1 of 28

FORMS,

FOUNDATIONS, AND

CONCRETE�

2 of 28

OBJECTIVES

  • LAY OUT BUILDING LINES AND SET UP BATTER BOARDS.
  • DESCRIBE EXCAVATION PROCEDURES.
  • DISCUSS THE TYPES OF FOUNDATION SYSTEMS
  • EXPLAIN FOOTING REQUIREMENTS AND HOW TO BUILD FOOTING FORMS.
  • DESCRIBE THE BUILDING, ERECTING, AND USE OF FORMS FOR POURED FOUNDATION WALLS.

3 of 28

OBJECTIVES

  • EXPLAIN HOW SLAB-ON-GRADE CONSTRUCTION IS USED.
  • DISCUSS DESIGN FACTORS THAT APPLY TO SIDEWALKS AND DRIVEWAYS.
  • EXPLAIN HOW COLD WEATHER AFFECTS CONSTRUCTION.
  • ESTIMATE CONCRETE MATERIALS REQUIRED FOR A SPECIFIC AREA.

4 of 28

LAYING OUT BUILDING LINES

  • USE REGISTERED ENGINEER OR LICENSED SURVEYOR TO ESTABLISH BOUNDARIES
  • LOCATE BUILDING LINES WITH BUILDER’S LEVEL, TRANSIT, OR THEODOLITE
  • CHECK BUILDING LINES CAREFULLY

Dmitry Kalinovsky/Shutterstock.com

5 of 28

EXCAVATION

  • OUTLINE IS MARKED WITH STAKES OR LIME
  • SHOULD EXTEND AT LEAST 2BEYOND BUILDING LINES
  • FIND EXCAVATION DEPTH AND FOUNDATION HEIGHT USING CONTROL POINT

Goodheart-Willcox Publisher

6 of 28

SAFETY NOTE: EXCAVATION

  • WHENEVER PROJECTS INVOLVE EXCAVATIONS
    • DETERMINE LOCATIONS OF UNDERGROUND UTILITY LINES (CALL 811)
    • PROVIDE ADEQUATE SHORING IF NEEDED
    • PILE EXCAVATED MATERIAL AT SAFE DISTANCE AWAY FROM EXCAVATION
    • PUMP WATER OUT OF EXCAVATION
    • PROVIDE ADEQUATE LADDERS FOR SAFE EXIT FROM EXCAVATION

7 of 28

SAFETY NOTE: WIRE MESH

  • WHEN USING WIRE MESH FOR SLAB REINFORCEMENT, TAKE PRECAUTIONS TO PREVENT ENDS OF UNROLLED MESH FROM SPRINGING UP
  • SECURE BOTH ENDS OF MESH OR REVERSE MATERIAL SO IT CURVES DOWNWARD WHEN UNROLLED

8 of 28

REINFORCING FOR CONCRETE

Steel Reinforcing Bars (Re-Rod

20' Lengths Sizes

 

Number 2 3 4 5 6 7 8 9* 10* 11*

Inches 1/4 3/8 2 /4 5/8 3/4 7/8 1 1 1 1/8 1 1/4

 

 

*  

9 of 28

REINFORCE FOR CONCRETE

Wire Fabric Mesh

5' X 150' Rolls 6" X 6" 10, 8, 6 & 4 Gage

  4" X 4" 13, 10 & 4 Gage

 

10 of 28

FORMS FOR FOOTINGS

  • CONTAIN CONCRETE UNTIL IT IS CURED
  • CONSTRUCTED OF 2 LUMBER
  • SUPPORT STAKES PLACED AT 4 INTERVALS
  • TIES NAILED ACROSS TOP OF FORM BOARDS AT INTERVALS
  • ADDITIONAL PLASTIC FOOTING METHOD
  • STEPPED FOOTINGS REQUIRE ADDITIONAL FORMWORK

11 of 28

PROCEDURE: CONSTRUCTING FOOTING FORMS

  • DRIVE STAKES AND ESTABLISH POINTS AT FOUNDATION WALL CORNERS
  • SET UP LASER OR BUILDER’S LEVEL AT CENTRAL POINT
  • DRIVE GRADE STAKES LEVEL WITH TOP OF FOOTING
  • CONNECT CORNER STAKES WITH LINES TIED TO NAIL ON TOP OF STAKES
  • CONSTRUCT OUTSIDE FORM FOR FOOTING
  • LEVEL INSIDE OF FORM WITH STEEL TAPE AND LEVEL
  • BRACE FORMS AS NEEDED
  • USE LEVEL TO RECHECK HEIGHT AT SEVERAL POINTS

12 of 28

COLUMN FOOTINGS

  • PADS OF CONCRETE DESIGNED TO SUPPORT COLUMNS
  • DISTRIBUTES LOAD TO THE GROUND
  • SET AFTER FOOTING FORMS
  • SOME HAND DIGGING AND LEVELING IS REQUIRED
  • PLACE REBAR IF REQUIRED, SUPPORT OFF THE GROUND

13 of 28

ERECTING WALL FORMS

  • MUST BE
    • TIGHT, SMOOTH, DEFECT FREE, AND PROPERLY ALIGNED
    • STRONG AND WELL-BRACED TO RESIST SIDE PRESSURE CREATED BY CONCRETE

14 of 28

FORM HARDWARE

  • WIRE TIES AND WOODEN SPREADERS REPLACED WITH MANUFACTURED DEVICES
  • FORM OR SNAP TIE HOLDS SIDES OF FORM TOGETHER AT RIGHT DISTANCE
  • WALERS SECURE CORNERS
  • STRONGBACKS ARE NAILED TO WALERS

15 of 28

PANEL FORMS

  • PREFABRICATED PANELS USED FOR MOST POURED CONCRETE WALL FORMS
  • MADE FROM PLYWOOD, STEEL, OR ALUMINUM
  • DESIGNED TO BE USED MANY TIMES
  • WALERS USED FOR STIFFENING AND BRACES TO KEEP PLUMB
  • RELEASE COATING PREVENTS CONCRETE FROM STICKING TO SURFACE

16 of 28

PILASTERS AND COLUMN FORMS

  • PILASTERS
    • THICKENED SECTIONS OF CONCRETE OR MASONRY WALLS
    • STRENGTHEN WALLS OR SUPPORT BEAMS
  • PREFABRICATED FORMS SAVE TIME FOR STANDARD SQUARE OR RECTANGULAR COLUMNS

17 of 28

CONCRETE

  • MADE BY MIXING MEASURED AMOUNTS OF
    • CEMENT
    • FINE AGGREGATE (SAND)
    • COARSE AGGREGATE (GRAVEL OR CRUSHED STONE)
    • WATER
  • HYDRATION CAUSES HARDENING OF MIXTURE

18 of 28

CURING METHODS

  • FLOODING
  • KEEP SPRINKLER RUNNING
  • OTHER METHODS
    • COVERING WITH BURLAP OR OTHER MATERIAL
    • COVERING WITH PLASTIC AND SEALING LAPS
    • USING LIQUID-MEMBRANE COMPOUND TO SEAL IN MOISTURE

19 of 28

SLUMP TESTING

  • ASSESSES CONSISTENCY, STIFFNESS, AND WORKABILITY OF FRESH CONCRETE
  • MORE WATER MEANS MORE SLUMP
  • CAN BE DONE AT JOBSITE OR AT READY-MIX PLANT

20 of 28

PROCEDURE: MAKING A SLUMP TEST

  • SECURE SLUMP CONE, WET IT, AND PLACE UPRIGHT
  • FILL CONE WITH CONCRETE, STRIKE OFF THE TOP, THEN REMOVE CONE
  • TURN CONE, PLACE NEXT TO CONCRETE, AND LAY TAMPING ROD ACROSS THE TOP
  • USE RULER TO MEASURE SLUMP

21 of 28

PLACING CONCRETE

  • USUALLY CAN BE PLACED INTO FORMS FROM TRUCK
  • WHEELBARROW OR PUMP IS USED FOR OTHER AREAS
  • BAFFLES USED ON SLOPES PREVENT COLLECTING OF AGGREGATE AT BOTTOM

22 of 28

SAFETY NOTE: CONCRETE

  • CHEMICAL REACTION IN CURING CONCRETE GENERATES HEAT
  • CAN CAUSE CHEMICAL BURNS ON BARE SKIN
  • WEAR SAFETY GLASSES, RUBBER BOOTS, AND GLOVES WHEN WORKING WITH CONCRETE

23 of 28

SIDEWALKS, STEPS, AND DRIVES

  • MAIN WALKS LEADING TO FRONT ENTRANCES SHOULD BE AT LEAST 4 WIDE
  • WHEN JOINING TWO LEVELS WITH STEPS, POUR TOP LEVEL FIRST
  • DRIVEWAYS SHOULD BE 5 OR 6 THICK WITH REINFORCING MESH

24 of 28

FINISHING WALKS AND DRIVES

  • SPREAD CONCRETE ROUGHLY BETWEEN FORMS
  • AFTER SPREADING, IMMEDIATELY SCREED CONCRETE
  • AFTER SCREEDING, MOVE FLOAT OVER SURFACE
  • START SURFACE FINISHING AFTER CONCRETE IS STIFF

25 of 28

FORMING CONTROL JOINTS

  • CONTROL JOINTS CAN BE FORMED WITH
    • GROOVER AND STRAIGHTEDGE
    • POWER SAW WITH MASONRY BLADE
  • START SAWING 18–24 HOURS AFTER CONCRETE IS PLACED
  • JOINTS SHOULD EXTEND TO DEPTH OF AT LEAST ONE-FIFTH THICKNESS OF CONCRETE
  • PROTECT CONCRETE AGAINST LOSING MOISTURE TOO QUICKLY DURING HARDENING

26 of 28

CONCRETE TOOLS

  • HAND TROWELS
  • BULL FLOATS
  • MAGNESIUM FLOATS
  • WOOD FLOATS
  • SPONGE FLOATS
  • EDGER
  • SCREEDS
  • WALKING TROWELS
  • FRESNO TROWELS
  • HANDLES
  • FINISHING BROOMS
  • RAKES

27 of 28

COLD WEATHER CONSTRUCTION

  • MAY REQUIRE CHANGES IN HANDLING MATERIALS
    • HEAT MATERIALS
    • COVER FRESHLY PLACED CONCRETE OR MASONRY
    • ERECT ENCLOSURE AND KEEP AREA HEATED
  • AVOID PLACING CONCRETE ON FROZEN GROUND
  • MATERIALS USED IN MORTAR SHOULD BE AT PROPER TEMPERATURES
  • TEMPORARY SHELTERS OR COVERINGS CAN BE USED

28 of 28

ESTIMATING MATERIALS

  • CONCRETE IS MEASURED BY CUBIC YARD
  • ALLOW EXTRA CONCRETE FOR WASTE OR SLIGHT VARIATION IN FORM
  • USE FORMULAS TO CALCULATE VOLUME