LOP Obeya – v.2025

List of open points – todo’s

By www.thefilesmarket.com

2 of 62

  1. Sheets «Focal points »
    1. Define project deliverables vs. gate reviews
    2. Enter a comment
    3. Set status of the deliverables
    4. Links Menu
  2. Sheets « LOP » (List of Open Points)
  3. Sheet « Teams »
  4. Sheet « Minutes »
  5. Sheet « Stickers_5Weeks » Visible when LOP mode = Due Date

Table of content

3 of 62

  1. Sheet « Sticker status » Visible when LOPmode =Sprint
    1. Create new Sticker
    2. Possible actions on stickers
      1. Change Title or action
      2. Move task – change Due Date
      3. Create sub task
      4. Add a comment
      5. Change Owner
    3. Move Sticker(s) to the next sprint
    4. Close or cancel sticker(s)
    5. Open sticker properties window - <<F2 shortcut >>
    6. Change stickers size parameters
  2. Sheet Planning Poker Visible when LOP mode = Sprint and planning poker is activated
  3. Sheets «Timing »
  4. Sheets « Graph ressources »
    • Update ressources load and drive analysis

Table of content

4 of 62

Sheets « Focal points 

To organize your project with deliverables & gate reviews

5 of 62

Sheets « Focal points

Define project deliverables vs. gate reviews 

  • Writing in column «GR » will auto format the row as a new Phase
  • Writing in column « Del. » will auto format the row as a a deliverable
  • Writing in column « Sub tasks » will auto format the row as a sub-task of the deliverable

6 of 62

Today = 22th of August 2025

Enter by double click

in column « Comments » will add automatically prefix corresponding to the date of the day

Sheet Focal Points

Enter a comment

7 of 62

Predefined status

Select the cell status and choose status from the list

Sheet Focal Points

Change status of the deliverable

8 of 62

Once the hyperlink is created, click on it to open the sub folder linked to the deliverable where will be stored the deliverables

Open Links menu

Select path of the main folder where sub-folders will be created

Select the folder structure template you want to create for each new sub-folder

Create hyperlinks by double click in the specific cell

1

2

3

4

Sheet Focal Points

Links menu : create hyperLinks to folders

9 of 62

Sheet LOP

10 of 62

Sheet LOP

Set LOP Mode : Due date or Sprint

Open Scrum menu

1

Mode « Due date » :

  • Tasks will have due dates
  • Kanban board sheet is then set to focus on tasks due in the 5 next weeks

Mode « Scrum» :

  • Tasks will be included in project sprints (no due date)

Parameters to set :

    • Project starting date : equivalent to the date when Sprint #1 will start
    • Sprint –time interval : duration of a sprint
  • Kanban board sheet is then set to focus on tasks status

Select Due Date

2

Select Scrum

Or

11 of 62

Sheet LOP

Set LOP Mode : Due date or Sprint

Mode « Scrum» witth « Planning poker » ON

  • Tasks will be included in project sprints (no due date)
  • Complexity of each task will be assessed by team members in a range 1 to 100
  • Depending velocity of each team/ower planning poker chart will estimate end of the project when all tasks included in the LOP will be completed

>> Sheet « Planning Poker »

Example :

Sum of the task affected to « Rémy » in the Team « Design is equal to 21

Velocity of Rémy to close actions have been evaluated to « 7 » from past activities

Rémy should take 3 sprints to close his tasks as a given target

Refresh database

Set appropriate filters

1

2

12 of 62

Sheet LOP

Create a new task

  • Writing in column « T » will auto format the row as a title
  • Writing in column « A » will auto format the row as an action
  • Writing in column « Sub tasks » will auto format the row as a sub task of the action
  • ID and creation date will be filled automatically when an entry will be done on a new line

13 of 62

Today = 19th of October 2024

Enter by double click

in column « Comments » will add automatically prefix corresponding to the date of the day

Sheet LOP

Enter a comment

14 of 62

Revise due date as required entering in the column due date by double click

or do ALT+ENTER in the cell

Automatic color setting highlights delayed items

Creation Date, Due Date and closing date columns accept date entry as:

Date format : dd/mm/yyyy or dd/mm

And week number: 1 🡪 52 W1 🡪 W52 W##-yyyy

Macro will convert your entries in : dd-mmm-yyyy format for dates

W##-yyyy for weeknum

Sheet LOP

Enter a date

15 of 62

Double click in columns accepting dates will set the date of the day

ID numbers are set automatically when a new action is created

Column status is updated automatically according to other cells entry

New/Not Started/Doing/On-time?/In late/Done

Today = 19th of October 2024 (W42 – 2024)

Sheet LOP

Enter a date

16 of 62

Once the hyperlink is created, click on it to open the sub folder linked to the task where will be stored the deliverables, or to open the presentation at the corresponding task slides section

Open Links menu

Select one presentation and the layout of the slide to be created

Select path of the main folder where sub-folders will be created and the folder structure template you want to copy at each creation of a new sub-folder

Create hyperlinks by double click in the specific cell

1

2

3

4

Sheet LOP

Links menu : create « hyperLinks » to ppt slides and folders

17 of 62

Open Outlook menu

Set the LOP owner to link the LOP to the Outlook session opened on your current computer

2

1

Only the LOP owner will have the ability to manage export /import of the tasks with Outlook

When the LOP is opened on a different computer, the Export and Import buttons will be disabled

This rule is set to avoid the same tasks to be duplicated in different Outlook session

2

3

3

Set options :

Assign task to Owner : if activated, tasks in outlook will be affected to the owners set in the LOP

If not, tasks stays in the outlook session of the LOP owner

Display before sending : if activated task pop-up windows in outlook will be opened , task to be sent manually then

If not, tasks pop-up windows not displayed, tasks sent automatically to the owners, if assign option activated

3

2

Sheet LOP

Outlook menu : Connect LOP to Outlook – Export/Import function

18 of 62

Sheet Teams

Add a new team or a new member in a team on the last row

1

Team Color = color assigned to the Team for stickers on Kanban board

Member Name = Name of the team member you will assign to task(s)

Mail = Mail of the team member

To->/CC->/Bcc-> = parameter for sending the minutes per mail (Main recipient / carbon copy/ Blind carbon copy)

Send Minutes? = yes or no

Visible when LOP is in Scrum mode (see slide #10)

Scrum Velocity : type : integer - manual velocity of the member to close action

Scrum Velocity calculated : type : integer - velocity calculated of the member to close actions (filled automatically)

19 of 62

Sheet Teams

Choose velocity mode

Click on the switch button to change the velocity mode

In Manual mode, burndown chart will consider for the targeted curve, the velocity of the team(s) / member(s) set manually in the column « Scrum Velocity »

In Calculated mode, burndown chart will consider for the targeted curve, the velocity of the team(s) / member(s) calculated from past tasks closed in the LOP , with the value displayed in the column « Scrum Velocity calculated »

Button « Update Velocity » 🡺 to update Velocity calculated column

20 of 62

Sheet Minutes

Click on « Update » to create the minutes

2

Select way to sort and organize your minutes

1

Minutes created

Click on « Send » button to send the minutes by email to the contacts set in the sheet « Teams »

3

21 of 62

Sheet Stickers_5Weeks

Visible when LOP mode = Due Date

22 of 62

Sheet Stickers_5Weeks

Kanban board presentation

Kanban columns where the stickers are displayed

Week number displayed as headcolumns are set automatically according date of the day

New title button to create a new title (eq. to a new section) in the LOP

Titles list : to select and filter based on Title(s) parameter

Open/Close Filter menu

Update Kanban board

Filter menu

Report delays on sticker with color

🡪 Delayed 1 time

🡪 Delayed 2 times

🡪 Delayed 3 times

🡪 Delayed more than 3 times

23 of 62

Sheet Stickers_5Weeks

Kanban board presentation

Create new sticker

Assign Team button : to change owner of a sticker

Close Task(s) : to close sticker

Cancel Task(s) : to cancel sticker

Set nb of week(s) while stickers are kept displayed on Kanban board after closure

24 of 62

Sheet Stickers_5Weeks

Create a new sticker

Click on one small colored sticker in the menu bar

3

Make sure « Assign team » , « Close Tasks » and « Cancel Tasks » buttons are inhibated ( grey color)

1

New sticker is created

Select only one Title from the list, to get the sticker created in the desired section (=Title) of the LOP

2

25 of 62

Sheet Stickers_5Weeks

Possible actions on sticker : Change Title

Click out of the sticker, in any free cell of the kanban board, to open the « New title » userform window

3

2 Options :

A: Open the list of the already existing titles and select the requested one before to click on « OK »

B: Edit new title name in the text box and then click on « OK »

Select one sticker on the Kanban board

1

Place the mouse cursor at Title level and change the title

2

A

A

B

26 of 62

Sheet Stickers_5Weeks

Possible actions on sticker : Change Action

Click out of the sticker, in any free cell of the kanban board, to get it refreshed

3

New action is then reccorded

Select one sticker on the Kanban board

1

Place the mouse cursor at the action level and change the action

2

27 of 62

Sheet Stickers_5Weeks

Possible actions on sticker : change due date

Click out of the sticker, in any free cell of the kanban board, to get it refreshed

3

New Due date is then reccorded

Select one sticker on the Kanban board

1

Move it to the desired due date column

2

28 of 62

Sheet Stickers_5Weeks

Possible actions on sticker create a sub task

Select one sticker on the Kanban board

1

Click on the « + » to add a sub-task

2

Edit sub task

Add a new sub task

Close sub task

Delete sub task

29 of 62

Sheet Stickers_5Weeks

Possible actions on sticker : Add a comment

Select one sticker on the Kanban board

1

Click on the to display and add a comment to the task

2

Add a comment

Click on « Set as Top priority » will change speech bubble form into a warning sign

3

Click out of the sticker, in any free cell of the kanban board, to get it refreshed

4

Dash in the speech bubble form indicates thenpresence of a comment associated to the task

Entering in the form will add a prefix corresponding to the date of the day

Warning sign is displayed for a top priority task

30 of 62

Click on the sticker(s) or the sub-task(s) you want to assign to Design Team / Thierry

3

Click on « Assign team »

Make sure « Close Tasks » and « Cancel Tasks » buttons are inhibated ( grey color)

1

Select the team’s color and the owner you want to assign to task(s) – eg. Design& Thierry

2

Sheet Stickers_5Weeks

Possible actions on sticker : Change Owner

31 of 62

Click on the sticker(s) you want to Close / Cancel

2

Sheet Stickers_5Weeks

Close or Cancel sticker(s)

Selected sticker(s) will be crossed out

Click out of the sticker, in any free cell of the kanban board, to reccord your changes

Closed stiker(s) will then move to the « Done » or « Canceled » column

3

Click on « Close task(s)» or Cancel task(s) to activate the function

Lignt green color = function is activated

1

32 of 62

Sheet Stickers_5Weeks

Open sticker properties window

Select one sticker or one sub-task and press <<F2>> to open the properties window

1

<< F2 >>

Fill/Change the properties of the Sticker

Click on « Ok » to save your updates

2

A

C

B

A: Create hyperlink to a presentation - see slide create hyperLinks to ppt slides and folders

B: Create hyperlink to a folder- see slide create hyperLinks to ppt slides and folders

C: Go to the LOP table at the corresponding task ID#

33 of 62

Sheet Stickers_5Weeks

Change sticker size parameters

Click on Parameters

1

Update Sticker size parameters

2

Click on « Ok » to reccord your changes

3

34 of 62

Sheet Sticker_Status

Visible when LOP mode = Sprint

35 of 62

Sheet Sticker_Status

Kanban board presentation

Kanban columns where the stickers are displayed

Week number displayed as headcolumns are set automatically according date of the day

New title button to create a new title (eq. to a new section) in the LOP

Titles list : to select and filter based on Title(s) parameter

Open/Close Filter menu

Update Kanban board

Filter menu

Report delays on sticker with color

🡪 Delayed 1 time

🡪 Delayed 2 times

🡪 Delayed 3 times

🡪 Delayed more than 3 times

36 of 62

Sheet Sticker_Status

Kanban board presentation

Create new sticker

Assign Team button : to change owner of a sticker

Close Task(s) : to close sticker

Cancel Task(s) : to cancel sticker

Set nb of week(s) while stickers are kept displayed on Kanban board after closure

SPRINT modes

Manual mode : Choose & select sprint to be displayed manually

Automatic mode : Current sprint with sticker in late only displayed

Move sticker to sprint +1

37 of 62

Sheet Stickers_Status

Create a new sticker

Click on one small colored sticker in the menu bar

3

Make sure « Assign team » , « Close Tasks » and « Cancel Tasks » buttons are inhibated (grey color)

1

New sticker is created

Select only one Title from the list, to get the sticker created in the desired section (=Title) of the LOP

2

38 of 62

Sheet Stickers_Status

Possible actions on sticker : Change Title

Click out of the sticker, in any free cell of the kanban board, to open the « New title » userform window

3

2 Options :

A: Open the list of the already existing titles and select the requested one before to click on « OK »

B: Edit new title name in the text box and then click on « OK »

Select one sticker on the Kanban board

1

Place the mouse cursor at Title level and change the title

2

A

A

B

39 of 62

Sheet Stickers_Status

Possible actions on sticker : Change Action

Click out of the sticker, in any free cell of the kanban board, to get it refreshed

3

New action is then reccorded

Select one sticker on the Kanban board

1

Place the mouse cursor at the action level and change the action

2

40 of 62

Sheet Stickers_Status

Possible actions on sticker : change Status

Click out of the sticker, in any free cell of the kanban board, to get it refreshed

3

New Status (ie. Doing) is then reccorded

Select one sticker on the Kanban board

1

Move it to the desired Status column

2

41 of 62

Sheet Stickers_Status

Possible actions on sticker create a sub task

Select one sticker on the Kanban board

1

Click on the « + » to add a sub-task

2

Edit sub task

Add a new sub task

Close sub task

Delete sub task

42 of 62

Sheet Stickers_Status

Possible actions on sticker : Add a comment

Select one sticker on the Kanban board

1

Click on the to display and add a comment to the task

2

Add a comment

Click on « Set as Top priority » will change speech bubble form into a warning sign

3

Click out of the sticker, in any free cell of the kanban board, to get it refreshed

4

Dash in the speech bubble form indicates the presence of a comment associated to the task

Entering in the form will add a prefix corresponding to the date of the day

Warning sign is displayed for a top priority task

43 of 62

Click on the sticker(s) or the sub-task(s) you want to assign to Design Team / Thierry

3

Click on « Assign team »

Make sure « Close Tasks » and « Cancel Tasks » buttons are inhibated ( grey color)

1

Select the team’s color and the owner you want to assign to task(s) – eg. Design& Thierry

2

Sheet Stickers_Status

Possible actions on sticker : Change Owner

44 of 62

Click on the sticker(s) you want to move to the next sprint ( ie. Sprint #7)

2

Click on « Move to sprint +1»

1

Sheet Stickers_Status

Move sticker(s) to the next sprint

Selected sticker(s) have black dashed outline

Click out of the sticker, in any free cell of the kanban board, to reccord your changes

3

45 of 62

Click on the sticker(s) you want to Close / Cancel

2

Sheet Stickers_Status

Close or Cancel sticker(s)

Selected sticker(s) will be crossed out

Click out of the sticker, in any free cell of the kanban board, to reccord your changes

Closed stiker(s) will then move to the « Done » or « Canceled » column

3

Click on « Close task(s)» or Cancel task(s) to activate the function

Lignt green color = function is activated

1

46 of 62

Sheet Stickers_Status

Open sticker properties window

Select one sticker or one sub-task and press <<F2>> to open the properties window

1

<< F2 >>

Fill/Change the properties of the Sticker

Click on « Ok » to save your updates

2

A

C

B

A: Create hyperlink to a presentation - see slide create hyperLinks to ppt slides and folders

B: Create hyperlink to a folder- see slide create hyperLinks to ppt slides and folders

C: Go to the LOP table at the corresponding task ID#

47 of 62

Sheet Stickers_Status

Change stickers size parameter

Click on Parameters

1

<< F2 >>

Update Sticker size parameters

2

Click on « Ok » to reccord your changes

3

48 of 62

Sheet Planning Poker

Visible when LOP mode = Sprint and planning poker is activated

49 of 62

Sheet Planning Poker

Visible when LOP mode = Sprint and planning poker is activated

« Refresh » to update the Burndown chart

To be done after any changes on filters parameters

Actual sprint information

Filters

Sprints / Teams / Owner

Burndown chart is providing the following information :

  • Project should end after 9 Sprints
  • Actual progress after 6 Sprints is reporting a delay of 5 Story points compared to the target

50 of 62

Sheet Timing

To Draw timings

Red doted bar position is automatic and highlights the actual date

51 of 62

Set start date and end date of the project

to set automatically the timescale

Example :

Change end date from 30/09/2025 to “25/10/2025

will pursue the timescale automatically up to W44

Month & Weeks are selected

🡺 1 column = 1 week

Months selected only

🡺 1 column = 1 month

Working days or week days selected

🡺 1 column = 1 day

Sheet Timing

Set scale of the timing

Set scale of one column in the timing

Define timescale of one column:

Months/Week number/ day number/ working days number

52 of 62

Will keep only months on the timescale

And will reduce columns width to a minimum

Will screen week number

Thin for small columns width

Large for bigger columns width

Will screen dates of the days on the scale

🡪 Date of the 1st day of the week /Month

Thin for small columns width

Large for bigger columns width

Select a view to zoom in / zoom out on the timescale and screen Month/week number/days

It will keep 1 column as 1 week as set in the timescale definition

Sheet Timing

Set view for the scale of the timing

Example with the scale definition 1 column =1 week

53 of 62

Define your timing using predefined short cuts keyboard to color the cells in particular color

Defined short cuts keyboard

Enter « p » in cells will color them in blue

You can change the color of the cell to personnalize the short cut keyboard

Close complete columns entering « o »

or « » to re-open the column

Sheet Timing

Set timing with short cuts keyboard

54 of 62

Show duration and predecessors columns

1

Set Durations (in number of columns) of each task and its predecessors

2

Predecessors shall be set according the following rules :

  • Predecessors are identified by the row of the tasks
  • Predecessors shall be set as a list separated by « ; » Example : ;5;8;9;
    • The task will start after all predecessors are finished
    • Set « ;5+2 » to shift the start of the task by 2 columns after the end of the task ID#5

Macro will convert your entry ;5+2 by a formula to not loose predecessor setting when a row is inserted/ deleted

Draw the timing by entering :

« >> » to start the timing from this point in a mode as early as possible

« << » to  end the timing at this point and draw the predecessors in a mode as late as possible

NB: Off days – or complete off columns will be jumped

3

Sheet Timing

Set timing with duration and predecessors method

55 of 62

Open Baseline menu

1

Reccord Baseline : to reccord the baseline of the actual timing

2

Baseline to be reccorded

Select the baseline reccord in the list

3

Show baseline

to screen the baseline on the timing

4

Baseline is represented by greyed cells or black underlined cells

Here in the example >> Design specification activity delayed by 2 weeks in wk50 & 51

Sheet Timing

Use baseline function to track changes in timing

56 of 62

Group some tasks in one row timeline entering « G » in the first column named « ? »

1

2: Enter « G » to set the start of the tasks group where will be summarized the tasks

3: Enter « S » to set the end of the tasks group to be summarized

4: Set a specific color to highlight the corresponding task in the first row timeline

Set your free text like « PO » to short name the task in the timeline

Update the first row timeline by recalculating the « G » cell

Result

2

3

4

Sheet Timing

The first column function « G »  Group  « S » Stop

Group tasks on one row with a timeline bar

57 of 62

Set a « M » to declare the row as a row dedicated to milestones

1

Each entry in a cell of a row defined as milestone will set a vertical bar on the timing

Vertical bar will have the color of the cell « M »

Sheet Timing

The first column function « M »  Milestones

Set milestones with vertical bars

58 of 62

Timing example with a « G »line created

Show ressources

1

Sheet Timing

The first column function « R »  Ressources

Use the ressources' function

59 of 62

Add ressources in the top section opened and name them

2

Add New « R » lines below the « G » line and name the ressources with the same name than the ones defined in the top section

3

Top section

Sheet Timing

The first column function « R »  Ressources

Use the ressources' function

60 of 62

4

Set quantity of hours required for each ressource vs. each task in the ressources columns

Recalculate the cell « R » with F2 + Enter

5

4

5

Result

Hours added according timing of the tasks

Sum

Ressources columns

Sheet Timing

The first column function « R »  Ressources

Use the ressources' function

61 of 62

Sheets « Graph Ressources »

For analysis of ressource’s workload

1

Clic on « Refresh » to update values from timing for the dynamical chart

62 of 62

Sheet Calendar