Who Pays for Load That Does
Not Arrive in Virginia?
Ryan Callahan, Jameel Jamhar, Dave McDonald, Michael Smith
Team Eggnomics
1
Meet Team Eggnomics
2
UC Davis Energy Graduate Group, advising the Commonwealth Energy Regulatory Commission on electricity affordability
David MacDonald
Jameel Jamhar
Ryan Callahan
Michael Smith
Problem Statement for CERC
3
WHAT COMMONWEALTH ENERGY REGULATORY COMMISSION (CERC) REQUESTED
CERC is seeking assistance in evaluating how electricity affordability should be defined, measured, and incorporated into long-term utility planning and regulatory decision-making amid significant projected load growth.
THE PROBLEM
HOW WE ANSWER IT
1
Defining and measuring affordability
Who is burdened, by how much, and where?
David MacDonald
2
Demand growth and its uncertainty
How much of the growth will arrive, and who pays if it doesn’t?
Jameel Jamhar
3
Reliability and infrastructure investment
What does reliable service require, and what should it cost?
Ryan Callahan
4
Regulatory decision-making
Which levers balance affordability against CERC’s other goals?
Michael Smith
Defining Affordability
4
Affordability can be defined as the Burden Gap
5
FIFTEEN HIGHEST-BURDEN LOCALITIES, 0–30% AMI HOUSEHOLDS
WHAT IT FINDS FOR VIRGINIA
373,645
households at or below 30% of area median income. 99% pay more than the 6% line allows.
16%
median electricity burden for that group, more than two and a half times the line.
$285.7M
a year to bring every one of them down to the 6% line, about $765 per household.
The 6% line is a convention, so we test it: $385.1M at 4%, $147.7M at 10%. The problem does not disappear under any line.
Monthly Bills & Rates
What electricity costs to customers: 14.41¢ per kWh in Virginia, 23rd-lowest in the country.
✕ MISSES What a household earns.
→
Energy Burden
The monthly electricity bill as a share of monthly income.
✕ MISSES What it would cost to fix.
→
OUR METRIC
The Burden Gap
The dollars a year needed to bring every household’s bill down to 6% of its income.
✓ In dollars, relevant to policy decisions
Affordability Differs by Customer Class
6
CLASS
WHAT AFFORDABILITY MEANS
HOW WE TREAT IT
Residential
Bill as a share of income; ability to stay connected
Burden gap and disconnections
Small commercial
Cost trajectory: rides the same rider stack as residential, without residential’s assistance programs
Track bill growth against a price index
Industrial
Price competitiveness against other states
Compare prices with other states
Large load / data center
Rate predictability and allocation fairness, not price level
GS-5 tariff
WHERE THE BURDEN FALLS
17.0% APCo vs 11.8% Dominion
Low-income burden is highest in Appalachian Power’s territory, where rates are 21% higher and incomes lowest. Yet 70% of the gap dollars sit in Dominion territory, where most households are.
WHAT THE IDENTIFIED GAP DOES NOT CAPTURE
461,586 disconnection events, 2024
Sixth-highest in the country. Once service is disconnected, the household drops out of the burden measure; but the costs do not. Collections, administration, and disconnection/reconnection can create additional system costs. CERC should track disconnections beside the gap.
Uncertainty Within Demand Growth
7
Demand Growth and Its Uncertainty
8
91%
of projected growth to 2046 is requested large load, mostly data centers, not metered demand
28.2 of 31.0 GW added, 2026–2046
DOMINION ALONE:
47 GW CONTRACTED, 16.6 GW FORECAST
47 GW contracted with Dominion, Jul 2025
16.6 GW filed with PJM for 2046
−65% Dominion’s own estimate
PJM’s own check trims only 2–9% more.
Nobody can yet say
how much will arrive.
Sources: PJM 2026 Load Forecast (Tables B-1, B-9); PJM LAS large-load requests (Sep 2025); Dominion Manual 19 letter.
Make Data Centers Carry the Risk They Create
9
$399M a year
what the GS-5 order keeps off household bills
$13.96 a month × 2.4 million Dominion households
RECOMMENDATION 1 Hold and extend GS-5
Model: 50,000 Monte Carlo draws for 2040, Dominion residential customers. JLARC Report 598 (2024); Va. SCC GS-5 order, PUR-2025-00058.
Folding Uncertainty into Planning Decisions
10
These five triggers each name a warning sign CERC can watch for, the action to take, and what it is worth to households.
GATE
TRIGGER
WHO ACTS
WORTH, $/MONTH AT 2040
Hold the minimum-take order against ex-post relief
Any waiver, true-up or retroactive relief against GS-5 terms
CERC
$13.96
loss avoided
Milestone-tiered forecast inclusion
Above-embedded MW entering the forecast at face value rather than at their milestone probability
PJM, CERC advocates
$4.17
Capacity-market exclusion for new large load
Incremental large load from DY 2029/30 that brings no supply
PJM Board, FERC
$2.71
Level the minimum demand charge across cost components
Generation recovering at 60 percent while transmission recovers at 85
CERC
$1.70
Stage the transmission commitment
An RTEP need case resting on above-embedded load more than five years out
PJM, CERC advocates
$0.19
CERC sets it directly
CERC advocates at PJM or FERC
The gates overlap, so the rows do not add. The top row is a loss avoided, since the order is already in force.
WHAT CERC CAN DO NOW
Keep the GS-5 order in force.
The SCC already requires large customers, mostly data centers, to pay a minimum share of the grid costs they trigger. Refusing any waiver or retroactive relief protects households from the largest of the five costs.
$13.96 a month at 2040 · Va. SCC
WHAT CERC SHOULD PUSH FOR AT PJM
Count requested load at its milestone probability.
The strongest thing Virginia can advocate for at PJM is carrying the speculative slice into the forecast at its milestone probability rather than at face value, which is what the California Energy Commission already does.
$4.17 a month at 2040 · PJM, Virginia advocates
Each gate priced by re-running the Monte Carlo with that rule in force, 2040. Precedents: FERC ER26-444 (AEP); CEC 2025 IEPR milestone tiers.
Reliability and Infrastructure Investment
11
Economic Reliability with Novel Investment
12
1
DEFINE RELIABILITY BY VALUE
Build until the next unit of capacity costs more than the outages it prevents (VOLL), not to a fixed 1-in-10 target. PJM’s reserve margin falls to 18.9% by 2029, below its 23.9% reference.
2
BASELINE COSTS KEEP RISING
Every newer estimate of Virginia’s buildout has come in higher than the last, so favor investment that can scale with demand over capital committed years ahead.
3
COST ALLOCATION
Evidence is split on whether data centers raise rates for other customers, and rate adjustment clauses weaken utilities’ incentive to control costs.
BEST COURSE OF ACTION FOR CERC
Require utilities to evaluate demand-side and NWA options before rate-basing a traditional build. Extend the investment requirement to large-load interconnection, consistent with current FERC large-load reforms.
NON-WIRES TRACK RECORD
Of ten leading U.S. projects, most deferred or eliminated the grid upgrade they targeted. E4TheFuture, PLMA, SEPA
Evaluation of Technology Investments
COST PER MWH (ACEEE 2026)
Energy efficiency, median
$21
Cheapest new gas plants
$45–108
Who Pays: Risks of Customer Exclusion
Recommendation of use of VOLL does not exclude the necessity for energy-burden evaluations and low-income stakeholder engagement.
VOLL prices outage risk, but it “cannot tell you whether the customers paying for that optimum are the ones benefiting from it.”
Regulatory Decision-Making
13
14
Large Load Tariffs, Flexible Interconnection, and BYOC can protect residential customer affordability
15
AFFORDABILITY
EQUITY
ECONOMIC DEVELOPMENT
Efficient pricing promotes efficient investment
16
PRICING
GRID UTILIZATION
Illustrative: a day of wholesale prices against flat and time-of-use retail rates
Load factor against residential share of sales, large utilities, 2024 (EIA-861)
AFFORDABILITY
EQUITY
Bill Assistance and PJM Market Reforms
17
BILL ASSISTANCE
PJM CAPACITY MARKET
Illustrative: household energy burden across localities, with the 5% and 10% payment caps marked. 1% standard deviation to match ACEEE's reporting the 25% of households have an energy burden higher than 6%. Made with county-level data from Virginia Conservation Network and PSE Health Energy.
Recommendation to CERC
18
1.
Build on GS-5 to properly allocate cost of uncertainty to prospective loads
Investigate introducing minimum monthly demand charges or load factors to existing large load
Consider introducing some mandatory flexibility terms for new loads
CERC ACTS DIRECTLY VIA ITS OWN TARIFF
2.
Pursue/support opportunities for flexible interconnection and BYOC with reliable local DER flexibility and energy efficiency
CERC ACTS ALONGSIDE PJM AND FERC FOR INTERCONNECTION REFORMS
3.
Embrace pricing strategies for all customer classes that better approximate marginal cost of production while shielding from cost-shift (RTP, fixed charges)
CERC ACTS DIRECTLY WITH RETAIL RATE DESIGN
4.
Actively participate in the PJM stakeholder process to advocate for an economically-sound solution beyond a capacity market cap
CERC ADVOCATES WHILE PJM AND FERC DECIDE
Thank You
We welcome your questions.
19
Ryan Callahan
recallahan@ucdavis.edu
Jameel Jamhar
jpulavarjamhar@ucdavis.edu
David MacDonald
djmacdonald@ucdavis.edu
Michael Smith
ahrsmith@ucdavis.edu
Team Eggnomics
Appendix
20
Recent Industry Updates
Releases in reports, policies, and legislation
Virginia Energy Plan
PJM Pathway Reforms
PJM Emergency Auction Freeze
SHARE – Google/PG&E
21
E3, Understanding the Drivers Behind Rising Rates
22
Common terms:
Appendix: Non-firm service
23
Figure 4 from Norris et al. showing an illustrative example of load flexibility for a data center.
Norris, T. H., T. Profeta, D. Patino-Echeverri, and A. Cowie-Haskell. 2025. Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems. NI R 25-01. Durham, NC: Nicholas Institute for Energy, Environment & Sustainability, Duke University.
Current RTO/ISO Requirements
Researched capability of large loads
Differentiation of compute types
Appendix: BYOC
24
Generation Capacity
Behind the Meter
Islanding & Battery Storage
Expanded DER Capacity
Regional VPP Investment and participation
Subsiding of residential electrification
Appendix: Demand Response/Load Flexibility
25
Appendix: Demand Response in VA
26
VA load serving entities' residential and industrial DR capacity.
Appendix: Grid Utilization
27
Brattle generation fleet example.
Appendix: Efficient Pricing/Fixed Charges
28
Electric service fixed charges ($/month) (Borenstein and Bushnell, 2022)
Household expenditure by income quintile (Borenstein et al, 2021)
Appendix: Efficient Pricing/Time Varying Prices
29
Appendix: Efficient Pricing/Time Varying Prices
30
LSE RTP enrollment by customer class.
DWL per unit demand due to static price (Borenstein and Bushnell, 2022)
31
The Worst Burden and the Most Dollars Are Not in the Same Place.
32
16% median
electricity burden
$285.7M/yr
the burden gap
Interactive Maps Created for this Analysis Available at this URL: HERE