PROJECT
PROPOSAL
TEAM #4
Linda Odhiambo
Lahari Yelubolu
Anto Ovid G S
SCHEDULE OPTIMIZATION - SYNCHRO PRO
Underground electric systems were changed on time of construction leading to a huge scope change. These are some example of uncertain events that effects upcoming weeks schedule. (Currently they work in P6 that generates only one scenario)
MATERIAL AND EQUIPMENT TRACKING - SYNCHRO PRO
(Currently no tools are used in this project site to track equipment, material along the timeline of the project).
PROPOSED SYNCHRO PRO - WORKFLOWS
EXISTING WORKFLOW
PROPOSED WORKFLOW
3D modeling
clash detection
3D modeling
clash detection
4D modeling
model based scheduling
accessing data
3D modeling
clash detection
accessing data
iTwin – Synchro – Unreal 5 Workflow:
4D model
4D + iTwin
visualization for owner
ASSEMBLE DATA EXPORTER
(Currently the model published in assemble with lots of important data is not used to its potential)
Stage 2 -> Add/ Edit properties of 3D model by importing data
from Excel to Revit
GENERATIVE DESIGN FOR MEP - REFINERY
Alternative : GenMEP (Commercial)
IMMERSIVE TECHNOLOGY – MR (UNITY/UNREAL 5 – HOLOLENS)
Alternative : Trimble XR10 Hololens
BLENDERBIM
PILOTING - CMBUILDER
About:
Our supervisor (Adam Weis) from the current project at DPR is assigned to pilot and test the tool.
Pros: 3D Parametric modeling, 4D Simulation, Quantity takeoff, Markups and reviews
Cons: License cost per number of projects, interoperability.
Status: Working on it to see the use case in the assigned project.
ADD-ONS [REVIT PLUGINS]: