1 of 31

1

Welcomes the Expert Appraisal Committee (Non-coal Mining)

in the Environment Clearance Presentation for

(As per EIA Notification, 2006 and amended from time to time)

—------Project Name —-----

At

—-----Address—-----

EC No : dated: —----

Proposal No. : —---

Agenda & Date- —---

Environment Consultants:

M/s Perfact Enviro Solutions Pvt. Ltd.

NABET Registered Organisations/ NABET/EIA/2225/RA 0284 (Rev. 01)

(An ISO 9001:2008 & ISO 14001:2004 Certified Company)

5th Floor, NN Mall, Mangalam Place, Sector 3,Rohini,

New Delhi-110085

Project Proponent:

Email:

Contact No :

M/s.

PP Logo

2 of 31

Highlights of the Project

2

P P Logo

3 of 31

Justification of the Project

3

P P Logo

4 of 31

Status of Approvals & Consents

4

Particulars

Dates

Details

P P Logo

5 of 31

Project Proposal & Location

S.No

Particulars

Details

A.

Particulars

Details

B.

Project Location

ML Area

2.

Location of Mine site

3.

Toposheet No

4.

Latitude & Longitude

Minimum Elevation - —--mRL

Maximum Elevation - —--- mRL

KML link for reference

5

P P Logo

6 of 31

Environmental Settings - Study Area (10 km)

6

S.No.

PARAMETERS

DETAILS

1.

Habitation in close proximity

2.

Schools in close proximity

S.No

Name of Village

Distance & Direction from Lease boundary

1.

2.

3.

4.

S.No

Name of Schools

Distance & Direction from Lease boundary

2.

3.

P P Logo

7 of 31

Environment Settings- Study Area (10 Km)

7

S.No.

PARAMETERS

DETAILS

a.

Water Body (within 10 km radius)

b.

National Highway/State Highway

c.

Railway line

d.

Nearest Habitation

e.

National Parks, Wildlife Sanctuaries, Biosphere Reserves within 10 km radius

f.

Nearest Town / City

g.

Seismic Zone

h.

Critically Polluted area (CPA)

P P Logo

8 of 31

Project Details

8

S.No.

PARAMETERS

Existing

Additional for 20%

expansion

Total

Source

a.

Water Requirement (KLD)

161

06

167

6.0 KLD will be met from Ground Water (Tubewell),16 KLD treated water and remaining 145 KLD is met from surface mine pit.

b.

Manpower Requirement (Nos)

105

36

141

-

c.

Financial Requirement

1.

Capital cost for EMP (In Lakhs)

924.43

52.244

976.674

-

2.

Recurring Cost for EMP (In Lakhs)

59.17

4.11

63.28

-

e.

Project Cost (Rs. In Lakhs)

8770.00

724.55

9494.55

-

P P Logo

9 of 31

Salient Features & Mining Method of the Project

9

Particulars

Details

Lease Area

Land Details

Geological Reserves

Mineable Reserves

Total Excavation

Life of Mine

Method of Mining

Bench Specification

Ultimate Pit Slope

Crusher

P P Logo

10 of 31

Proposed Production

10

The year-wise production and waste/topsoil removal is given in the table below:

S. No.

Year

Total Excavation (MT)

Top Soil Generation (MT)

Waste Quantity (MT)

ROM Quantity (MT)

ROM Quantity

Saleable Mineral (MT)

ROM Quantity

Mineral Reject

(MT)

1

2

3

4

5

42

P P Logo

11 of 31

Land-Use of Core Zone

11

S No.

Pattern of Utilisation

Present (ha.)

At the end of Plan Period (ha.)

At the Conceptual Stage (ha.)

1

Area under Mining

2

Overburden/Waste Dumping

3

Mineral Storage

4

Infrastructure (Workshop,

Administrative Building etc.)

5

Roads

6

Water Reservoir considered Rehabilitated

7

Mined out Area fully Rehabilitated from Reclaimed area

8

Plantation

8(a)

Green Belt under 7.5 m boundary

8(b)

Plantation over virgin area

9

Undisturbed/Virgin

10

Others

Total

63

P P Logo

12 of 31

Post Mining(Conceptual Plan)

12

S No.

Description

Land Use (ha)

Plantation

Public Use

Water Body

Undisturbed

Total

1

Excavation (Voids only)

2

Excavation (Bench)

3

Waste Dump

4

Infrastructure (Workshop,

Administrative Building etc.)

(Utility services)

5

Green belt and plantation

Total

63

P P Logo

13 of 31

P P Logo

14 of 31

Plan for Greenbelt & Plantation

14

Particulars

Safety barrier zone (7.5m) Green belt

Other than Safety barrier zone

Type of sapling

Area in Ha

Nos. of sapling

Area in Ha

Nos. of sapling

Existing plantation of barrier zone

Conceptual Stage

Total

Survival rate: More than —-----%

Density: —----- trees/ha

P P Logo

15 of 31

Existing Plantation Photographs

P P Logo

16 of 31

16

Baseline Study Area Map with Locations

— Locations

Core Zone

Buffer Zone

Winter Season (----- 202– to —----- 202—)

— Locations

Core Zone

Buffer Zone

—-Locations

SW

GW

—-Locations

Core Zone

Buffer Zone

P P Logo

17 of 31

Baseline Study Reports ​

17

BASELINE PERIOD : Winter Season (December 2023 to February 2024)

Parameters

Winter Season (December 2023 to February 2024)

No. of Location

Description

Standards

Ambient Air Quality Monitoring

Core Zone (2 Locations)

Buffer Zone (8 Locations)

AAQ modeling (Incremental GLC)

Model Used: AERMOD version 10.2.1

Noise Level Monitoring

P P Logo

18 of 31

18

Baseline Study Reports ​

Parameters

Winter Season (December 2023 to February 2024)

No. of Location

Description

Standards

Surface Water

Groundwater

Soil Sampling

P P Logo

19 of 31

19

Air Pollution and Mitigation

P P Logo

20 of 31

Air Pollution and Mitigation

P P Logo

21 of 31

Environmental Impact & Mitigation Measures

21

P P Logo

22 of 31

22

Noise & Vibration Control Measures

P P Logo

23 of 31

23

Mitigation Measures for Water Pollution

59

177

P P Logo

24 of 31

24

Water Management

P P Logo

25 of 31

25

Biological & Socio-Economic Environment Management Plan

P P Logo

26 of 31

26

Solid Waste & Hazardous Waste Management Practices

P P Logo

27 of 31

27

Budget for Occupational Health and Safety

P P Logo

28 of 31

Environment Management Plan Cost

P P Logo

29 of 31

29

Certified Compliance Status

Integrated Regional Office, Jaipur has visited the site on 13.06.2024 for certified compliance.

  • There are No Non- Compliances in the Certified Compliance Report

Type of Condition

No. of Conditions

Complied / Agreed to Complied /being Complied

Compliance not applicable

Non- Compliance

Specific Conditions

General Conditions

P P Logo

30 of 31

Project Benefits

30

Employment potential

Community Development

Social Development

Contribution to Government Exchequer

31 of 31

31

Thank You

P P Logo