SAP Plant Maintenance – Equipment
June 20, 2013
BUSINESS PROCESS
This document describes how to create Equipment for use in PM Functions. Equipment are master data to manage physical objects in PM and Customer Service. An Equipment master data object must be created here before it may be associated with a Functional Location Object.
2
CREATE EQUIPMENT
3
In the Initial Screen, Enter the values in the following fields:
Field Name: No input is required as the system creates an internal No.
Valid on: By default system proposes current data, one can change to the correct valid from Date
Equipment Category: Appropriate equipment category to be selected from the list.
REFERENCE
Equipment: Already existing equipment can be used to copy the data
Material: No applicable this is required when a material equipment link is required.
Create Equipment - General
4
Enter the parameters as detailed below: in the ‘General’ screen
Description: Equipment name to be entered (40 characters). If the name exceeds, use long text.
Object type: Type of machine ex: “select from list”
Weight: Weight of the equipment
Size: Size of the equipment
Start up date: Actual start date of usage
Acquisition value: Value of the equipment at the time of acquiring
Acquisition date: Date on which the equipment was acquired.
Manufacturer: Manufacturer of the Equipment
ManufCountry: Country, where the equipment was manufactured.
Model Number: Model number of the equipment supplied by the manufacturer.
Constr.yr/mth: Year and month of the equipment constructed
ManufPartNo: Part number of the equipment as supplied by the manufacturer.
ManufSerial No.: Serial number of the equipment as supplied by the manufacturer.
Create Equipment - Location
Location
5
Maintenance Plant: Maintenance plant, where the equipment is located.
Location: Location of the equipment, for ex: Building where it is installed.
Plant Section: Further low level identification location
Work Center: Production work center, for blocking from production during maintenance work.
ABC Indic.: As detailed below
Create Equipment - Organization
Organization
6
Company Code: R/3 will copy the respective company of the maintenance plant.
Business area: For viewing profit and loss statement (O)
Asset: Appropriate asset number should be assigned to the equipment (O)
Cost center: All the costs incurred at the equipment level are collected at these cost center levels ®
Planning plant: maintenance planning plant, defaulted as that of the maintenance plant. (O)
Planner group: Planner groups as per the maintenance planning activities (O)
Maintenance work center: Maintenance work center, currently represents the departments
Catalog profile: For equipment history generation all the codes are maintained in a catalog profile.
Create Equipment - Structure
7
Functional Location: Functional location under which the equipment is functioning (O)
Superior Equipment: Superior equipment under which the equipment is functioning (O)
Tech Indent. No: Technical identification number of the equipment (O)
Const Type: Material of construction (O)
Click here for Installation at functional location
EQUIPMENT BILL OF MATERIALS
EQUIPMENT BILL OF MATERIAL
9
A “Bill Of Material” (BOM) is a complete, formally structured list of components making up a technical object or an assembly. The list contains the object number of the individual components together with their quantity and unit of measure. The components can be stock or non-stock spares assemblies, which in turn can be described using maintenance BOMs.
BOM’s are primarily used for the following purposes:
Structure description
BOM describes the structure of a technical object or material. Using Maintainance BOMs maintenance tasks can be planned.
Assignment of spare parts
BOM is used in plant maintenance to assign spares for a technical object or material. This is shown in the figure below:
Trigger
A piece of maintenance equipment requires a bill of material for maintenance purposes. Whenever any equipment created we can create its BOM for Structuring. But before creating equipment BOM we need to create Material master.
MENU PATH
10
Transaction code: IB01, IB03
Menu Path: Logistics > Plant maintenance> Management of Technical Objects > Bill of material > Equipment BOM > IB01 create
Create Equipment BOM
11
In the initial screen enter the following:
Equipment: Select Equipment for which BOM is being created (R)
Plant: Enter Plant (R)
BOM Usage: Select
4 for Plant maintenance
Press Enter to get the following screen
NOTIFICATIONS
12
Item category: Select Item Category (R)
Component: Select item code from the dropdown (R)
Component description: System defaults descriptions of selected component (R)
Quantity: enter installed quantity
Units: systems defaults UOM of selected component
Click on SAVE to save the entered data.
NOTIFICATIONS
13