readings
    • Run time in hours
    • Thickness readings for wear points
    • Temperature readings
    • Vibration analysis point
  • Measuring Points can identify the automatic creation of a Preventive Maintenance Work Order when a reading is captured outside of the desired tolerance. E.g. change oil every 3000 miles

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 17

18 of 42

�Task List

  • Task list master data contains the information on activities to be performed for maintaining an equipment
  • Task List master data contains :
    • Activity list – Operations to be performed
    • Activity duration –e.g. 4 hours
    • Work involved –
    • Maintenance packages – Tools etc.

  • Task Lists are used
    • To create Operation lists in maintenance orders
    • To Schedule preventive maintenance orders

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 18

19 of 42

��Plant Maintenance Integration�

SAP Plant Maintenance (PM) is integrated with below mentioned SAP Modules. MM & FICO will be discussed in detail:

SAP ECC

Client / Server

ABAP/4

FI

Financial

Accounting

CO

Controlling

AM

Fixed Assets

Mgmt.

PS

Project

System

WF

Workflow

IS

Industry

Solutions

MM

Materials

Mgmt.

HR

Human

Resources

SD

Sales &�Distribution

PP

Production

Planning

QM

Quality

Mgmt.

PM

Plant

Maintenance

MM (Materials Management: Purchasing, Stores)

FI (Financial Accounting: Accounts Payable)

CO (Controlling: Costing, Financial Reports)

HR (Human Resources: CATS Time Entry)

PS (Project Systems: Capital Projects)

QM (Quality Management: Calibration)

PP (Production Planning: Capacity planning)

DMS (Document Management System)

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 19

20 of 42

�Materials Management Integration

  • Material Requirements Planner (MRP) is integrated to SAP PM to order new stock taking into consideration future work order material demands
  • Requisitions for non-stock materials can be created automatically from the SAP PM work order
  • Requisitions for services can be created automatically from the SAP PM work order
  • Purchasing is notified of the work order demand, procurement is commenced, goods and/or services are received and actual costs are captured in the original SAP PM work order for final settlement.

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 20

21 of 42

�Finance Integration

  • Financial postings are validated and posted in real time within the SAP system

  • Actual costs for materials, labor and services are captured in the SAP work order

  • SAP PM Work Orders costs are settled directly to a SAP cost object (Cost Center, WBS Element, Internal Order) within the SAP system

  • Comparison reports for Planned cost verses Actual costs are standard by work order, groups of work orders, equipment lists and functional location lists

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 21

22 of 42

�Work Order Management

3

Maintenance Work Order

Work Order

Cycle

Release Work Order

Enter Part and Damage Code

Create Work Order

Time Confirmations

Maintenance Required

Plan Work Order

Perform Work

Create Notification

Settle Order Costs

9

Close Work Order

10

Scheduled �(Planned)

Maintenance

1

2

4

5

6

7

8

Cost Object

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 22

23 of 42

�Basic Steps in Maintenance Processing

Malfunction, error

Request

Activity

PM Notification

what

when

where

tech. information

breakdown

Creating the Order

Planning the task

who

when, for how long

what steps

account assignment

resources

Execution

material issue

procuring N-Items

work steps

Techn. information

breakdown

causes

objects affected

activities

PM History

Completion

Requesting a

maintenance

Task

1

Order

Completion

confirmation

Completion

2

3

4

5

6

7

8

Plant

PM Planning

PM Workshop

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 23

24 of 42

�Maintenance Processing

Notification creation

Order required ?

Order Creation

Order Execution

Material drawing from stores

Work Clearance/permits

Technical Completion

Order Settlement

Costing

Notification Completion

Yes

No

Update technical history

Rectification

External services

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 24

25 of 42

�Notification

Notification is a “Request for Work”. This could be corrective, Breakdown, or preventive work. Notifications are only used to identify the work and as a historical document. Time and material cannot be charged to a Notification.

Upon completion of the work, the notification also contains the failure code history of the part that was damaged, what damage occurred, what caused the damage, and the activity that was perform to correct the damage.

As work is identified, whether by maintenance, operations, or others (e.g. referrals), a SAP Notification is created.

Notifications can be prioritized and statuses assigned for reporting and tracking purposes.

A Functional Location (Floc) and/or and Equipment Master (EQ) is assigned to a Notification. This provides the means now to identify all work for a specific piece of equipment, for all equipment in a specific area, or for all equipment in a general area.

Notifications are “routed” automatically to the Main Work Center and Planner Group which are identified on the FLoc or EQ.

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 25

26 of 42

�Structure of a Maintenance Notification

date/time/reported by

description

PM object: functional location

equipment

assembly

location data

account assignment data

breakdown/availability data

activity

performed by

Activities

dates

task description

Maintenance

tasks

damage location

damage

cause of damage

Text

Notification

items

Notification

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 26

27 of 42

�Work Order

A Work Order is used to plan, schedule, and execute the requested work (notification). Time, Material, and Services can be charged to the SAP Work Order.

Typically Notifications are reviewed and accepted and the planner or supervisor will create a Work Order from the Notification. Creation of a Work Order indicates the acceptance of the responsibility to perform the work.

Work Orders can be prioritized and statuses assigned for reporting and tracking purposes.

A Functional Location (Floc) and/or and Equipment Master (EQ) is assigned to a Work Order. This provides the means now to identify all work for a specific piece of equipment, for all equipment in a specific area, or for all equipment in a general area.

Work Orders are “routed” automatically to the Main Work Center and Planner Group which is identified on the Notification.

.

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 27

28 of 42

�Maintenance Work Orders

Work Order Types

  • Work Order Types enable better reporting, planning and scheduling and maintenance management

  • There can be many types of Maintenance Orders:
  • Examples:
    • Corrective order (PM01)
    • Preventive Order (PM02)
    • Breakdown order (PM03)
    • Refurbishment order (PM04)
    • Calibration order (PM05)
    • Shutdown order (PM06)

Work Order 384885

Work Order 384884

Work Order 384883

Work Order 384882

Work Order 384881

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 28

29 of 42

�Maintenance Order Functions

External�processing

Costs

Task list

BOM

Materials

Capacity planning

Operations

Work centers

Object list

Objects

Completion confirmation

Invoice receipt

Goods receipt

Purchase orders

Material issue

Shop papers

Order

Project

Asset

Cost center

Planning

Execution

Settlement

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 29

30 of 42

�Work Order System Statuses

  • Objects in SAP have a system status assigned to them as transactions are performed in the normal course of business.
    • For example, in PM functional locations and work orders have system statuses assigned that record their progress through the system.

  • Over 300 system statuses exist in SAP for all the modules

  • Within PM we are only concerned with a few that define significant events.

  • They are useful when searching for work orders.

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 30

31 of 42

�System statuses

System

Status

Description

Purpose

CRTD

Created

Initial status of the work Order

REL

Released

Orders created in SAP with this status allow procurement and financial transactions to occur against the order

TECO

Technically complete

Work on the order is completed. Financial follow-on functions (for example, time entry and invoice payment) are allowed.

CLSD

Closed

Order is completed, both technically and financially. No transactions of any kind are allowed. All costs have been settled.

PCNF

Partially confirmed

Set during the first occurrence of time posted against a work order

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 31

32 of 42

�System statuses

System

Status

Description

Purpose

CNF

Confirmed

Set when a flag is checked to indicate labor portion of the job is completed

PRC

Pre-costed

Set when the order is saved. Ignore it.

SETC

Settlement rule created

Set when an order has a settlement rule. All orders should be created with a default settlement rule.

GMPS

Goods movements posted

Set as soon as a goods movement occurs to issue or receive any materials in SAP against the work order

CSER

Error in cost calculation

Configuration or master data set-up problem

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 32

33 of 42

��Procurement of External Materials�

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 33

34 of 42

��Procurement of External Services�

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 34

35 of 42

�Job Completion - Time Confirmation

Time Confirmations are entered once the maintenance technician has completed the work or the work shift has ended.

  • Time Confirmations to a SAP PM work order are calculated by an individuals hourly rate or burdened rate

  • Actual labor costs are posted in real time to the work order using the number of hours confirmed/worked multiplied by the individuals assigned hourly rate

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 35

36 of 42

�Job Completion – History Reporting

History Reporting is the process of documenting what occurred on the job, any measurement readings, what the failure codes were, and updating, as required, any information associated with the job plan or SAP PM Master Data

  • Notifications capture the job history information
  • Upon completion of work the Notification must be updated with the historical information � about the maintenance repair
  • Standard codes are used to enable consistent input and reporting
    • Object Part Codes – identifies the part that required maintenance
    • Damage Codes – identifies the damage that was found
    • Cause Code – identifies the potential cause of the damage
    • Activity Codes – identifies the activities required to make the repair

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 36

37 of 42

�Job Completion – TECO and CLSD

TECO (Technically Complete) is the process to indicate that all maintenance work has been completed for the specific SAP Work Order.

  • Once the maintenance work is complete the work order status is changed to TECO. This indicates repairs are completed and no additional planned materials or time can be added to the work order.
  • This status is be used for list reporting of completed work

CLSD (Closed) is the process to indicate that all charges have been received for the specific SAP Work Order

  • Once all of the charges have been received against the work order, the work order status is changed to CLSD. No additional charges for materials, labor or services can be accepted. The work order is business complete.

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 37

38 of 42

�Preventive Maintenance

Purpose

Preventive maintenance should maintain the high availability of technical systems, for example, production plants, in the long term.

  • Legal requirements

  • Customer requirements
  • ( for example, automobile industry )

  • Reduction of system malfunctions

  • Reduction of system restart costs

  • Extension of system life
  • Increased productivity

  • Better capacity load control

  • Reduction of repair costs

WHY ??

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 38

39 of 42

�Preventive Maintenance Definitions

SAP Preventive Maintenance terms

Strategy defines the scheduling rules for a Maintenance Plan. It defines items like the unit of time and packages (frequencies). e.g. Unit of Time = Months; Package = 12, 24, or 48

Maintenance Plan defines the schedule for a preventive maintenance activity or activities and groups similar Maintenance Items together so that similar preventive maintenance work can be performed in the same time frame.

Maintenance Item defines which Functional Location or Equipment Master the preventive maintenance activity is to be performed on. Maintenance Items are assigned to a Maintenance Plan.

Task List is the pre-defined procedure that documents the preventive maintenance activities are, who should perform the task, and what material are required. Task List is assigned to the Maintenance Item.

.

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 39

40 of 42

�Preventive Maintenance Process

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 40

41 of 42

�Information Systems

Purpose

The Plant Maintenance Information System can be used at a variety of levels in the decision-making process as an instrument for monitoring, controlling and planning your business operations.

The Plant Maintenance Information System allows you to evaluate breakdown behavior, or the maintenance tasks of a technical system or machine. It is also possible to analyze the costs incurred or the party responsible for the maintenance tasks and the exact activities that have been performed. It is used in:

      • Reporting
        • Standard
        • Customized
        • Business Warehouse
      • Early Warning System

Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL

Page 41

42 of 42

Thank you

Page 42