1
Welcomes the Expert Appraisal Committee (Non-coal Mining)
in the Environment Clearance Presentation for
(As per EIA Notification, 2006 and amended from time to time)
—------Project Name —-----
At
—-----Address—-----
EC No : dated: —----
Proposal No. : —---
Agenda & Date- —---
Environment Consultants:
M/s Perfact Enviro Solutions Pvt. Ltd.
NABET Registered Organisations/ NABET/EIA/2225/RA 0284 (Rev. 01)
(An ISO 9001:2008 & ISO 14001:2004 Certified Company)
5th Floor, NN Mall, Mangalam Place, Sector 3,Rohini,
New Delhi-110085
Project Proponent:
Email:
Contact No :
M/s.
PP Logo
Highlights of the Project
2
P P Logo
Justification of the Project
3
P P Logo
Status of Approvals & Consents
4
Particulars | Dates | Details |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
P P Logo
Project Proposal & Location
S.No | Particulars | Details | |
A. | | Particulars | Details |
| | ||
| | ||
| | ||
| | ||
| | | |
B. | Project Location | ||
| ML Area | | |
2. | Location of Mine site | | |
3. | Toposheet No | | |
4. | Latitude & Longitude | | |
Minimum Elevation - —--mRL
Maximum Elevation - —--- mRL
KML link for reference
5
P P Logo
Environmental Settings - Study Area (10 km)
6
S.No. | PARAMETERS | DETAILS |
1. | Habitation in close proximity | |
2. | Schools in close proximity | |
S.No | Name of Village | Distance & Direction from Lease boundary |
1. | | |
2. | | |
3. | | |
4. | | |
S.No | Name of Schools | Distance & Direction from Lease boundary |
| | |
2. | | |
3. | | |
P P Logo
Environment Settings- Study Area (10 Km)
7
S.No. | PARAMETERS | DETAILS |
a. | Water Body (within 10 km radius) | |
b. | National Highway/State Highway | |
c. | Railway line | |
d. | Nearest Habitation | |
e. | National Parks, Wildlife Sanctuaries, Biosphere Reserves within 10 km radius | |
f. | Nearest Town / City | |
g. | Seismic Zone | |
h. | Critically Polluted area (CPA) | |
P P Logo
Project Details
8
S.No. | PARAMETERS | Existing | Additional for 20% expansion | Total | Source |
a. | Water Requirement (KLD) | 161 | 06 | 167 | 6.0 KLD will be met from Ground Water (Tubewell),16 KLD treated water and remaining 145 KLD is met from surface mine pit. |
b. | Manpower Requirement (Nos) | 105 | 36 | 141 | - |
c. | Financial Requirement | ||||
1. | Capital cost for EMP (In Lakhs) | 924.43 | 52.244 | 976.674 | - |
2. | Recurring Cost for EMP (In Lakhs) | 59.17 | 4.11 | 63.28 | - |
e. | Project Cost (Rs. In Lakhs) | 8770.00 | 724.55 | 9494.55 | - |
P P Logo
Salient Features & Mining Method of the Project
9
Particulars | Details |
Lease Area | |
Land Details | |
Geological Reserves | |
Mineable Reserves | |
Total Excavation | |
Life of Mine | |
Method of Mining | |
Bench Specification | |
Ultimate Pit Slope | |
Crusher | |
P P Logo
Proposed Production
10
The year-wise production and waste/topsoil removal is given in the table below:
S. No. | Year | Total Excavation (MT) | Top Soil Generation (MT) | Waste Quantity (MT) | ROM Quantity (MT) | ROM Quantity Saleable Mineral (MT) | ROM Quantity Mineral Reject (MT) |
1 | | | | | | | |
2 | | | | | | | |
3 | | | | | | | |
4 | | | | | | | |
5 | | | | | | | |
42
P P Logo
Land-Use of Core Zone
11
S No. | Pattern of Utilisation | Present (ha.) | At the end of Plan Period (ha.) | At the Conceptual Stage (ha.) |
1 | Area under Mining | | | |
2 | Overburden/Waste Dumping | | | |
3 | Mineral Storage | | | |
4 | Infrastructure (Workshop, Administrative Building etc.) | | | |
5 | Roads | | | |
6 | Water Reservoir considered Rehabilitated | | | |
7 | Mined out Area fully Rehabilitated from Reclaimed area | | | |
8 | Plantation | |||
8(a) | Green Belt under 7.5 m boundary | | | |
8(b) | Plantation over virgin area | | | |
9 | Undisturbed/Virgin | | | |
10 | Others | | | |
| Total | | | |
63
P P Logo
Post Mining(Conceptual Plan)
12
S No. | Description | Land Use (ha) | ||||
Plantation | Public Use | Water Body | Undisturbed | Total | ||
1 | Excavation (Voids only) | | | | | |
2 | Excavation (Bench) | | | | | |
3 | Waste Dump | | | | | |
4 | Infrastructure (Workshop, Administrative Building etc.) (Utility services) | | | | | |
5 | Green belt and plantation | | | | | |
| Total | | | | | |
63
P P Logo
P P Logo
Plan for Greenbelt & Plantation
14
Particulars | Safety barrier zone (7.5m) Green belt | Other than Safety barrier zone | Type of sapling | ||
Area in Ha | Nos. of sapling | Area in Ha | Nos. of sapling | ||
Existing plantation of barrier zone | | | | | |
Conceptual Stage | | | | | |
Total | | | | | |
Survival rate: More than —-----%
Density: —----- trees/ha
P P Logo
Existing Plantation Photographs
P P Logo
16
Baseline Study Area Map with Locations
— Locations | |
Core Zone | |
Buffer Zone | |
Winter Season (----- 202– to —----- 202—)
— Locations | |
Core Zone | |
Buffer Zone | |
—-Locations | |
SW | |
GW | |
—-Locations | |
Core Zone | |
Buffer Zone | |
P P Logo
Baseline Study Reports
17
BASELINE PERIOD : Winter Season (December 2023 to February 2024)
Parameters | Winter Season (December 2023 to February 2024) | |||||
No. of Location | Description | Standards | ||||
Ambient Air Quality Monitoring | | Core Zone (2 Locations) | Buffer Zone (8 Locations) | | ||
| | | ||||
| | | ||||
| | | ||||
| | | ||||
| | | ||||
AAQ modeling (Incremental GLC) Model Used: AERMOD version 10.2.1 | | | | |||
| | |||||
| | |||||
| | |||||
| | |||||
Noise Level Monitoring | | | | | | |
| | | | |||
| | | | |||
P P Logo
18
Baseline Study Reports
Parameters | Winter Season (December 2023 to February 2024) | ||
No. of Location | Description | Standards | |
Surface Water | | | |
| |||
| |||
| |||
Groundwater | | | |
| | ||
| | ||
| | ||
| | ||
Soil Sampling | | | |
P P Logo
19
Air Pollution and Mitigation
P P Logo
Air Pollution and Mitigation
P P Logo
Environmental Impact & Mitigation Measures
21
P P Logo
22
Noise & Vibration Control Measures
P P Logo
23
Mitigation Measures for Water Pollution
59
177
P P Logo
24
Water Management
P P Logo
25
Biological & Socio-Economic Environment Management Plan
P P Logo
26
Solid Waste & Hazardous Waste Management Practices
P P Logo
27
Budget for Occupational Health and Safety
P P Logo
Environment Management Plan Cost
P P Logo
29
Certified Compliance Status
Integrated Regional Office, Jaipur has visited the site on 13.06.2024 for certified compliance.
Type of Condition | No. of Conditions | Complied / Agreed to Complied /being Complied | Compliance not applicable | Non- Compliance |
Specific Conditions | | | | |
General Conditions | | | | |
P P Logo
Project Benefits
30
Employment potential | |
Community Development | |
Social Development | |
Contribution to Government Exchequer | |
31
Thank You
P P Logo