1 of 6

Training on Climate Resilient Sanitation Safety Planning

Dehiwala-Mount Lavinia, Sri Lanka

December 8th -12th, 2025

​

Presentation by group:

Koggala

Our next steps to improve our SSP

2 of 6

Our initial assessment of our own SSP

Road map 2026

​

  • Financial Support From BOI
  • Easy demarcation of system Boundary
  • Technical Assistance from respective stakeholders
  • Committed Stakeholders
  • Available data in forms of maps, database, water quality reports

​

Strengths

  • Non availability of consideration of Climate impacts
  • Not properly identifying the Inflows from Factories (Waste Water Quality)
  • Have not included the requirement of a steering committee to implement the WSP

​

​

Weaknesses

3 of 6

  • Appoint a steering committee to implement the programme with the support of BOI
  • Need to do a proper stakeholder analysis including motivating and constraining factors
  • Need to establish SSP priorities (including excreta flow diagrams)

​

​

Module 1

Photos: L. Barreto Dillon

Next steps

Road map 2026

  • Need to include impact of consumption of agricultural products using treated sludge as fertilizers
  • Needs to properly identify characterisation of system inflows from factories.
  • Needs to properly characterize exposure groups and include possibility of groundwater contamination

​

Module 2

4 of 6

  • Risk assessment table needs to be updated based on properly identifying hazardous event and sanitation step
  • Needs to incorporate Number of people at risk due to each hazard
  • Needs to tabularize the projection of changes in risks with climate change scenarios while prioritizing hazardous events.

​

Module 3

Photos: L. Barreto Dillon

Next steps

  • Needs to develop improvement options to each hazardous event
  • Needs to develop incremental improvement plan for next 3 years
  • Needs to incorporate the supports needs to be taken from the BOI

​

Module 4

Road map 2026

5 of 6

  • Needs to include control measures for a detailed operational monitoring plan
  • Need to update operational verification plan incorporating the commitments from BOI
  • ​

​

Module 5

Photos: L. Barreto Dillon

Next steps

  • Identify the ability to get the support from Ruhuna university to improve the treatment techniques
  • Identify the areas that needs further developments
  • Implement a programme to aware decision makers

​

Module 6

Road map 2026

6 of 6

THANK YOU

​