SEMM 1513�Introduction to Design

Design Embodiment

2 of 9

Initial Design Embodiment

You need to sketch the detail parts of the device.

The sketch should include the initial dimensions.

Along the detail part sketch, Bill of Material should (BOM) be produced.

3 of 9

Matters that are helpful in Initial Design Configuration

4 of 9

Matters that are helpful in Initial Design Configuration

5 of 9

Finalization of the dimensions

The dimensions proposed in the initial design embodiment stage need to be verified. The verifications of the dimensions will ensure

  1. The dimensions are ergonomic based on the anthropometric data
  2. The integrity of the device when the load applies (required engineering analysis: SEMM 4533)

After the dimension is finalized, CAD model can be built. However, due to the parametric modelling of the CAD model, the CAD model can be built after the initial design embodiment.

The purpose of the CAD model

  • To verify the dimensions of the parts when they are assembled
  • To verify the movement of parts without any collision
  • To generate engineering drawing as the final documentation of the design.

6 of 9

Engineering Judgement

Reduce the possible of creating bending force (moment) on the parts

  • Avoid abrupt change in dimensions
  • Short force flow.
  • Symmetrical load
  • Balanced distributed load
  • Minimal Curve object

7 of 9

Activities in dimensions verification

Manually calculated the dimensions

Projection of CAD assembly model

Application of CAD features

Constraints of the sketch profile

Sketch Block and Power Transmission Element

Virtual Prototyping

8 of 9

Project: task

Task:

  1. As a group, you have to SKETCH the initial design embodiment including BOM
  2. Assign each person to model the part in Solidworks for part files and as a group for assembly files
  3. Each person has to decide the dimension on the device to be verified. The verification can be done using manual method or features in CAD
  4. Finalize the dimensions in the Solidworks files
  5. Produce part drawing and assembly drawing

9 of 9

Project: Milestone

W09 (19 May) Group Supervision on Initial Sketch Design Embodiment and BOM

W10 (27 May) Group Supervision on CAD Modelling and discussion on individual Task

W12 (10 June) Group Supervision on Individual Task

W14 (23 June) Product Visualization and Engineering Drawing

W15 (20 June) Group Supervision before submission of final report

Submission of final report (30 June 2022)

  • Technical Report Part 2 (Chapter 4)
  • Design Portfolio
  • Product Demo (5 min video)