Capital Project Update
Building�Trinity's�Future
A Foundation that is Sustainable
eco
Environmental & Financial Impact
New hall roof insulation, an upgraded HVAC system, and solar panels will dramatically lower our carbon footprint while reducing energy costs.
fit_screen
Flexible Worship Space
Reconfiguring our space offers the physical flexibility to worship together in modern, diverse, and deeply engaging ways.
groups
Community & Creative Hub
Our doors will open wider as a home for music, arts, and community in Sacramento, unlocking vital new income opportunities.
plan of our flexible, sustainable cathedral layout.
How Far We've Come
$5M
Total Capital Secured
$2.5M
New Funds Raised
$2.5M
Existing Parish Reserves
Where We Are
01
Vision Approved
✓ Complete
02
Conceptual Designs
✓ Complete
03
Fundraising Underway
✓ Complete
04
Contractor Selection
Active
Final Costs
05
Detailed Design & Permitting
Next Phase
06
Construction Begins
Summer 2027
Project Team
Tim Matteis
Architect
Bob Earl
Owner's Representative
Anita Williams
Junior Warden & Project Lead
Construction Underway
01
Great Hall Roof
✓ Complete
02
HVAC Installation
Underway
03
Solar Integration
Up Next
What We're Building
Sanctuary Remodel
Trinity Episcopal Cathedral
Thoughtful, respectful, flexible, practical.
Key Enhancements
Worship Layout
Event & Concert Layout
Furniture Inspiration 1
Epsom College Chapel
COLLEGIATE SEATING
Traditional chapel layout with contemporary light-wood pews, maximizing floor space and alignment.
Furniture Inspiration 2
St Mary's, Iffley
PRAYER GROUP SETUP
Flexible, modular chancel layout designed specifically to accommodate smaller, intimate prayer groups.
Furniture Inspiration 3
St Luke's, Darien
CHILDREN'S CHAPEL
Warm wood paneling combined with low-profile, flexible benches suitable for family and youth worship.
Timeline
01
Contractor Selection
02
Design & Permitting
03
Construction Start
Summer 2027
"the congregation are off to camp"
04
Christmas 2027
Still working on site
05
Easter 2028
Back home
Where Shall We Worship?
01
Great Hall
02
Easter Park
03
Pioneer
04
B Street Theatre
05
St Paul's
06
Home Groups
07
Sutter Auditorium
08
Mixed Model
Decision Making
Thank you for your input
01
Suggestions gathered today will be added to those already received.
02
The Building and Tech committee, or a sub-group, will assess viability.
03
A recommendation will be made to the Vestry and shared.
Discussion
Discussion Time
15
Minutes
Suggested time for group discussion
Topic of Exploration
What ideas do you have that we should explore?
We want to hear your thoughts on potential paths forward. Take this time to brainstorm freely. Appoint a scribe to write them down on the paper in your group, we will collect all the ideas and consider them.
Alternative Submission
If you get an idea later, you can email: 2027Renovation@TrinityCathedral.org