Seed Eco-Home

Master Checklist

2 of 18

Master Checklist

  • Foundation
  • Walls
    • Doors
    • Windows
  • Roof
    • Roof floor
    • Roof
  • Ground floor
  • Utilities
  • Logistics
  • Safety
  • Site Map
  • Communications
  • Tools

3 of 18

Iteration Checklist

  • Requirements
    • Who and what determines the requirements?
  • Design Foundation Forms
    • Are the requirements met in the design?
  • Critical Design Review
    • Are the designs technically sound?
    • What are the possible implications or consequences of the design?
    • What will prototyping considerations are expected?
    • Were the right people reviewing the design?
    • What documentation was performed as valid feedback?
  • Prototyping
    • What were the lessons learned or uncovered?
    • What percentage of re-work will be required?
    • Is the rework a result of ineffective CDR or constraints?

  • Instructionals
    • Replication - Can an individual reproduce the result without personal instructions? What is the bare minimum requirement or minimum via product?
    • How many layers of instruction is provided?
      • Cheat sheets
      • Video
      • Pictures
      • Animation
      • Exploded Diagram
    • Are the instructionals accessible?
      • On-hand(print)
      • Cloud
  • Final Review
    • Checklists - Are there checklists for tasks
  • Workflow
    • Tools
    • People
    • Processes
  • Commit to Build
    • BOM Checklist
    • Final Roll Call

4 of 18

Foundation

5 of 18

Foundation Checklist

  • Requirements
    • Whom and what determines the requirements?
    • Are they complete?
  • Design Foundation Forms
    • Are the requirements met in the design?
  • Critical Design Review
    • Are the designs technically sound?
    • What are the possible implications or consequences of the design?
    • What will prototyping considerations are expected?
    • Where the right people reviewing the design? SME
    • What documentation was performed as valid feedback?
  • Prototyping
    • What were the lessons learned or uncovered?
    • What percentage of re-work will be required?
    • Is the rework a result of ineffective CDR or constraints?

  • Instructionals
    • Replication - Can an individual reproduce the result without personal instructions? What is the bare minimum requirement or minimum via product?
    • How many layers of instruction is provided?
      • Cheat sheets
      • Video
      • Pictures
      • Animation
      • Exploded Diagram
    • Are the instructionals accessible?
      • On-hand(print)
      • Cloud
  • Final Review
    • Checklists - Are there checklists for tasks
  • Workflow
    • Tools
    • People
    • Processes
  • Commit to Build
    • BOM Checklist
    • Final Roll Call

6 of 18

7 of 18

Walls

8 of 18

Walls Checklist

  • Requirements Layout & Dimensions
    • Whom and what determines the requirements?
    • Are they complete?
  • Design (Development Document)
    • Are the requirements met in the design?
  • Critical Design Review
    • Are the designs technically sound?
    • What are the possible implications or consequences of the design?
    • What will prototyping considerations are expected?
    • Where the right people reviewing the design? SME
    • What documentation was performed as valid feedback?
  • Prototyping
    • What were the lessons learned or uncovered?
    • What percentage of re-work will be required?
    • Is the rework a result of ineffective CDR or constraints?

  • Instructionals
    • Replication - Can an individual reproduce the result without personal instructions? What is the bare minimum requirement or minimum via product?
    • How many layers of instruction is provided?
      • Cheat sheets
      • Video
      • Pictures
      • Animation
      • Exploded Diagram
    • Are the instructionals accessible?
      • On-hand(print)
      • Cloud
  • Final Review
    • Checklists - Are there checklists for tasks
  • Workflow
    • Tools
    • People
    • Processes
  • Commit to Build
    • BOM Checklist
    • Final Roll Call

9 of 18

Walls Checklist

  • 1st Floor
    • North wall
      • Door One
      • Door Two
      • Door Three
      • Window One
      • Window Two
    • South wall
      • Door One
      • Window One
      • Window Two
    • East wall
      • Door
    • West wall
      • Window One
      • Window Two
  • 2nd Floor
    • North wall
    • South wall
    • East rake wall
    • West rake wall

10 of 18

Doors & Windows

11 of 18

Walls Checklist

  • Requirements Layout & Dimensions
    • Whom and what determines the requirements?
    • Are they complete?
  • Design (Development Document)
    • Are the requirements met in the design?
  • Critical Design Review
    • Are the designs technically sound?
    • What are the possible implications or consequences of the design?
    • What will prototyping considerations are expected?
    • Where the right people reviewing the design? SME
    • What documentation was performed as valid feedback?
  • Prototyping
    • What were the lessons learned or uncovered?
    • What percentage of re-work will be required?
    • Is the rework a result of ineffective CDR or constraints?

  • Instructionals
    • Replication - Can an individual reproduce the result without personal instructions? What is the bare minimum requirement or minimum via product?
    • How many layers of instruction is provided?
      • Cheat sheets
      • Video
      • Pictures
      • Animation
      • Exploded Diagram
    • Are the instructionals accessible?
      • On-hand(print)
      • Cloud
  • Final Review
    • Checklists - Are there checklists for tasks
  • Workflow
    • Tools
    • People
    • Processes
  • Commit to Build
    • BOM Checklist
    • Final Roll Call

12 of 18

13 of 18

Roof

Roof Floor & Roof

14 of 18

Roof Checklist

  • Requirements
    • Whom and what determines the requirements?
    • Are they complete?
  • Design
    • Are the requirements met in the design?
  • Critical Design Review
    • Are the designs technically sound?
    • What are the possible implications or consequences of the design?
    • What will prototyping considerations are expected?
    • Where the right people reviewing the design? SME
    • What documentation was performed as valid feedback?
  • Prototyping
    • What were the lessons learned or uncovered?
    • What percentage of re-work will be required?
    • Is the rework a result of ineffective CDR or constraints?

  • Instructionals
    • Replication - Can an individual reproduce the result without personal instructions? What is the bare minimum requirement or minimum via product?
    • How many layers of instruction is provided?
      • Cheat sheets
      • Video
      • Pictures
      • Animation
      • Exploded Diagram
    • Are the instructionals accessible?
      • On-hand(print)
      • Cloud
  • Final Review
    • Checklists - Are there checklists for tasks
  • Workflow
    • Tools
    • People
    • Processes
  • Commit to Build
    • BOM Checklist
    • Final Roll Call

15 of 18

Roof Checklist

  • Roof Floor
  • Roof Walls
  • Roof

16 of 18

Ground floor

17 of 18

Ground floor Checklist

  • Requirements
    • Whom and what determines the requirements?
    • Are they complete?
  • Design
    • Are the requirements met in the design?
  • Critical Design Review
    • Are the designs technically sound?
    • What are the possible implications or consequences of the design?
    • What will prototyping considerations are expected?
    • Where the right people reviewing the design? SME
    • What documentation was performed as valid feedback?
  • Prototyping
    • What were the lessons learned or uncovered?
    • What percentage of re-work will be required?
    • Is the rework a result of ineffective CDR or constraints?

  • Instructionals
    • Replication - Can an individual reproduce the result without personal instructions? What is the bare minimum requirement or minimum via product?
    • How many layers of instruction is provided?
      • Cheat sheets
      • Video
      • Pictures
      • Animation
      • Exploded Diagram
    • Are the instructionals accessible?
      • On-hand(print)
      • Cloud
  • Final Review
    • Checklists - Are there checklists for tasks
  • Workflow
    • Tools
    • People
    • Processes
  • Commit to Build
    • BOM Checklist
    • Final Roll Call

18 of 18

Logistics

Site location- Site map and all equipment needs to be considered to plan workflows, transport of materials, and human needs during workshop.

Utilities:

  • Power: Gas Generators
    • 10kw GENERATOR
    • [2] 2KW HONDA GENERATORS
    • PV PANELS + CHARGE CONTROLLER
    • Fuel Tanks
  • Potable Water: Water Containers & Refreshment station
  • Port-o-John:
  • Tools: On truck or trailer
  • Workshop Checklist
    • Basic Tools
    • Modular tool kits
    • Materials list
    • Prototype modules as examples
    • Internet at Workshop
  • Video team
    • KC guy
    • Russell
    • Eric Go Pro