Small-scale rural domestic wastewater treatment project��“Sewage Treatment Technology of
Ecological Compound Microcirculation (ECM) ”�
Ziyuan Feng (Senior Engineer)
Guangzhou City Vetiver Ecology Science and Technology Co. Ltd.
www.gz-xgst.com
Introduction
Introduction of “Sewage Treatment Technology of Ecological Compound Microcirculation ”
Introduction of “Sewage Treatment Technology of Ecological Compound Microcirculation ”
Characteristics of “Sewage Treatment Technology of Ecological Compound Microcirculation ”
Qualities of “Sewage Treatment Technology of Ecological Compound Microcirculation ”
6. Ecological and environmental friendship: a combination of a variety of plants and recycling use of wastes with ecological and environmental effect;
7. The technology operates in a fully automated manner.
8. The technology has a low average annual maintenance cost, requiring only 5,000 to 8,000 Chinese yuan per one hundred cubic meters.
9. With appropriate management, it is possible to cultivate vetiver seedlings and create additional economic benefit.
Flow Chart of �“Sewage Treatment Technology of Ecological Compound Microcirculation ”
Settling
Pond
Biochemical
Reaction
tank
Natural
wetland pond
Vetiver filter
tank
Soil
surface recirculation
Ecological rurality system
Fish pond
Sewage
Regular removal
of debris
Standard-achieved
discharge
The following is a brief introduction of each part in this system
Characteristics of “Biochemical Reaction System”
Functions of “Constructed Wetland Pond”
Functions of “Vetiver Filter Tank”
Functions of Surface Water Recirculation
and Infiltration
Comparison with Traditional Scheme
Representative company | Unpowered anaerobic �wetland technology | Traditional digester technology scheme | Membrane �Bio-Reactor | A20 oxidation technical scheme | ECM Technology |
Technical representative | A number of small enterprises | Traditional �enterprises | Beijing Capital Group | China Union Engineering Company | Guangzhou Vetiver Ecological Company |
Land area (m2) | 200-500 | 500-1000 | 20-200 | 100-300 | 40-100 |
Supporting design | None | None | Power plant | Greenery landscape | Ecological complex landscape |
Space usage | Surface-based | Surface-based | Surface-based | Subsurface | Subsurface |
Wastewater treatment capacity | Low | Grade B | Grade A | Grade A | Grade A |
Secondary pollutant | Yes | Yes | No | No | No |
Landscape effect | Small | Small | None | Obvious | Remarkable |
Lifespan | 3-5 years | 5-8 years | 10-15 years | 10-15 years | More than 20 years |
Construction cost� (Per family) | ¥2000-4000 | ¥3000-5000 | ¥4000-6000 | ¥10,000-15,000 | ¥8000-1,2000 |
Energy cost�(Per ton) | None | None | 2-3 kilowatt | 1-1.2 kilowatt | 0.03-0.05 kilowatt |
Operating cost�(Per ton) | None | None | ¥1-1.5 | ¥0.5-0.6 | ¥0.02-0.03 |
Maintenance cost�(Per year) | ¥10,000-20,000�(Wetland pipeline cleaning) | ¥8,000-15,000�(Plant and silt cleaning) | ¥15,000-40,000�(Plant and silt cleaning) | ¥10,000-20,000�(Membrane replacement) | ¥3,000-5,000�(Plant cleaning) |
A wastewater treatment case in Caixin Village
Examples of wastewater treatment
Biochemical reaction tank construction
Construction of wetland ponds and vetiver filtration pools
Vetiver seedlings transplanted to floating island
Installation of the equipment for biochemical reaction
�Installation of wind and solar �power supply systems
Fully automated intelligent control system
Placement of microbial agent into biochemical reaction tank for testing
The main system after completing construction
One part of the view after project completion
The other part of the view after project completion
Artificial wetland system
Floated vetiver filtering system
Zhenning Dingqi Town Ma'an shan Wastewater Treatment
The ongoing construction site
The overall appearance of the project
The landscape after 5 months of operation
Vegetation system utilizing river channel construction (no land occupation)
Wastewater containing animal and plant oils
Aerobic process in biochemical reaction pool
Water quality after 5 months of treatment
——Xixiu District Jichang Township Qixin Resettlement Community Wastewater Treatment Project�
Small-scale and simple landscape design
Decoration using the tire crafts
Rainwater and wastewater separation
Vetiver starts to take effect after �two months planting
——Pingba Baiyun Feihu Mountain Wastewater Treatment Project
Photo of the construction in progress
Photo of the site 70 days after project completion
�Integration of landscape with� local culture
On-site inspection by �local leaders in China
Photo of vetiver grass root systems after more than 90 days of growth
——Puding Xiushui Niujiao Group Wastewater Treatment Project
A picture of the completion of construction�
——Puding Xiushui Baobao Group Wastewater Treatment Project
Vetiver floating island designed by the local landform
——Wastewater Treatment Project in Dongtun
A small but functional �treatment station
�Visit led by Jiapei Huang, Vice Governor� of Guizhou Province
Xiaoqi Jin, director of Forestry Bureau of Guizhou Province was listening to the introduction of the project (8 March 2016)
�Ministry of Agriculture leaders visit Dingqi project
Yuan Xiong, leader of Anshun was �on site inspection
�Ministry of Agriculture leaders visited
the wastewater treat system
Zhihong Zhang, Director of Department of Ecology and Energy, Guizhou Provincial Agricultural Commission�was on site inspection �(24 March 2016)
�Director Lu Hai from the Guiyang Environmental Protection Station led a team to visit the project�(June 8, 2016)
Professor Xia Hanping, an international expert in patchouli grass from the South China Botanical Garden, Chinese Academy of Sciences, visited the Dingqi project site
Canadian ecological expert visited the site for investigation
Certificate issued by the Vetiver Network International �
Technical Group of Guangzhou Vetiver Grass Industry Science and Technology Co. Ltd.
Email: fengziyuan@163.com
Phone number:
(+86)13112203258
We hope to have further cooperation with you !