1 of 77

Bedford Hills ES – Bedford Village ES – Mount Kisco ES – Pound Ridge ES – West Patent ES – Fox Lane MS – Fox Lane HS

BEDFORD CENTRAL SCHOOL DISTRICT

“Inspiring and Challenging Our Students”

Potential Spring 2022 Bond Referendum & Master Plan Update

January 26, 2022

DRAFT

01-26-22

2 of 77

Bedford Central School District January 26, 2022

Air Conditioning

Master Planning

Air conditioning within the District came up in discussion at the December 15, 2021 BOE Meeting. Some air conditioning work has already been included within the suggested infrastructure work for a Spring 2022 Bond; other work could be considered.

DRAFT

01-26-22

3 of 77

Potential Air Conditioning Projects

Bedford Hills Elementary $ 189,230

Mount Kisco Elementary $ 533,400

Fox Lane Middle School $ 450,000

Fox Lane High School $ 6,327,800

Note: There is air conditioning work included within $24.9M Infrastructure Work Reviewed 12-15-21 Total for Pound Ridge and

West Patent, not included within $7.5M listed on this slide.

Subtotal of Reviewed Work Scope

( DRAFT: not yet proposed )

$ 7,500,430

DRAFT

01-26-22

4 of 77

Potential Spring 2022 Bond Reviewed Projects

District-Wide Infrastructure Projects $ 24,893,777 12-15-21

MS New Stairs & Connecting Corridors $ 11,022,200 12-15-21

MS Courtyard & Outdoor Gym Improvements $ 2,610,200 12-15-21

MS Central Building Improvements $ 8,270,500 12-15-21

MS Houses Reconstruction $ 7,474,600 12-15-21

MS Wellness, Fitness, Library & Dining $ 4,683,125 12-15-21

HS Library, Cafeteria, Guidance & Art Offices $ 16,760,000 12-15-21

HS STEM, Gallery & Fitness/ Wellness $ 8,940,000 12-15-21

Fox Lane Campus Athletics $ 15,003,205 12-15-21

Air Conditioning $ 7,500,430 Extended Master Plan Review

Additionally Reviewed non-Priority 1 BCS Items $ Future + + + Extended Master Plan Review

Other Potential Projects to Review $ Future + + + Extended Master Plan Review

$ 70,000,000

Bond Counsel for the District has advised that the development of a Spring 2022 Bond Referendum up to approximately $70M would not impact the tax levy.

$ 107,158,037

$ 99,657,607

Additional discussion at the 12-15-21 Board of Education Meeting brought back air conditioning as a thought for consideration;

Master Planning work scope will continue to evolve and develop into the future.

DRAFT

01-26-22

5 of 77

Part 2 Potential Spring 2022 Bond Timeline

Part 3 BCS & Infrastructure Projects

Part 4 Learning Environments

Part 5b Fox Lane High School

Part 6 Elementary Schools

Part 8 Potential Spring 2022 Bond Referendum

Part 1 Master Plan: Vision & Facilities

Part 7 Master Planning & Next Steps

DRAFT

01-26-22

6 of 77

Bedford Central School District January 26, 2022

Fox Lane High School

DRAFT

01-26-22

7 of 77

Classroom Sections

Support Classrooms

Administration, Nurse, Faculty

Core & Special Dedicated Spaces

3rd Floor

1st Floor

2nd Floor

DRAFT

01-26-22

8 of 77

Inspiration

Imagery

HS Learning Environments

DRAFT

01-26-22

9 of 77

Traditional School Design

“Double-Loaded” Corridor

Conceptual Diagram of a more Traditional Approach

to (K-12) Educational Design (“Boxes” of Spaces)

DRAFT

01-26-22

10 of 77

‘Decompartmentalization’

of the Student Experience

Conceptual Diagram of a New Approach

to (K-12) Educational Design (“Exchange” of Spaces)

DRAFT

01-26-22

11 of 77

Learning Environment Design

DRAFT

01-26-22

12 of 77

Learning Environment Design

DRAFT

01-26-22

13 of 77

Learning Environment Design – Completed Suffolk County HS Project

DRAFT

01-26-22

14 of 77

Learning Environment Design – Completed Nassau County HS Project

DRAFT

01-26-22

15 of 77

Learning Environment Design – Current Westchester County HS Project

DRAFT

01-26-22

16 of 77

Learning Environment Design – Current Westchester County HS Project

DRAFT

01-26-22

17 of 77

Learning Environment Design – Current Westchester County HS Project

DRAFT

01-26-22

18 of 77

Learning Environment Design – Current Westchester County HS Project

DRAFT

01-26-22

19 of 77

Conceptual Plans:

Fox Lane High School

HS Learning Environments

DRAFT

01-26-22

20 of 77

DRAFT

01-26-22

21 of 77

DRAFT

01-26-22

22 of 77

DRAFT

01-26-22

23 of 77

Science

Academics

Academics

Arts

Arts

STEAM

P.E.

Student

Learning

Exchange

Wellness

DRAFT

01-26-22

24 of 77

$25.7M

  • Student Learning Exchange at Current Library, Dining, Guidance, Art Offices, Gallery & Connecting Corridors
  • New Addition for SLE & Guidance
  • Site Work, Gardens & Misc.
  • Renovate Small Gym to Wellness & Fitness
  • Renovate Locker Rooms, Trainer & Storage
  • New STEAM & Gallery @ Courtyard

Fox Lane HS

Interior Reconstruction

Color Key:

New Construction

First Floor Plan Diagram

DRAFT

01-26-22

25 of 77

CURRENT PROGRAM AREAS

Library 9,884 SF

Large Cafeteria 3,619 SF

Small Cafeteria 2,381 SF

Guidance & Faculty Office 3,944 SF

Gallery 539 SF

Student Commons 6,023 SF

Small Gym 3,813 SF

30,203 SF

DRAFT

01-26-22

26 of 77

CURRENT PROGRAM AREAS

Library 9,884 SF

Library Mezzanine 929 SF

Large Cafeteria 3,619 SF

Small Cafeteria 2,381 SF

Guidance & Faculty Office 3,944 SF

Gallery 539 SF

Student Commons 6,023 SF

Small Gym 3,813 SF

OVERALL 31,159 SF

POTENTIAL PROGRAM AREAS

Library/ Learning Exchange 8,189 SF

Ellipse/ Exchange 626 SF

Conference Room/ Exchange 454 SF

Dining/ Learning Exchange 3,980 SF

Dining/ Learning Exchange 2,799 SF

Guidance & Faculty/ Exchange 5,113 SF

Gallery/ Exchange 837 SF

Student Commons/ Exchange 12,977 SF

Wellness/ Fitness/ Exchange 3,576 SF

Engineering/ STEAM/ Exchange 1,601 SF

OVERALL 40,152 SF

DRAFT

01-26-22

27 of 77

Conceptual Renderings:

Fox Lane High School

HS Learning Environments

DRAFT

01-26-22

28 of 77

Current Photo of Library @ Upper Windows & Mezzanine

DRAFT

01-26-22

29 of 77

Current Rendered View of Library @ Upper Windows & Mezzanine

DRAFT

01-26-22

30 of 77

Potential Rendered View of Library @ Upper Windows - No Mezzanine

DRAFT

01-26-22

31 of 77

Current Photo of Library @ Lower Windows

DRAFT

01-26-22

32 of 77

Current Rendered View of Library @ Lower Windows

DRAFT

01-26-22

33 of 77

Potential Rendered View of Library @ Lower Windows

DRAFT

01-26-22

34 of 77

Current Photo of Library @ Mezzanine

DRAFT

01-26-22

35 of 77

Current Rendered View of Library @ Mezzanine

DRAFT

01-26-22

36 of 77

Potential Rendered View of Library without Mezzanine

DRAFT

01-26-22

37 of 77

Current Photo of Library underneath Mezzanine

DRAFT

01-26-22

38 of 77

Current Rendered View of Library underneath Mezzanine

DRAFT

01-26-22

39 of 77

Potential Rendered View of Library without Mezzanine

DRAFT

01-26-22

40 of 77

Current Photo of Library between Mezzanine & Guidance

DRAFT

01-26-22

41 of 77

Current Rendered View of Library between Mezzanine & Guidance

DRAFT

01-26-22

42 of 77

Potential Rendered View of Library & Guidance (no Mezzanine)

DRAFT

01-26-22

43 of 77

Current Photo in Library under Mezzanine Stair

DRAFT

01-26-22

44 of 77

Current Rendered View in Library under Mezzanine Stair

DRAFT

01-26-22

45 of 77

Potential Rendered View in Library without Mezzanine

DRAFT

01-26-22

46 of 77

Current Photo of Entry into Small Cafeteria

DRAFT

01-26-22

47 of 77

Current Rendered View of Entry into Small Cafeteria

DRAFT

01-26-22

48 of 77

Potential Rendered View of Entry into Student Dining/ Exchange

DRAFT

01-26-22

49 of 77

Current Photo of Entry into Large Cafeteria

DRAFT

01-26-22

50 of 77

Current Rendered View of Entry to Large Cafeteria

DRAFT

01-26-22

51 of 77

Potential Rendered View of Entry into Student Dining/ Exchange

DRAFT

01-26-22

52 of 77

Conceptual Renderings:

Fox Lane High School

HS Learning Environments

DRAFT

01-26-22

53 of 77

Current

Potential

DRAFT

01-26-22

54 of 77

Cafeterias to the Right

Current Main Corridor

Library to the Left

Commons Beyond

DRAFT

01-26-22

55 of 77

Potential Occupied Main Corridor

Library & Exchange to the Left

Commons Beyond

Dining & Exchange to the Right

DRAFT

01-26-22

56 of 77

Potential Occupied Main Corridor

Library & Exchange to the Left

CURRENT HALLWAY LOCATION

This area currently

in the “back” of the library

Dining & Exchange to the Right

Commons Beyond

DRAFT

01-26-22

57 of 77

Current view of first floor.

Kitchen

Auditorium

Guidance

Small Gym

Library

Large Cafeteria

Small Cafeteria

Courtyard

Gallery

DRAFT

01-26-22

58 of 77

Proposed view of Student Learning Exchange (SLE) at first floor.

Kitchen

Auditorium

SLE

DRAFT

01-26-22

59 of 77

Current view of first floor.

Large Cafeteria

Kitchen

Commons

Small Gym

Small Cafeteria

Auditorium

Courtyard

Gallery

Library

Guidance

DRAFT

01-26-22

60 of 77

Kitchen

Auditorium

Proposed view of Student Learning Exchange (SLE) at first floor.

Fitness/

Wellness

SLE

STEAM

Commons

Gallery

DRAFT

01-26-22

61 of 77

Potential

DRAFT

01-26-22

62 of 77

Potential

DRAFT

01-26-22

63 of 77

Potential

DRAFT

01-26-22

64 of 77

Potential

DRAFT

01-26-22

65 of 77

Potential

DRAFT

01-26-22

66 of 77

Potential

DRAFT

01-26-22

67 of 77

Potential

DRAFT

01-26-22

68 of 77

Potential from Main Entry; Library to left; Dining to right

DRAFT

01-26-22

69 of 77

Potential View of Library Entrance to right; Dining to left

DRAFT

01-26-22

70 of 77

Potential View within Library looking towards Dining

DRAFT

01-26-22

71 of 77

Potential View in Main Hallway; Guidance to left; Dining to right

DRAFT

01-26-22

72 of 77

Potential View of New Gallery straight ahead

DRAFT

01-26-22

73 of 77

Potential View of Widened Access to Student Commons to left

DRAFT

01-26-22

74 of 77

Potential View of Wellness/Fitness to left; STEAM to right

DRAFT

01-26-22

75 of 77

Conceptual Video:

Current & Potential

Fox Lane High School

HS Learning Environments

DRAFT

01-26-22

76 of 77

Cost Components by Area

A Library, Cafeterias, Guidance, Art Offices & Connectors (Interior Reconstruction)

$ 14,200,000

B New Guidance/ Offices (New Construction)

$ 2,560,000

C Site Work, Gardens & Misc.

$ 500,000

D Renovate Small Gym to Wellness & Fitness (Interior Reconstruction)

$ 1,140,000

E Renovate Locker Rooms,Trainer & Adjacent Storage (Interior Reconstruction)

$ 4,800,000

F New STEAM Classroom & Gallery @ Courtyard (New Construction)

$ 2,500,000

Overall

$ 25,700,000

B

D

A

F

C

E

C

E

F

DRAFT

01-26-22

77 of 77

Bedford Hills ES – Bedford Village ES – Mount Kisco ES – Pound Ridge ES – West Patent ES – Fox Lane MS – Fox Lane HS

BEDFORD CENTRAL SCHOOL DISTRICT

“Inspiring and Challenging Our Students”

Potential Spring 2022 Bond Referendum & Master Plan Update

January 26, 2022

DRAFT

01-26-22