230 Everett St. - Monthly Meeting

  • Introduction
  • Zoning Review
  • Project Timeline & Community Process
  • Site Plan + Building Layout
  • Design Concept / Renderings
  • Discussion

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

3 of 22

Erect a 4-story, five (x5) unit bldg. including six (x6) off-street parking spaces and increased setback at front yard for planting area behind sidewalk. Roofdecks have been removed.

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

4 of 22

Zoning Information

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

5 of 22

Site + Landscaping

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

Second Floor

Planting

Area

6 of 22

Third Floor

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

Fourth Floor

7 of 22

8 of 22

9 of 22

Project Timeline & Community Process

January 19, 2022

JPNA P+Z

February 16, 2022

JPNA P+Z

March 24, 2022

ONS Abutters Mtg

April 14, 2022

ONS Abutters Mtg

April 20, 2022

JPNA P+Z

May 9, 2022

JPNA Monthly Mtg.

  • Community Process Summary:
    • Reduction in Units from 7 🡺 5 (30% reduction)
    • Deleted Two Roof decks
    • Added Rear Planting Area & Flipped Driveway Back to Utilize Existing Curb Cut
    • Setback building 7’ to create front yard w/plantings
    • Increased parking ratio (7 spaces; 7 units 🡺 6 Spaces for 5 Units)
    • Changed to a more traditional double hung window

10 of 22

Design Progression / Community Feedback

  • Community Commitments
    • Condominiums for Home Ownership
    • Fencing / Screening Rear Yards
    • Coastal Resiliency Design
    • Foundation Approach & Groundwater
    • Communication During Construction
    • Rodent Control
    • Parking Spaces Deeded Per Unit (No renting spaces separate from Unit)
    • Professional Mgmt. For Snow Removal, Landscaping & Trash/Recycling

11 of 22

Thank you!

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

12 of 22

Extra Slides From Previous Presentations

13 of 22

Locus Map

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

14 of 22

15 of 22

RESILIENT DESIGN PRINCIPLES & STRATEGIES

  • Wet Floodproofing - Designing for the movement of water through a space, which equalizes hydrostatic pressure and helps prevent structural failure.

  • Locate Critical Systems (water heater, electrical panels, and other critical systems) above DFE

  • Materiality - Use flood-damage-resistant materials below DFE

16 of 22

Groundwater Mediation Approach

  • Recharge – Captures runoff roofs, driveway,s etc. & diverts it back to groundwater table.

  • Recharge Structures (Dry Wells) will be installed to collect all water from impervious surfaces

  • Infiltrate the first inch of stormwater times the impervious areas on site.

  • Pre & Post Construction Drainage Calculations (leave it better than you found it )

17 of 22

RESILIENT DESIGN PRINCIPLES & STRATEGIES

  • Wet Floodproofing - Designing for the movement of water through a space, which equalizes hydrostatic pressure and helps prevent structural failure.

  • Locate Critical Systems (water heater, electrical panels, and other critical systems) above DFE

  • Materiality - Use flood-damage-resistant materials below DFE

18 of 22

Groundwater Mgmt.

  • Stormwater Retention/Calculations: Must infiltrate the first inch of stormwater times the impervious areas on site.
  • Provide Pre & Post Construction Drainage Calculations (Increase in net impervious cover).
  • Reduce surface water runoff and water pollution

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

19 of 22

Foundation Approach

  • Helical Piles

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

20 of 22

Foundation Approach

  • Ductile Iron Pipes

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

21 of 22

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217

22 of 22

  • Marc Savatsky (617)388-9336; Karina Mejia 617-888-1217