1 of 10

An Improved of Maximum Power Point Tracking Algorithm for Solar Power Plant Under Partial Shading Conditions

Refdinal Nazir, Electrical Engineering Department, Universitas Andalas

Krismadinata, Electrical Engineering Department, Universitas Negeri Padang

Muhammad Nasir Sonni, Electrical Engineering Department, Universitas Andalas

Asnil, Electrical Engineering Department, Universitas Andalas

​

​

​

​

2 of 10

INTRODUCTION

  • The need for electrical energy is increasing along with population growth
  • Rising fossil fuel prices
  • Increasing CO2 Emissions
  • Global warming
  • Crisis of fossil energy sources
  • Indonesia's solar energy potential is 207.8 GWp
  • How to extract maximum energy from solar panels to be used as electric energy

​

3 of 10

METHODS

4 of 10

5 of 10

RESULTS

6 of 10

No

Perturbation

(∆D)

The time required by the InC algorithm to track MPP.

The time required by the modified InC Algorithm to track MPP.

Radiation changes from 500 W/m2 to 300 W/m2

Radiation changes from 300 W/m2 to 500W/m2

Radiation changes from 500 W/m2 to 300 W/m2

Radiation changes from 300 W/m2 to 500 W/m2

1

1 %

106 ms

124 ms

90 ms

76 ms

2

2 %

104 ms

130 ms

86 ms

88 ms

3

3 %

102 ms

132 ms

82 ms

90 ms

4

4 %

98 ms

138 ms

74 ms

96 ms

5

5 %

84 ms

146 ms

72 ms

98 ms

7 of 10

The oscillations in unmodified incremental conductance algorithm testing with changes in radiation values from 500 W/m2 to 300 W/m2 are 2 W, the same for each change in ΔD values. In contrast, the change in radiation value from 300 W/m2 to 500 W/m2 is 1.66 W and is the same for every change in the value of ΔD. In tests using a modified incremental conductance algorithm for radiation changes from 500 W/m2 to 300 W/m2 or vice versa is 1.33 W, and the value is the same for each change in ΔD value. Consequently, it can be explained that the adjustment made to the incremental conductance algorithm effectively decreases the time required for MPP tracking and minimizes the oscillation associated with alterations in radiation levels.

8 of 10

DISCUSSION

The control algorithm for tracking the maximum power point (MPPT) is a crucial factor influencing the system's capacity to harness the maximum energy from the sun using solar panels. Incremental Conductance is one of the most commonly employed MPPT techniques due to its simplicity and low implementation complexity. However, it has various shortcomings, rendering it less effective in adapting to changing solar radiation conditions. Therefore, this study proposed a modification to enhance the algorithm's performance. The proposed modified algorithm is validated through experiments, revealing that the fastest tracking time for the adjusted incremental conductance algorithm was 72 ms, whereas the unmodified algorithm took 84 ms. Additionally, oscillations observed during changes in radiation values were 2 W and 1.66 W for the unmodified algorithm, occurring during decreases and increases in radiation values, respectively. In contrast, the proposed modified incremental conductance algorithm resulted in a consistent oscillation of 1.33 W for each change in radiation value.

9 of 10

Research Outcome

TEM JOURNAL Scopus, Q3

10 of 10

T E R I M A K A S I H