1 of 32

​

​

Who Pays for Load That Does

Not Arrive in Virginia?

​

Ryan Callahan, Jameel Jamhar, Dave McDonald, Michael Smith

Team Eggnomics

1

2 of 32

Meet Team Eggnomics

2

UC Davis Energy Graduate Group, advising the Commonwealth Energy Regulatory Commission on electricity affordability

David MacDonald

Jameel Jamhar

Ryan Callahan

Michael Smith

3 of 32

Problem Statement for CERC

3

WHAT COMMONWEALTH ENERGY REGULATORY COMMISSION (CERC) REQUESTED

CERC is seeking assistance in evaluating how electricity affordability should be defined, measured, and incorporated into long-term utility planning and regulatory decision-making amid significant projected load growth.

THE PROBLEM

  • Virginia is expected to experience significant demand growth primarily driven by data centers
  • Utilities indicate accommodating this growth require substantial investment in generation, transmission, distribution and grid modernization
  • Regulators, consumer advocates, and customers are concerned about the impact on electricity affordability

HOW WE ANSWER IT

1

Defining and measuring affordability

Who is burdened, by how much, and where?

David MacDonald

2

Demand growth and its uncertainty

How much of the growth will arrive, and who pays if it doesn’t?

Jameel Jamhar

3

Reliability and infrastructure investment

What does reliable service require, and what should it cost?

Ryan Callahan

4

Regulatory decision-making

Which levers balance affordability against CERC’s other goals?

Michael Smith

4 of 32

Defining Affordability

4

5 of 32

Affordability can be defined as the Burden Gap

5

FIFTEEN HIGHEST-BURDEN LOCALITIES, 0–30% AMI HOUSEHOLDS

WHAT IT FINDS FOR VIRGINIA

373,645

households at or below 30% of area median income. 99% pay more than the 6% line allows.

16%

median electricity burden for that group, more than two and a half times the line.

$285.7M

a year to bring every one of them down to the 6% line, about $765 per household.

The 6% line is a convention, so we test it: $385.1M at 4%, $147.7M at 10%. The problem does not disappear under any line.

Monthly Bills & Rates

What electricity costs to customers: 14.41¢ per kWh in Virginia, 23rd-lowest in the country.

✕ MISSES What a household earns.

→

Energy Burden

The monthly electricity bill as a share of monthly income.

✕ MISSES What it would cost to fix.

→

OUR METRIC

The Burden Gap

The dollars a year needed to bring every household’s bill down to 6% of its income.

✓ In dollars, relevant to policy decisions

6 of 32

Affordability Differs by Customer Class

6

CLASS

WHAT AFFORDABILITY MEANS

HOW WE TREAT IT

Residential

Bill as a share of income; ability to stay connected

Burden gap and disconnections

Small commercial

Cost trajectory: rides the same rider stack as residential, without residential’s assistance programs

Track bill growth against a price index

Industrial

Price competitiveness against other states

Compare prices with other states

Large load / data center

Rate predictability and allocation fairness, not price level

GS-5 tariff

WHERE THE BURDEN FALLS

17.0% APCo vs 11.8% Dominion

Low-income burden is highest in Appalachian Power’s territory, where rates are 21% higher and incomes lowest. Yet 70% of the gap dollars sit in Dominion territory, where most households are.

WHAT THE IDENTIFIED GAP DOES NOT CAPTURE

461,586 disconnection events, 2024

Sixth-highest in the country. Once service is disconnected, the household drops out of the burden measure; but the costs do not. Collections, administration, and disconnection/reconnection can create additional system costs. CERC should track disconnections beside the gap.

7 of 32

Uncertainty Within Demand Growth

7

8 of 32

Demand Growth and Its Uncertainty

8

91%

of projected growth to 2046 is requested large load, mostly data centers, not metered demand

28.2 of 31.0 GW added, 2026–2046

DOMINION ALONE:

47 GW CONTRACTED, 16.6 GW FORECAST

47 GW contracted with Dominion, Jul 2025

16.6 GW filed with PJM for 2046

−65% Dominion’s own estimate

PJM’s own check trims only 2–9% more.

Nobody can yet say

how much will arrive.

Sources: PJM 2026 Load Forecast (Tables B-1, B-9); PJM LAS large-load requests (Sep 2025); Dominion Manual 19 letter.

9 of 32

Make Data Centers Carry the Risk They Create

9

  • This uncertainty is very difficult to resolve, and no forecast available to the Commonwealth will settle it. What it can control is who pays for the $1.32 billion a year of capacity and transmission committed by 2040 against load that does not arrive.
  • Enforcing the GS-5 minimum-demand protections cuts the residential uncertainty premium from $18.42 to $4.46 a month.
  • Getting cost allocation right is worth roughly fifteen times more than perfect forecasting, which is the ceiling on what any forecasting reform could deliver.

$399M a year

what the GS-5 order keeps off household bills

$13.96 a month × 2.4 million Dominion households

RECOMMENDATION 1 Hold and extend GS-5

Model: 50,000 Monte Carlo draws for 2040, Dominion residential customers. JLARC Report 598 (2024); Va. SCC GS-5 order, PUR-2025-00058.

10 of 32

Folding Uncertainty into Planning Decisions

10

These five triggers each name a warning sign CERC can watch for, the action to take, and what it is worth to households.

GATE

TRIGGER

WHO ACTS

WORTH, $/MONTH AT 2040

Hold the minimum-take order against ex-post relief

Any waiver, true-up or retroactive relief against GS-5 terms

CERC

$13.96

loss avoided

Milestone-tiered forecast inclusion

Above-embedded MW entering the forecast at face value rather than at their milestone probability

PJM, CERC advocates

$4.17

Capacity-market exclusion for new large load

Incremental large load from DY 2029/30 that brings no supply

PJM Board, FERC

$2.71

Level the minimum demand charge across cost components

Generation recovering at 60 percent while transmission recovers at 85

CERC

$1.70

Stage the transmission commitment

An RTEP need case resting on above-embedded load more than five years out

PJM, CERC advocates

$0.19

CERC sets it directly

CERC advocates at PJM or FERC

The gates overlap, so the rows do not add. The top row is a loss avoided, since the order is already in force.

WHAT CERC CAN DO NOW

Keep the GS-5 order in force.

The SCC already requires large customers, mostly data centers, to pay a minimum share of the grid costs they trigger. Refusing any waiver or retroactive relief protects households from the largest of the five costs.

$13.96 a month at 2040 · Va. SCC

WHAT CERC SHOULD PUSH FOR AT PJM

Count requested load at its milestone probability.

The strongest thing Virginia can advocate for at PJM is carrying the speculative slice into the forecast at its milestone probability rather than at face value, which is what the California Energy Commission already does.

$4.17 a month at 2040 · PJM, Virginia advocates

Each gate priced by re-running the Monte Carlo with that rule in force, 2040. Precedents: FERC ER26-444 (AEP); CEC 2025 IEPR milestone tiers.

11 of 32

Reliability and Infrastructure Investment

11

12 of 32

Economic Reliability with Novel Investment

12

1

DEFINE RELIABILITY BY VALUE

Build until the next unit of capacity costs more than the outages it prevents (VOLL), not to a fixed 1-in-10 target. PJM’s reserve margin falls to 18.9% by 2029, below its 23.9% reference.

2

BASELINE COSTS KEEP RISING

Every newer estimate of Virginia’s buildout has come in higher than the last, so favor investment that can scale with demand over capital committed years ahead.

3

COST ALLOCATION

Evidence is split on whether data centers raise rates for other customers, and rate adjustment clauses weaken utilities’ incentive to control costs.

BEST COURSE OF ACTION FOR CERC

Require utilities to evaluate demand-side and NWA options before rate-basing a traditional build. Extend the investment requirement to large-load interconnection, consistent with current FERC large-load reforms.

NON-WIRES TRACK RECORD

Of ten leading U.S. projects, most deferred or eliminated the grid upgrade they targeted. E4TheFuture, PLMA, SEPA

Evaluation of Technology Investments

  • Current baseline technology and infrastructure improvements could add anywhere from 22-50 billion additional dollars in spend
  • Energy efficiency and load flexibility investments are roughly 2-3 times cheaper for the same net energy utilization

COST PER MWH (ACEEE 2026)

Energy efficiency, median

$21

Cheapest new gas plants

$45–108

Who Pays: Risks of Customer Exclusion

Recommendation of use of VOLL does not exclude the necessity for energy-burden evaluations and low-income stakeholder engagement.

VOLL prices outage risk, but it “cannot tell you whether the customers paying for that optimum are the ones benefiting from it.”

13 of 32

Regulatory Decision-Making

13

14 of 32

14

15 of 32

Large Load Tariffs, Flexible Interconnection, and BYOC can protect residential customer affordability

15

AFFORDABILITY

  • Short-term: the new tariff stems the “short-term under-collection” problem, and flexible interconnection allows revenue collection with minimal investment (E3 2026; Camus 2025)
  • Long-term: assigns the uncertainty premium to the appropriate party and eases capacity market scarcity

EQUITY

  • Easier cost allocation across classes from specific large-load tariffs

ECONOMIC DEVELOPMENT

  • Flexible interconnection and BYOC appear positive (Camus 2025; Rewiring America 2026)
  • Large-load tariff impact depends on terms, location and more (JLARC 2024; LBNL 2025; E3 2026)

16 of 32

Efficient pricing promotes efficient investment

16

PRICING

  • Better alignment between the marginal cost of consumption and production
  • Time-varying prices are good; critical-peak or real-time prices are better (CEEPR)
  • Fixed versus volumetric bill charges (Borenstein et al. 2021)

GRID UTILIZATION

  • Raise utilization through rate and program levers rather than directly through performance incentive mechanisms
  • Use utilization monitoring as a diagnostic

Illustrative: a day of wholesale prices against flat and time-of-use retail rates

Load factor against residential share of sales, large utilities, 2024 (EIA-861)

AFFORDABILITY

EQUITY

17 of 32

Bill Assistance and PJM Market Reforms

17

BILL ASSISTANCE

  • Target the tail end of customers to address distributional outcomes; not a rate-base-wide effort at affordability
  • If it threatens funding for households above 10%, reevaluate the new 5% cap (Va. Code § 56-585.6)

PJM CAPACITY MARKET

  • Relying on the capacity price cap for long-term affordability could threaten reliability and long-term affordability (Joskow 2008; NERC 2026)
  • Support "Differential Reliability" pathway as the prioritization of non-large load customer welfare
  • Investigate "Energy Market Transition" Pathway for the future

Illustrative: household energy burden across localities, with the 5% and 10% payment caps marked. 1% standard deviation to match ACEEE's reporting the 25% of households have an energy burden higher than 6%. Made with county-level data from Virginia Conservation Network and PSE Health Energy.

18 of 32

Recommendation to CERC

18

1.

Build on GS-5 to properly allocate cost of uncertainty to prospective loads

Investigate introducing minimum monthly demand charges or load factors to existing large load

Consider introducing some mandatory flexibility terms for new loads

CERC ACTS DIRECTLY VIA ITS OWN TARIFF

2.

Pursue/support opportunities for flexible interconnection and BYOC with reliable local DER flexibility and energy efficiency

CERC ACTS ALONGSIDE PJM AND FERC FOR INTERCONNECTION REFORMS

3.

Embrace pricing strategies for all customer classes that better approximate marginal cost of production while shielding from cost-shift (RTP, fixed charges)

CERC ACTS DIRECTLY WITH RETAIL RATE DESIGN

4.

Actively participate in the PJM stakeholder process to advocate for an economically-sound solution beyond a capacity market cap

CERC ADVOCATES WHILE PJM AND FERC DECIDE

19 of 32

​

Thank You

We welcome your questions.

19

Ryan Callahan

recallahan@ucdavis.edu

Jameel Jamhar

jpulavarjamhar@ucdavis.edu

David MacDonald

djmacdonald@ucdavis.edu

Michael Smith

ahrsmith@ucdavis.edu

Team Eggnomics

20 of 32

Appendix

20

21 of 32

Recent Industry Updates

Releases in reports, policies, and legislation

Virginia Energy Plan

PJM Pathway Reforms

PJM Emergency Auction Freeze

SHARE – Google/PG&E

21

22 of 32

E3, Understanding the Drivers Behind Rising Rates

22

Common terms:

  • minimum load factor,
  • minimum demand or energy charge,
  • minimum contract duration,
  • exit fee,
  • minimum credit rating or collateral,
  • economic-development payments to the host community,
  • required participation in demand response

23 of 32

Appendix: Non-firm service

23

Figure 4 from Norris et al. showing an illustrative example of load flexibility for a data center.

​

Norris, T. H., T. Profeta, D. Patino-Echeverri, and A. Cowie-Haskell. 2025. Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems. NI R 25-01. Durham, NC: Nicholas Institute for Energy, Environment & Sustainability, Duke University.

​

Current RTO/ISO Requirements

    • FERC OSC directs all major RTO/ISOs to justify or reform their tariffs for integrating data centers.
    • ERCOT & CASIO require non-firm status as a condition of interconnection.

Researched capability of large loads

    • Norris et al. shows that 126 GW of new large loads can be integrated into existing infrastructure with 1.0% curtailment.

Differentiation of compute types

    • Large model training needs sustained power over long periods but can be scheduled around grid conditions, unlike inference tasks that require immediate responses.
    • Google signed DR agreements with Indiana Michigan Power and TVA, under which certain data centers reduce ML-workload power during grid stress.

24 of 32

Appendix: BYOC

24

Generation Capacity

Behind the Meter

    • Serve as temporary or permanent primary supply before grid interconnnections

Islanding & Battery Storage

    • Front-of-meter batteries are sited to relieve distribution congestion and defer upgrades

Expanded DER Capacity

Regional VPP Investment and participation

    • Requires relieving same transmission constraint
    • Example with SHARE

Subsiding of residential electrification

    • Higher up front cost but frees up peak capacity

25 of 32

Appendix: Demand Response/Load Flexibility

  • Load modifying (retail incentives)
  • Market integrated
    • PJM pathways: Load management (Pre-Emergency and Emergency DR), Economic DR (beyond retail response)
    • ~8 GW of contracted demand in capacity market (PJM, 2026) compared to ~180 GW of generation
  • Emergency/incremental
    • Virginia DOE program for public entities (Voltus-administered)
    • 450 facilities (VDOE, 2026)
    • Improves reliability, not affordability

25

26 of 32

Appendix: Demand Response in VA

  • NLR Estimates (2030)
    • 2.3 GW for winter heating and 1.8 GW for summer cooling (roughly equal to data center curtailment estimate)
    • Water heaters offer roughly 296 MW, mostly residential
    • EVs 191 MW

​

​

​

​

​

26

VA load serving entities' residential and industrial DR capacity.

​

27 of 32

Appendix: Grid Utilization

  • 10% boost in utilization could cut rates 3.4% (Brattle 2026)
  • VA SB 621
  • Problems with PIM
    • Distributed energy storage needs to have net costs less than building
    • Proactive planning will reduce utilization in the short-term
    • Needs guardrails to preserve resiliency, reliability and operational flexibility
    • Difficult to measure
  • Measurement protocol (Utilize Coalition, 2026)

​

27

Brattle generation fleet example.

​

28 of 32

Appendix: Efficient Pricing/Fixed Charges

  • Fixed charges in line with fixed cost of service
  • Volumetric cost recovery can be regressive
  • Prevent cost-shift from DER households
  • Encourage off-peak electrification/use

28

Electric service fixed charges ($/month) (Borenstein and Bushnell, 2022)

​

Household expenditure by income quintile (Borenstein et al, 2021)

​

29 of 32

Appendix: Efficient Pricing/Time Varying Prices

  • TOU vs CPP vs RTP
    • Use 20 CPP days, 10% of efficiency from RTP (Hincherger et al, 2024)
    • Update pricing windows and amounts regularly
    • Benefit from spatial granularity

29

  • Local Value of DERs (E3, 2026)
    • ​Distribution level should be compensated in narrowly defined instances
    • No capacity from pricing

​

30 of 32

Appendix: Efficient Pricing/Time Varying Prices

30

LSE RTP enrollment by customer class.

​

DWL per unit demand due to static price (Borenstein and Bushnell, 2022)

​

31 of 32

31

32 of 32

The Worst Burden and the Most Dollars Are Not in the Same Place.

32

16% median

electricity burden

$285.7M/yr

the burden gap

Interactive Maps Created for this Analysis Available at this URL: HERE