1 of 5

PROPOSAL

Reducing Physical Strain for Full-Time Associates

A two-week pilot to rotate heavy tasks and adjust rate targets for heavy items

Executive summary

Problem: physical strain from 10 to 12 hour shifts is driving sick days and turnover.

Recommendation: rotate heavy and light tasks and set rate targets that account for heavy items.

Ask: approve a two-week pilot on one day-shift team, led by the floor team lead.

2 of 5

Physical strain and rate pressure are driving sick days and turnover in our largest group

Full-Time Associates pilot proposal

2

75 of 125

Glassdoor reviews come from Full-Time Associates

About 1 in 3

of their reviews mention physical strain or quota pressure

43%

of their reviews raise leadership or promotion concerns

“Standing +10 hours... Get write ups for not meeting their rate expectations.”

Associate review, Glassdoor

3 of 5

Full-Time Associates carry most of the daily floor work, so losing them hits output the most

Full-Time Associates pilot proposal

3

Size

75 of 125 reviews (60%), the largest group

Impact

Core of daily operations; output drops first when they are absent

Severity

Strain and rate pressure show up in their reviews most often

Score

100 out of the five segments, ahead of Managers & Specialists at 40

4 of 5

Rotating heavy tasks and adjusting targets for heavy items addresses the root cause

Full-Time Associates pilot proposal

4

What we would change

Rotate heavy and light tasks across each shift

Set rate targets for heavy items that account for weight and shift length

Track rotations and pain each shift on a shared sheet

Why it should work

Root cause: targets ignore physical load, so people skip rests to protect their rate

A rotation study found cyclic schedules about 25% better on ergonomic fit than random ones

Warehouse work that moved heavy items to better heights cut reaches per pallet by 60 to 70%

5 of 5

A two-week pilot in one zone will show whether strain and rotations improve

Full-Time Associates pilot proposal

5

Week 0

Briefing and baseline

Team lead briefs the team and records week-one pain scores

Week 1

Pilot starts

Rotations and heavy-item targets run on the day shift

Week 2

Review

Compare rotations and pain scores with the baseline

Owner

Floor team lead for the heavy-item zone, supported by a Learning Ambassador

Success metric

End-of-shift pain score falls by at least 1 point from the week-one average, with rotations on most shifts