Nuvolo & ServiceNow Introduction
Make Reservations and Wayfinding Messaging
Nuvolo Project
Project Description
System
2
Prime Directive:
ServiceNow will provide employees two new functions:
Project Specifications
What problems will this solve?
Benefits
Better space utilization – going from me to we
Increased flexibility and mobility of the workforce in the digital-first workplace
Improved safety protocols
Increased productivity by simplifying logistics
Target Audience
Currently, NB and AV will be the target locations we expect to use these applications and features most but all employees will have access
Needs and Expectations
Learning curve with a new system creates hesitancy to change
Training/Comms must be simplified and present the applications as smart, easy and responsive to the user.
Has to work the first time when employees access it – images, locations, people searches, Outlook integration
Communications
Campaign will include Workplace+ channels, Splash, newsletters, townhalls, videos, meetings
We need to have leadership and networks champion this change.
Strengths and Assets
Renovation will pull users to SEEK the rooms before they book and FIND coworkers hoteling in cubicles.
Applications are embedded in an already existing site
Metrics
Employee usage reports
Feedback from surveys
Better space utilization – going from me to we
Increased flexibility and mobility of the workforce in the digital-first workplace
Improved safety protocols
Increased productivity by simplifying logistics
Employee usage reports
Feedback from surveys
At this time NB and AV will be the main target locations we expect to use these applications and features most but all employees and all work modes will have access
Learning curve with a new system creates hesitancy to change
Training/Comms must be simplified and present applications as smart, easy and responsive to the user
Has to work the first time when employees access it – images, locations, people searches, Outlook integration
Robust campaign will include Workplace+ channels, Splash, newsletters, townhalls, videos, meetings
We need to have the support of leadership and networks champion this change
Renovation will pull users to seek the rooms before they book and find coworkers hoteling in cubicles.
Applications are embedded in an already existing data systems
Metrics
Benefits
Target
Audience
Needs
Comms
Strengths
& Assets
Employees and visitors struggle with locating conference rooms and orientation
Tracking and finding hoteling employees in the hybrid workplace
Maximize cleaning services through used vs. unused spaces
Change Objectives
What’s changing?
The way we reserve spaces and find people.
Why are we changing?
We need a way to find people and navigate the office more efficiently to match the needs of a hybrid workplace.
What does change look like?
This change is about how employees access an everyday resource – reserving spaces and finding employees. This will require them to start from a new link, completing a new process to do a familiar task and connecting to the workplace through new digital tools instead of Outlook.
When are we changing?
Employees will be able to access the apps on devices and PCs by September 30, 2021. Kiosk TBD depending on sourcing delivery of the equipment.
Reservations & Wayfinding Capabilities
Action | Reservations | Outlook |
Reserve Hotel Space | ✔ | X (not currently) |
Reserve Conference Room | ✔ | ✔ |
Search Person, Place or Thing (get more specific) | ✔ (?) | ✔(?) |
Space Details (Image, Capacity, Location, Availability) | ✔ | X |
Request Services | ✔ | X |
Email Notification to Janitorial Services | ✔ | X (manual process) |
Make a Private Reservation (no name) | ✔ | X |
Map View | ✔ | X |
Calendar and Card View | ✔ | ✔ |
Reservation History, Upcoming, and Past | ✔ | ✔ |
Check in / Check out | ✔ | ✔ |
Space Filters (Date, Time, Capability, Services) | ✔ | X |
Search by Location Number and Conference Name | ✔ | X (?) |
Visibility to Reservable spaces | ✔ | X |
Reservations Methods (Work mode: Hybrid)
Outlook
Schedule Conference Room
Locate Conference Room
Add Participant(s)
Reserve
No Services Required
*Services Required
Make Reservations
Schedule Conference Room
View Map or Calendar for Available Space
Select Services Needed
Reserve
Task: Reserve Hotel Space
Outlook
NOT AVAILABLE
Make Reservations
View Map or Calendar for Available Space
Select the Space
Reserve
Email Notification to Service teams
*Only available for Conference Room
Requestor
Requestor
Task: Reserve Conference Room
Outlook
Attach Virtual Meeting Link
Add Participant(s)
Reserve
Make Reservations
View Map or Calendar for Available Space
Select the Space/Services
Reserve
Virtual
*Visiting Campus w/ or w/o Services
*Only available for Conference or Office Space
Reservations Methods (Work mode: Remote)
Outlook
NOT AVAILABLE
Make Reservations
View Map or Calendar for Available Space
Select the Space
Reserve
Requestor
Requestor
Task: Reserve Conference Room
Task: Reserve Hotel Space
Communication and engagement channels
Feedback &
Measurements
Two-way Feedback
Communication Measurements
A
D
K
A
R
Awareness & Desire
Knowledge
Ability
Communication Channels
Reinforcement
Make Reservations Core Messages
Wayfinding Core Messages
Timeline
| August | September | October | ||||||||
� | Week 1 1-7 | Week 2 8-14 | Week 3 15-21 | Week 4 22-28 | Week 1 8/22-9/4 | Week 2 5-11 | Week 3 12-18 | Week 4 19-25 | Week 1 9/26-10/2 | Week 2 3-9 | Week 2 10-16 |
OCM Communications | | | | | | | | | | | |
Training | | | | | | | | | | | |
Project | | | | | | | | | | | |
Deliverable / Milestone
Meeting
Release 1 UAT (8/1)
Map Update: furniture change (8/15)
Release 2 Map update (8/10)
Release 1 Launch – facilities only (8/13)
Outlook integration (8/15)
Release 2 UAT (9/15) (40+ users; includes mobile)
Release 2 Launch All Employees (9/30)
Release 3 (TBD)
Release 1 Training Dev Begins (8/13)
Confirm core messages (8/14)
Release 2 Training Dev Begins (9/3)
Training on Hub (9/27)
Training Videos on Hub (10/4)
Comm plan/timeline (8/20)
Splash blast (9/30)
Training Video highlight on Splash (10/4)
OCM/Trn Meeting for Alignment (8/11)
OCM/Trn Meeting for Alignment (8/25)
OCM/Trn Meeting for Alignment (9/15)
OCM/Trn/Proj Meeting for Alignment (9/29)
OCM/Trn/Proj Meeting for Alignment (10/6)
Materials creation and approvals Release 2 UAT (8/22)
CCN Monthly Meeting (9/16)
CAN Monthly Meeting��
CAN Monthly Meeting��
CAN Monthly Meeting��
OCM/Trn/Proj Meeting for Alignment (8/13)
OCM/Trn/Proj Meeting for Alignment (TBD)
OCM/Trn/Proj Meeting for Alignment (TBD)
OCM/Trn/Proj Meeting for Alignment (TBD)
OCM/Trn/Proj Meeting for Alignment (TBD)
OCM/Trn/Proj Meeting for Alignment (TBD)
OCM/Trn Meeting for Alignment (9/8)
OCM/Trn Meeting for Alignment (9/22)