SAP Production Planning & Distribution
in S/4 2020
Mass Change BOM item
using Backend system and FIORI
CC01
Create Change Number
Valid from 01.01.2022
Change Number “C1” valid for BOM changes
Material T-R115 is in BOM T-F115
CS15 Where-used List
check Material T-R115 also included in which Material BOM
Raw Material T-R115 is in 4 Material BOMs
now we apply Change Number C1 to mass change from Material T-R115 to T-R116 for all BOM
check which BOM contain T-R115
for all BOM that have T-R115,
we ADD new Material T-R116 as item 0100
Material T-R116 added to the BOMs
now Delete T-R115 from all BOMs using Change Number C1
Delete T-R115 from these BOMs
check BOM for the Engineering Change
Change number “C1” set valid end date 01.01.2022 to T-R115 for all BOMs
Change number “C1” set valid start date 01.01.2022 to T-R116 for all BOMs
Change Number “C2”
Change Number “C2” valid from 01.02.2022
Activate this Change Number for BOM change
Change Number “C2” not yet applied to any BOM changes
check T-R215 usage in which BOMs
T-R215 is in 5 BOMs
select all BOMs, click “Replace Material”
Replace T-R215 with T-R216 with 1pc using Change Number “C2”
Confirm/Post the Replacement
Changes applied but mistake Qty (should be 4)
CCUNDO to “Undo” Change number “C2” applied to BOMs
Engineering Changes UNDOne
select all BOMs, click “Replace Material”
make the correct Engineering Change requirement
Confirm Requirement
Change number “C2” set valid end date 01.02.2022 to T-R215 for all BOMs
Change number “C2” set valid start date 01.02.2022 to T-R216 for all BOMs