Elytt experience:

  • Iter TF Double Pancake conductor insulation and DP Impregnation
    • DP: 15 m long, 9 m wide

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

1

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

2 of 35

Elytt experience:

  • Iter TF Double Pancake conductor insulation and DP Impregnation

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

2

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

3 of 35

Elytt experience:

  • Iter TF Double Pancake conductor insulation and DP Impregnation

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

3

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

4 of 35

Elytt experience:

  • Iter PF Double Pancake and Winding Pack Impregnation
    • DP: up to 25 m diameter, 0,1 m height
    • WP: up to 25 m diameter, 1 m height

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

4

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

5 of 35

Elytt experience:

  • Most critical point for good VPI: compaction and resin paths
  • Mock ups needed
  • Important but easier to achieve:
    • Inclination
    • Resin degassing
    • Resin and mold temperature
    • Pumping speed
    • Resin back and forth
    • Vacuum level

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

5

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

6 of 35

Elytt Design review and manufacturability:

  • Design review recommendations (implemented):
    • Eliminate Kapton as much as possible as it causes delamination (only Kapton in OH conductor co-wound tape)
    • Eliminate G11 as much as possible to get continuous fiber wrap
    • Change blade length for G11 at ends (unique G11)
    • Round area and avoiding sharp corners
    • OH conductor terminals machined, not casted
  • Manufacturability
    • Difficult to achieve:
      • Wrapping: blades wrapping configuration
      • Impregnation:
        • Controlled compaction of fiber glass
        • Resin pads with resin paths in appropriate places
    • Less difficult to achieve (based on Elytt experience):
      • Other insulations (OH inner ground, OH conductor, OH outer ground, B stage, Inter Quadrant)
      • Vacuum level
      • Avoiding resin rich areas (use of tedlar)
      • All areas Resin wet (use of compaction tools, resin paths, inclination, resin degassing, resin and mold temperature, pumping speed, resin back and forth)
    • Strongly recommended: mock ups

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

6

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

7 of 35

Manufacturing Plan:

Compaction test (as calculation input)

Final tooling preliminary design

Final tooling calculation (thermal and structural)

Final tooling design

Design mock up tooling adapting final tooling

Manufacture mock ups tooling

Manufacture & test mock up

Manufacture Final tooling

Manufacture & test TF-OH

Modify Final tooling if needed

Define Final manufacturing procedures

Define Final IP

Modify Final IP

Modify Final manufacturing procedures

Risk analysis

TIME

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

7

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

8 of 35

Manufacturing Plan:

1 m Quadrant mock up. Grit blasting and prime

TF-OH first quadrant Blades grit blasting and prime

1 m Quadrant Blades stacking

TF-OH first quadrant Blades stacking

1 m Quadrant VPI and tests

TF-OH first quadrant VPI

4 quadrant mock up

TF-OH TF 4 quadrant integration and wrapping

TF compaction mock up

TF VPI mock up

TF-OH TF VPI

OH mock up. B stage

TF-OH OH B stage

OH mock up. Winding

TF-OH OH winding

OH mock up. VPI

TF-OH OH VPI

TIME

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

8

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

9 of 35

Mock ups:

Title/Description

Objective

Material & Tooling

Configuration & Procedure

Completion

Schedule

SOW 2.1.2 A: TF Wrapping Tests (3D Printed Parts)

 

 

 

Define wrapping technique

Define fabric patterns (.dxf files for Co2 Laser machine)

  • Blade 3 D printed
  • Legacy PPPL roll tape 50mm width (no fabric available)
  • Elytt property Woven clothes from Tisstech (thickness 0.2mm and width 400mm)
  • Preliminary layer configuration and sequence with legacy tape and Elytt fabric

  • Preliminary Blade wrapping procedure

June 2022

SOW 2.1.2 B: TF Conductor Wrapping Tests (PPPL Conductor Sample)

 

 

 

  • Confirm wrapping technique
  • Confirm geometry of fabric patterns
  • Full coverage of copper check
  • Tacking material test
  • Legacy PPPL Blade
  • Legacy PPPL tape
  • Elytt property Woven clothes from Tisstech (thickness 0.2mm and width 400mm)
  • 2 tackifiers (Hunstman Araldite 2011 and CTD-BDR-1.0)

  • Final layer configuration and sequence with legacy tape and Elytt fabric

  • Final Blade wrapping procedure
  • Preliminary IP procedure

August 2022

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

9

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

10 of 35

Mock ups:

Title/Description

Objective

Material & Tooling

Configuration & Procedure

Completion

Schedule

SOW 2.1.2 C-1: TF Flat Mock-Up and Compaction. Preliminary

 

 

Define pressure for 20% compression on the S-2 glass for tooling calculation (security factor to be applied)

  • Legacy PPPL tape (no fabric available)

  • Similar to final configuration but with tape

  • Preliminary Report of S-2 fiberglass insulation compaction

June 2022

SOW 2.1.2 C-1: TF Flat Mock-Up and Compaction. Final

 

 

Confirm pressure to obtain 20% compression

  • Final S2 tape
  • Final S2 fabric
  • Final configuration
  • Final compaction value

  • Final Report of S-2 fiberglass insulation compaction

September 2022

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

10

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

11 of 35

Mock ups:

Title/Description

Objective

Material & Tooling

Configuration & Procedure

Completion

Schedule

SOW 2.1.2 D: 1 Meter Quadrant Mock-Up and VPI (Extruded Coolant Channel s/Surplus PPPL Conductors)

 

 

Blade grit blasting and clean

  • Legacy Blade with scallop machined
  • Final grit
  • Final cleaning agent
  • Nitrogen Gas

  • Final Grit blasting machine
  • Final portable crane
  • Final blade lifting tool and lifting beam
  • Portable Surface Roughness Tester

  • Final grit blasting procedure
  • Final cleaning procedure
  • Final IP procedure

October 2022

Blade prime and cure

  • Final primer CTD-450
  • Final cleaning agent

  • Final priming station
  • Final prime curing station
  • Final portable crane
  • Final blade lifting tool and lifting beam
  • Coating Thickness Gauge
  • Final primer applied according to specs

  • Final primer application procedure
  • Final primer curing procedure
  • Final cured prime cleaning procedure
  • Final IP procedure

October 2022

Blade wrapping

  • Final S2 tape
  • Final S2 fabric
  • Final G11
  • Final connection area masking plate and bolts
  • Final tackifier

  • Final wrapping station
  • Final portable crane
  • Final blade lifting tool and lifting beam
  • Almost Final S2 tape/S2 fabric/G11/tacking configuration (legacy blade)

  • Final tacking procedure
  • Almost Final wrapping procedure (legacy blade)
  • Final IP procedure

November 2022

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

11

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

12 of 35

Mock ups:

Title/Description

Objective

Material & Tooling

Configuration & Procedure

Completion

Schedule

SOW 2.1.2 D: 1 Meter Quadrant Mock-Up and VPI (Extruded Coolant Channel s/Surplus PPPL Conductors)

 

 

Blade stacking and shrinkage tape wrap

  • Final de-moulding shrinkage tape
  • Final tackifier

  • Final Blade stacking and quadrant wrapping station
  • Final fillers, parker plugs and resin pads
  • Final portable crane
  • Final blade lifting tool and lifting beam
  • Elytt 10tn lifting beam
  • S2 tape/tacking final configuration

  • Almost Final Blade stacking procedure (legacy blade)
  • Final tacking procedure
  • Final IP procedure

November 2022

Quadrant VPI and cure

  • Final resin CTD-425

  • Specific compaction and VPI mold and support based on Final design
  • Final impregnation station
  • Final curing station with some adjustments
  • Elytt crane
  • Elytt 10tn lifting beam
  • Trumpf TruTool nibller (casing cutting)

  • Almost Final compaction procedure
  • Almost final impregnation mould (casing) assembly and welding procedure
  • Final VPI and cure procedure
  • Almost Final de-moulding procedure
  • Final IP procedure
    • Visual inspection of impregnated areas and cooling holes (no resin inside)
    • Dimensional control
    • Electrical tests

December 2022

Testing

  • Cut
  • Macrographic inspection
  • Mechanical tests

December 2022

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

12

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

13 of 35

Mock ups:

Title/Description

Objective

Material & Tooling

Configuration & Procedure

Completion

Schedule

SOW 2.1.2 E: 2.5 Meter Cylindrical TF Mock-Up Compaction Test

 

Compaction of TF bundle ground insulation and shrinkage tap wrap

  • Final S2 tape
  • Final de-moulding shrinkage tape

  • Final TF bundle wrapping station
  • Final TF bundle compaction tooling
  • Elytt crane
  • Elytt 10tn lifting beam
  • Final S2 tape configuration

  • Final TF ground insulation procedure
  • Final compaction procedure
  • Final IP procedure

December 2022

SOW 2.1.2 F: 2.5 Meter Cylindrical TF Mock-Up VPI (on 2.5m TF compaction mock up)

 

VPI and cure

  • Final resin CTD-425

  • Specific VPI mold and Support
  • Final impregnation station
  • Final curing station with some adjustments
  • Elytt crane
  • Elytt 10tn lifting beam

  • Final VPI and cure procedure
  • Final IP procedure

December 2022

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

13

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

14 of 35

Mock ups:

Title/Description

Objective

Material & Tooling

Configuration & Procedure

Completion

Schedule

SOW 2.1.2 H: 2.5 Meter OH Coil Mock-Up Compaction VPI (using 2.5 TF mockup VPIed)

 

 

B stage and shrinkage tape wrap

  • Final B stage tape
  • Final de-moulding shrinkage tape

  • Specific compaction and curing mold based on final design
  • Final curing station with some adjustments
  • Elytt crane
  • Elytt 10tn lifting beam
  • PPPL winding line

  • Final B stage configuration

  • Final B stage winding procedure
  • Final B stage compaction procedure
  • Final B stage curing procedure
  • Final IP procedure

January 23

Teflon

  • Final Teflon tape

  • Teflon fixing tooling
  • Final Teflon configuration

  • Final Teflon wrapping and fixing procedure
  • Final IP procedure

January 2023

Inner Ground wrapping

  • Final S2 tape

  • Final TF wrapping station
  • Elytt crane
  • Elytt 10tn lifting beam
  • Final S2 tape configuration

  • Final OH inner ground insulation procedure
  • Final IP procedure

January 2023

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

14

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

15 of 35

Mock ups:

Title/Description

Objective

Material & Tooling

Configuration & Procedure

Completion

Schedule

SOW 2.1.2 H: 2.5 Meter OH Coil Mock-Up Compaction VPI (using 2.5 TF mockup VPIed)

 

 

OH conductor winding+bending+pancake brazing+terminal brazing

  • Legacy OH conductor
  • Final S2-Kapton co-wound tape
  • Final G11 termination area fillers
  • Final G11 terminal box and fillers
  • Final terminals
  • Final brazing material

  • PPPL S2-Kapton co-winding station
  • PPPL winding station and tools with configuration of legacy OH conductor
  • G11 terminal box fixing tool
  • Final bending tools with some adaptations
  • Final brazing tools with some adaptations
  • Final S2-Kapton co-wound tape configuration
  • Final OH conductor winding configuration
  • Final termination configuration
  • Final G11 termination area with fillers configuration
  • Final G11 terminal box and fillers configuration

  • Final co-wound tape manufacturing procedure
  • Final winding procedure
  • Final bending procedure
  • Final termination brazing procedure
  • Final pancake brazing procedure
  • Final G11 termination filler installation procedure
  • Final G11 terminal box and filler installation procedure

February 2023

Outer Ground wrapping

  • Final S2 tape
  • Final tacking

  • Final TF wrapping station
  • Elytt crane
  • Elytt 10tn lifting beam
  • Final S2 tape/tacking configuration

  • Final tacking procedure application
  • Final OH outer ground procedure application
  • Final IP procedure application

February 2023

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

15

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

16 of 35

Mock ups:

Title/Description

Objective

Material & Tooling

Configuration & Procedure

Completion

Schedule

SOW 2.1.2 H: 2.5 Meter OH Coil Mock-Up Compaction VPI (using 2.5 TF mockup VPIed)

 

 

OH solenoid VPI and cure

  • Final resin CTD-425

  • Specific compaction and VPI mold based on Final design
  • Final impregnation station
  • Final curing station with some adjustments
  • Elytt crane
  • Elytt 10tn lifting beam

  • Almost Final caps installation procedure
  • Almost Final compaction procedure
  • Final VPI and cure procedure
  • Final demoulding procedure
  • TF-OH layers extraction procedure
  • Final IP procedure
    • Visual inspection of impregnated areas and TF-OH gap (no resin interlayer)
    • Dimensional control
    • Electrical tests

March 2023

Testing

  • Cut
  • Macrographic inspection

March 2023

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

16

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

17 of 35

Mock ups:

Title/Description

Objective

Material & Tooling

Configuration & Procedure

Completion

Schedule

SOW 2.1.2 G: Four Quadrant VPI Simulation

Inter quadrant Ground insulation

  • Final S2 fabric
  • Final tacking
  • G11 inner tube

  • Final TF wrapping station
  • Elytt crane
  • Final inter quadrant S2 fabric/tacking configuration

  • Final tacking procedure
  • Final inter quadrant ground insulation procedure
  • Final IP procedure

January 2023

Quadrant VPI and cure

  • Final resin

  • Specific compaction and VPI mold and support based on Final design
  • Final impregnation station
  • Final curing station with some adjustments
  • Elytt crane

  • Almost Final caps installation procedure
  • Almost Final compaction procedure
  • Final VPI and cure procedure
  • Final IP procedure

February 2023

Testing

  • Cut
  • Macrographic inspection

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

17

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

18 of 35

Mock ups:

Title/Description

Objective

Material & Tooling

Configuration & Procedure

Completion

Schedule

SOW 2.1.2 I: Deep Gun Drilling Prototype Back-Up Source

 

Blade deep drilling

  • Legacy blade

  • Final Drill bit
  • Almost Final Drilling tool (legacy blade)
  • Subcontractor crane
  • Subcontractor lifting beam

  • Final drilling procedure
  • Final IP procedure

July 2022

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

18

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

19 of 35

Blade wrapping proposal:

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

19

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

20 of 35

Blade wrapping proposal:

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

20

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

21 of 35

Blade wrapping proposal:

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

21

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

22 of 35

Blade wrapping proposal:

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

22

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

23 of 35

Blade wrapping proposal:

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

23

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

24 of 35

Blade wrapping proposal:

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

24

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

25 of 35

Blade wrapping proposal:

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

25

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

26 of 35

Blade wrapping proposal:

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

26

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

27 of 35

Blade wrapping proposal:

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

27

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

28 of 35

Blade wrapping proposal:

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

28

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

29 of 35

Blade wrapping proposal:

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

29

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

30 of 35

Blade wrapping proposal:

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

30

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

31 of 35

Blade wrapping proposal:

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

31

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

32 of 35

Blade wrapping proposal:

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

32

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

33 of 35

Blade wrapping proposal:

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

33

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

34 of 35

Blade wrapping proposal:

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

34

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing

35 of 35

Blade wrapping proposal:

Calle Orense 11, 2 º B - 28020 Madrid - Spain - Phone: +34 91 411 09 63 - Fax: +34 91 411 09 64 - www.elytt.com

35

NSTX-U TF-OH Bundle FDR. Elytt manufacturing plan and prototype testing