1 of 14

EV Charging

The Vaux

2335 NW Raleigh Street 2350 NW Savier Street

Portland, OR 97210 Portland, OR 97210

www.thevaux.com

2 of 14

  • 144 Condominiums
  • 175 Parking Spaces
  • 2 Buildings
  • 4 Elevators
  • 176,586 SF
  • Year Built: 2006

2

Square Footage Summary

Raleigh

Savier

Total

%

Unit SF

73,512

74,330

147,842

84%

Common Area Buildings SF

14,182

14,562

28,744

16%

Total Square Feet

87,694

88,828

176,586

100%

Recap

Total SF

176,586

Units - Total

144

Parking Spaces - Total

175

Parking Area - SF

67,160

Land Area - SF

72,400

2335 NW Raleigh Street 2350 NW Savier Street

Portland, OR 97210 Portland, OR 97210

www.thevaux.com

Vaux Overview

3 of 14

3

The Vaux - “EV Ready” Building!

  • The Vaux has developed a plan to make our buildings an “EV Ready” community for current and future residents.

  • The Vaux EV Ready plan includes upgrading the buildings electrical core system to be EV Ready. Owners electing to utilize EV charging will be responsible to pay on one time Core EV Allocation fee + the cost to construct and install a charging station in their parking space.

  • All EV charging will follow design and installation standards as adopted by the Vaux COA.

  • The EV Ready design includes design standards that balance electrical capacity and resident use for a high % of use cases.

  • The access fee will be held in reserve for future electrical upgrades if needed.

  • An EV Ready community (buildings) adds to the “Vaux Brand” and resale value while serving the EV charging needs of residents.

What does EV Ready Mean?

4 of 14

4

Conduit + Raceway

Electrical Room

EV @ Vaux

Distribution Box outside of electrical room

5 of 14

5

Smart Charger

EV @ Vaux

Charger subject to change

6 of 14

6

Submit Request

Unit owner submits online form requesting bid to install EV charger. unit owner is required to use Vaux contractor and charger specified by COA.

Vaux ARC + Board Approval

Request is reviewed by Vaux ARC and Vaux COA Board.

Bid and Approve Cost

COA provides a cost estimate to unit owner for EV installation including charger + $1,000 infrastructure charge.

Install Charger

COA contracts with contractor for installation of the EV charging station.

Execute Use Permit

Unit owner executes the COA EV Use Permit.

The EV Process

7 of 14

7

  1. How much will installing an EV Charger in my space cost?

It will depend on the distance of your parking space from your buildings electrical room. Assuming an average of 100 lineal feet - the total cost would be app. $8,000 including charger and installation. Note, each installation shall be bid by a licensed contractor designated by COA and cost will vary (see the next slide for sample breakdown).

  1. Why is it so expensive?�

Delivering EV charging to a parking space is not a simple construction project in a condominium building. To install EV charging the core electrical capacity must be increased to provide additional power and the parking ceiling must be x-rayed for conduit installation. EV Chargers must enable power management, load balancing, metering, network connectivity, user authentication, mobile application, automated billing, product warranty and maintenance of charging stations. Early stage EV owners must fund fair share of increasing capacity for future EV users. Be assured, the Vaux COA has vetted all solutions and engaged the leading installer of EV in condo projects in PDX - Christiansen Electric.

  1. Am I required to use the building approved charging station?

Yes, the Vaux ARC and COA did an extensive review of best in class charging systems that could accommodate the required EV Charging specifications at The Vaux.

  1. Once I install my charging station, how will I be billed?

Residents installing charging stations will be billed the cost of electricity. The Vaux requires the use of the COA approved smart charger which meters usage, manages power distribution and charges each EV owner via a smartphone app.

Vaux EV - Basic FAQ

8 of 14

8

Design the charging system for high % of use cases while maximizing capacity

Users

Charge Rate

Miles

Charge Hours

Total Capacity Parking Spaces

1

23.0 mph

184

8 hours

42

2

11.5 mph

92

8 hours

84

3

7.66 mph

61

8 hours

126

4

5.75 mph

46

8 hours

168

Tesla Model Y

40 amp Circuit

(Level 2)

*Standard 110/220v outlet charges approximately 3 to 5 mph

Charger - Time to Charge

9 of 14

9

EV To Parking Space - Owner Cost

Cost will vary by parking space

Bldg. Units Parking

Raleigh 71 85

Savier 73 90

Total 144 175

EV Ready

EV Charger + Install

Vaux EV - Cost Example

EV Cost Summary - Estimate

Phase 1

Item

Cost Type

Source

QTY

Unit Price

Total

$ Per LF

Note

Connection to CE to Bid

Variable

Bid

100

$25

$2,500

$25

Power Distribution to parking space

EV Prep - CE to BId

Fixed

Bid

-

-

$1,350

$14

PT Scan, Permit, Prep, Lift

Subtotal

$3,850

$39

Core EV Allocation

Fixed

COA

$1,000

$10

Connect to Core EV

PM + COA Oversight

Fixed

COA

$500

$5

Kin/Tross Admin

Legal + Recording Fees

Fixed

COA

$500

$5

Total

$5,850

$59

Phase 2

Charger - Clipper Creek (est)

Fixed

Bid

1

$1,325

$1,325

$13

Estimated

Shipping (est)

Fixed

Bid

1

$100

$100

$1

Estimated

Charger Install (CE Bid)

Fixed

Bid

1

$600

$600

$6

Install Charger

Charger Programming (CE Bid)

Fixed

Bid

1

$125

$125

$1

Programming of Charger

Total

$2,150

$22

TOTAL COST

$8,000

$80

Total Owner Cost

10 of 14

10

350 feet (+/-)

200 feet (+/-)

E (R)

E (S)

Note:�Distance from electrical room to your parking space - path of travel down each parking bay.

Bay 1

Bay 2

Bay 3

Bay 4

Bay 5

Raleigh Electrical Room

Savier Electrical Room

Vaux EV - Basic FAQ

11 of 14

11

EV Reference Documents

Vaux EV Reference Documents

  1. Vaux Resolution and Use Permit

12 of 14

Appendix

12

13 of 14

13

Phase 1

Up to 16 EV Charging Stations

$7.5k

EV Panel�200 amp

120/208v

Phase 2

Up to 32 EV Charging Stations

$7.5k

Phase 3

Up to 40 EV Charging Stations

$3.75k

Main Breaker�225 amp

120/208v

*EV Core Charge for future EV or as determined by COA

EV Station Ratio & EV Reserves

Main Service

800 amp

120/208v

Main Breaker�225 amp

120/208v

EV Station Ratio & EV Reserves

Main Service

800 amp

120/208v

Main Breaker�400 amp

120/208v

EV Panel�200 amp

120/208v

EV Panel�200 amp

120/208v

EV Panel�100 amp

120/208v

New

New

New

New

EV Station Ratio & EV Reserves

Raleigh Building

*EV Core Charge for future EV or as determined by COA

*EV Core Charge for future EV or as determined by COA

Main Service

800 amp

120/208v

Main Breaker�225 amp

120/208v

Main Breaker�225 amp

120/208v

New

Existing

EV Panel�200 amp

120/208v

EV Panel�200 amp

120/208v

40 amp Circuits (8)

40 amp Circuits (20)

40 amp Circuits (8)

40 amp Circuits (8)

Share EV Core Cost Res. Fund

Ratio Stations Per Station (CoreEV)*

2 to 1 16 $470 $16,000

3 to 1 24 $315 $24,000

4 to 1 32 $235 $32,000

Share EV Core Cost Res. Fund

Ratio Stations Per Station (CoreEV)*

2 to 1 32 $470 $32,000

3 to 1 48 $315 $48,000

4 to 1 64 $235 $64,000

Share EV Core Cost Res. Fund

Ratio Stations Per Station (CoreEV)*

2 to 1 40 $470 $40,000

3 to 1 60 $315 $60,000

4 to 1 80 $235 $80,000

14 of 14

14

40 amp Circuits (8)

Phase 1

Up to 16 EV Charging Stations

$7.5k

EV Panel�200 amp

120/208v

Phase 2

Up to 32 EV Charging Stations

$7.5k

40 amp Circuits (20)

Phase 3

Up to 40 EV Charging Stations

$3.75k

Main Breaker�225 amp

120/208v

*EV Core Charge for future EV or as determined by COA

EV Station Ratio & EV Reserves

Main Service

1000 amp

120/208v

Main Breaker�225 amp

120/208v

EV Station Ratio & EV Reserves

Main Service

1000 amp

120/208v

Main Breaker�400 amp

120/208v

EV Panel�200 amp

120/208v

EV Panel�200 amp

120/208v

EV Panel�100 amp

120/208v

New

New

New

EV Station Ratio & EV Reserves

40 amp Circuits (8)

40 amp Circuits (8)

Savier Building

*EV Core Charge for future EV or as determined by COA

*EV Core Charge for future EV or as determined by COA

Main Service

1000 amp

120/208v

Main Breaker�225 amp

120/208v

Main Breaker�225 amp

120/208v

New

Existing

EV Panel�200 amp

120/208v

EV Panel�200 amp

120/208v

New

Share EV Core Cost Res. Fund

Ratio Stations Per Station (CoreEV)*

2 to 1 16 $470 $16,000

3 to 1 24 $315 $24,000

4 to 1 32 $235 $32,000

Share EV Core Cost Res. Fund

Ratio Stations Per Station (CoreEV)*

2 to 1 32 $470 $32,000

3 to 1 48 $315 $48,000

4 to 1 64 $235 $64,000

Share EV Core Cost Res. Fund

Ratio Stations Per Station (CoreEV)*

2 to 1 40 $470 $40,000

3 to 1 60 $315 $60,000

4 to 1 80 $235 $80,000