Yarralumla Creek Renaturalisation:
Nature-based solutions to reduce flood risk, increase biodiversity, and improve community amenity
6 May 2026
Acknowledgement of Country
What I’m Going To Talk About
Why this matters now
Yarralumla Creek is not just a drain; it is part of Woden’s flood system, transport spine and public realm.
Recent flood damage suggests the current system is vulnerable and costly to keep patching.
Redevelopment and light rail planning mean decisions made now could lock in the future of the corridor for decades.
What renaturalisation means
Renaturalisation does not mean turning the creek into untouched wilderness.
It means redesigning parts of an engineered drain so they work better ecologically and hydraulically: slower flows, planted banks, flood benches, wetlands, and better stormwater treatment.
Proven benefits include improved biodiversity and water quality, urban cooling, and reduced peak flows.
In urban areas, it is usually staged and combined with broader Water Sensitive Urban Design (WSUD) across the catchment.
It is not a flood risk. If done well, it reduces peak flows, attenuates runoff, and increases system resilience.
Why Yarralumla Creek?
Yarralumla Creek drains a highly urbanised catchment, discharging into the Molonglo River, Lake Burley Griffin, and ultimately the Murrumbidgee River (part of the Murray-Darling Basin).
The existing concrete stormwater network delivers high sediment and nutrient loads downstream: priority works in the catchment could remove ~2.4 million kg/year of suspended solids, 333 kg/year of phosphorus, and 2,018 kg/year of nitrogen (ACT Healthy Waterways).
The creek has been a concrete drain between Mawson and North Curtin since the 1970s, with limited habitat and low amenity value.
Current flood risk is significant - consider the 1971 Woden flood disaster and subsequent recent damaging events.
Community concern is focused not just on environment or aethetics, but on safety, nearby housing, the transport corridor and pinch points around Melrose Drive and Ivy Towers.
Water from the Yarralumla Creek flows quickly past the Ivy apartment building in Phillip during the February 2026 storm.
Yarralumla Creek Catchment
Limits of the current system
Long, straight concrete channels move water quickly, but they also reduce habitat, disconnect the creek from surrounding landscape and can fail dramatically under intense storm events.
Repeated repair of damaged concrete may amount to maintaining an ageing single‑purpose asset rather than solving the wider problem.
The key question is not "concrete or nature", but whether the present system is still the best option for flood safety and for the biodiversity and ecological values that are fundamentally incompatible with a concrete drain.
WSUD requirements are already embedded in the Territory Plan (the ACT's key statutory planning instrument) yet the level of application in practice varies widely, meaning existing obligations are not consistently translating into catchment-scale outcomes.
ACT precedent: Tuggeranong Creek
The ACT has already replaced concrete sections of Tuggeranong Creek with naturalised creek beds, pools, riffles and native planting.
The Healthy Waterways program demonstrates the ACT already has a tested model for catchment-scale waterway investment, combining science, staged infrastructure delivery, and measurable water quality outcomes
The lesson is not that Yarralumla is identical to Tuggeranong, but that the ACT already has a local model for doing this carefully.
Lessons from outside the ACT
Small Creek, Ipswich: 1.6 km of urban concrete channel naturalised through staged delivery, co‑design and flood modelling.
Cooks River, Sydney: failing concrete treated as an asset‑renewal opportunity, not replaced like‑for‑like.
Both cases show the same principle: naturalisation works best when framed as flood‑aware, staged and place‑based.
Small Creek, Ipswich
Cooks River, Sydney
Potential Benefits & Constraints
Potential Benefits
Key constraints
What Woden Valley Community Council can ask for now
Yarralumla Creek renaturalisation directly advances the ACT Water Strategy 2025-45, which calls for water-sensitive urban landscapes, healthy water bodies resilient to climate change, and integrated land and water management. WVCC should call on ACT Government to fulfil these commitments.
Protect corridor space now so future options are not lost to redevelopment.
Support a staged Yarralumla Creek feasibility program: hydraulic modelling, utilities mapping and concept design.
Prioritise early wins: softening selected edges, upstream WSUD, wetlands, planting and stormwater interventions where feasible.
Treat renaturalisation as flood resilience, asset renewal and place‑making, not only an environmental project.