Savanna Fire Management Methods Update

Northern Australia Savanna Fire Forum 2024

Presenter: Ab Yamani

Date: 21 Feb 2024

2 of 9

We acknowledge the Traditional Owners of Country throughout Australia and recognise their continuing connection to land, waters and culture. We pay our respects to their Elders past and present.

3 of 9

Agenda

      • Differences between 2018 SFM & the proposed new 2024 SFM methods
      • Timeline of the Method Development Process
      • SavCAM development progress
      • SavCAM Front-End Video
      • Next steps

4 of 9

2018 Methods vs 2024 Methods

Issue

2018 SFM methods

2024 SFM methods (DRAFT under development)

Abatement calculation tool

Savanna Burning Abatement Tool (SavBAT version 3)

Use new SavCAM tool which integrates FullCAM, ensuring better alignment with Australia’s National Greenhouse Gas Inventory

Carbon pools used in the sequestration method

Only dead wood on the ground

Carbon pools expanded to include standing dead wood and living biomass

Treatment of weed species

By the end of the current reporting period, Relevant weed species must be removed from the project area or the area affected must be removed from the project area

More flexible approach, allowing 18 months to treat the weed affected area subject to annual follow-up treatment until the weed is eradicated

Baseline period

10-15 years depending on the project

NAFI fire scar data supports use of a 20 year baseline, allowing more accurate modelling of fire history and abatement calculations. Transferring projects could opt in to the new 20 year baseline

Capacity building fire management

Not accommodated

New projects allowed max of 6 years to undertake capacity building fire management without affecting project baseline period

Vegetation types

-

Retain existing vegetation types. A new eligible vegetation type, pindan, (Acacia sp. Shrublands, low rainfall zone) included

4

5 of 9

2024 Method Development Timeline

Key milestone/deliverable

Indicative timing

Development of method exposure draft

January 2024 – April 2024

Release SavCAM beta tool & method exposure draft for public consultation (subject to ERAC approval to release)

May 2024

SavCAM tool finalised

June 2024

Draft method determination finalised by Department

June 2024

ERAC assessment of draft method against Offsets Integrity Standards

June 2024

Ministerial consideration to make the method (subject to ERAC approval)

July – August 2024

6 of 9

SavCAM Development

6

Front End User interface development

Back-end development

Beta version available May

Final development

Final public release June

Jan 2024

Feb

Mar

April

May

June

Integration and testing

7 of 9

SavCAM front end walk-through

7

Insert video from Spatial Vision

8 of 9

Next Steps

The department aims to resume the co-design process for the outstanding issues.

If you have specific questions, please come and chat to us after this workshop.

To join our mailing list please email us.

Any additional feedback or suggestions are always welcome.

ACCUmethods@dcceew.gov.au

8

9 of 9

Contact us

Ab Yamani�Ab.Yamani@dcceew.gov.au

ACCU Methods �ACCUmethods@dcceew.gov.au

dcceew�gov.au