Presentation Template: Instructor Comments
1
TITLE �DESCRIBE TOPIC AND PURPOSE�(ENTER DATE OF REPORT)
Name, Title of Presenter
Name, Title of Presenter
Department/Organization of Presenters
HEAD LAMP MANUFACTURING �MOLD CHANGEOVER REDUCTION�(NOTE: THIS IS A SAMPLE PROJECT PRESENTATION – �SLIDES/TOOLS WILL VARY BY PROJECT)
Adapted from project by Don Lynch,
Univ. of Michigan
Executive Overview (Optional: 1-2 slides)
Note: By including a summary of your main conclusions and recommendations in the overview, you give the audience a viewpoint from which to interpret the data you present.
4
Define Phase (1-3 slides)
Note: See report template, course notes, or other resources for more details
5
D
M
A
I
C
Project Metrics or Key Performance Indicators (KPI)
6
Example: Define Phase - Mold Changeover Study�(Setup Time Reduction Project)
Problem Statement:
Over the past year, injecting molding department has experienced an excessive number of mold changes with high mold changeover time per change resulting in excess labor hours vs. budget and inventory control issues. This has resulted in scheduling problems with headlamp assembly. This has been a chronic problem and is costing over $150K/year.
Scope:
Focus on reducing the number of changeovers and time per changeover for the 34 mold machines in the headlamp lens molding department.
Improvement Goal:
Eliminate mold changeovers taking longer than 2.5 hours.
7
D
M
A
I
C
Example: Head Lamp Assembly�Value Stream Map (VSM)
8
Setup Time
Reduction
Mold Department
(changeover)
Example: Potential Projected Savings for Changeover �(Selling the project business case)
9
D
M
A
I
C
Measure Phase: �Current State Performance (1-4 slides)
10
D
M
A
I
C
Example: Process Map - Mold Changeover Process
11
‘Cannot improve a process until you agree on what it is’
Changeover Process
D
M
A
I
C
Example: Measurement System Validation
12
P-Value = 0.456
No significant difference by group
Measurement System Accepted
D
M
A
I
C
Example: Process Stability Analysis (Consistency)
13
D
M
A
I
C
Example: Process Capability - Mold Changeover Time
14
Histogram – Changeover Time
D
M
A
I
C
Analyze Phase
15
D
M
A
I
C
Example: Qualitative Analysis - Cause-Effect Diagram
16
Or show using P-Diagram
D
M
A
I
C
Example: Quantitative Data Analysis �Mold Changeover Variables to Study
17
D
M
A
I
C
Example: Stratification Analysis by Machine ID
18
D
M
A
I
C
Example: Stratification Analysis - Changeover by Shift
Analysis By Shift: No Difference By shift (confidence intervals overlap)
19
D
M
A
I
C
Example: Pareto Analysis�(Top 2 Accounting for 50% of Lost Time)
20
Top two factors:
Waiting time for carts - 28%
Heating process - 21%
D
M
A
I
C
Example: Effect of Changeover Cart Availability
21
Cart Available: Yes=1
D
M
A
I
C
Example: Analyze Phase – Summary of Findings
22
D
M
A
I
C
Improve Phase
23
D
M
A
I
C
Some Possible Improve Phase Countermeasures
24
D
M
A
I
C
Example: Improve Phase Recommendations
25
D
M
A
I
C
Example: Improve Phase – Verification
26
D
M
A
I
C
Control Phase
27
D
M
A
I
C
Example: Control Phase – Mold Changeover
28
D
M
A
I
C
Post DMAIC – Changeover Verification Study
29
Summary
30