Welcome!
Wauwatosa Secondary School
Ad Hoc Committee
December 16, 2025
6:00 - 8:00 pm
Paige Richards buildcapacityconsulting.com paige@buildcapacityconsulting.com
Hello!
BUILD CAPACITY CONSULTING
TONIGHT'S OUTCOMES
BUILD CAPACITY CONSULTING
Pausing
Paraphrasing
Posing questions
Putting ideas on the table
Providing data
Paying attention to self and others
Presuming positive intentions
Norms of Collaboration
Source: Thinking Collaborative
BUILD CAPACITY CONSULTING
Agenda
Welcome & Inclusion!
Ad Hoc Committee Talking Points to the Community
School Configuration
Reflections and Next Steps
BUILD CAPACITY CONSULTING
ESSENTIAL QUESTION
Which secondary school facility model best equips WSD to implement and sustain an efficient and impactful instructional program?
BUILD CAPACITY CONSULTING
CLEAR COMMUNICATION FROM THE COMMITTEE
BUILD CAPACITY CONSULTING
Final Report &
Board Presentation
BUILD CAPACITY CONSULTING
CRITICAL QUESTIONS FOR THE COMMITTEE
The Community Survey will be sent out the week of January 5.
BUILD CAPACITY CONSULTING
Why Doing Nothing is Not Viable
*The District never provided a model to do nothing and the Ad Hoc Committee never offered a model to consider to do nothing. This is strong alignment.
BUILD CAPACITY CONSULTING
Capital Maintenance Only
Why Maintenance-Only (Model E) was not Enough
What Capital Maintenance Does | What Capital Maintenance Does Not Do |
• Repairs aging systems • Keeps buildings operational | • Modernize learning spaces; address family and student gathering spaces • Improve long-term efficiency • Address analysis of learning space findings |
*The District proposed Model E. The Ad Hoc Committee did not vote for further study of Model E.
BUILD CAPACITY CONSULTING
ROLES
BUILD CAPACITY CONSULTING
SMALL GROUPS
BUILD CAPACITY CONSULTING
Take a break
Model A1: $369,000,000
Grades 7-12
1,444 students projected
27.3-acre site
WEST
Existing: 297,635 sq. ft.
Addition: 104,300 sq. ft.
Proposed total: 401,935 sq. ft.
298,000 square feet of existing building would receive light and heavy renovations.
Minimal updates needed to building systems.
Capital maintenance needs addressed including windows, lighting, roofing, etc..
Students would be nearly completely separated.
Pool would remain open.
EAST
21.5-acre site
Building is closed and demolished.
Displaced tennis courts from West are relocated to Whitman site.
WHITMAN
20-acre site
Building is closed.
Pool would remain closed.
LONGFELLOW
X
X
Grades 7-12
1,526 students projected
11.4-acre site
Existing: 475,000 sq. ft.
Addition: 60,000 sq. ft.
Proposed total: 535,000 sq. ft.
Majority of third floor at East is renovated.
399,000 square feet of existing building would receive light and heavy renovations.
Majority of building systems are replaced.
Capital maintenance needs addressed including windows, lighting, roofing, etc.
Students would be nearly completely separated.
Pool would remain open.
Estimated Total Project Costs
Grade level, building additions, and student enrollment would only occur if this model is implemented.; enrollment is projected for the 2029-30 school year.
12/16/2025
Model D: $346,000,000
WEST
Existing: 297,635 sq. ft.
Addition: 209,000 sq. ft.
Proposed total: 506,635 sq. ft.
298,000 square feet of existing building would receive light and heavy renovations.
Minimal updates needed to building systems.
Capital maintenance needs addressed including windows, lighting, roofing, etc.
Pool remains open.
EAST
Existing: 475,000 sq. ft.
Third floor is not renovated.
278,000 square feet of existing building would receive light and heavy renovations.
Majority of building systems are replaced.
Capital maintenance needs addressed including windows, lighting, roofing, etc.
Pool remains open.
21.5-acre site
Building is closed and demolished.
Displaced athletic fields from West are relocated to Whitman site.
WHITMAN
20-acre site
Building is closed.
Pool would remain closed.
LONGFELLOW
Grades 7-8
927 students projected
11.4-acre site
Grades 9-12
2,043 students projected
27.3-acre site
Estimated Total Project Costs
Grade level, building additions, and student enrollment would only occur if this model is implemented.; enrollment is projected for the 2029-30 school year.
X
X
12/16/2025
Model F: $349,000,000
Grades 9-12
988 students projected
27.3-acre site
WEST
Existing: 297,635 sq. ft.
297,635 square feet of existing building would receive light and heavy renovations.
Minimal updates needed to building systems.
Capital maintenance needs addressed including windows, lighting, roofing, etc.
Pool remains open.
Grades 9-12
1,055 students projected
11.4-acre site
EAST
Existing: 475,000 sq. ft.
Third floor is not renovated.
337,000 square feet of existing building would receive light and heavy renovations.
Majority of building systems are replaced.
Capital maintenance needs addressed including windows, lighting, roofing, etc.
Pool remains open.
Grades 7-8
456 students projected
21.5- acre site
Existing: 141,175 sq. ft.
141,175 square feet of existing building would receive light and heavy renovations.
Minimal updates needed to building systems.
Capital maintenance needs addressed including windows, lighting, roofing, etc.
Pool remains open.
WHITMAN
Grades 7-8
471 students projected
20-acre site
Existing: 191,200 sq. ft.
123,000 square feet of existing building would receive light and heavy renovations.
Minimal updates needed to building systems.
Capital maintenance needs addressed including windows, lighting, roofing, etc.
Existing pool would be updated and reopen.
LONGFELLOW
Estimated Total Project Costs
Grade level, building additions, and student enrollment would only occur if this model is implemented.; enrollment is projected for the 2029-30 school year.
12/16/2025
Model H: $447,000,000
Grades 7-12
1,444 students projected
27.3-acre site
WEST
Existing: 297,635 sq. ft
Addition: 104,000 sq. ft.
Proposed total: 401,635 sq. ft.
297,635 square feet of existing building would receive light and heavy renovations.
Minimal updates needed to building systems.
Capital maintenance needs addressed including windows, lighting, roofing, etc.
Students would be nearly completely separated.
Pool remains open.
Grades 7-12
1,526 students projected
20-acre site
LONGFELLOW
Existing: 191,200 sq. ft.
Addition: 232,000 sq. ft.
Proposed total: 423,200 sq. ft.
191,200 square feet of existing building would receive light and heavy renovations.
Minimal updates needed to building systems.
Capital maintenance needs addressed including windows, lighting, roofing, etc.
Students would be nearly completely separated.
Most athletic fields onsite would be relocated.
Pool would be updated and reopen.
District Office & Montessori School
21.5-acre site
Existing: 232,000 sq. ft.
Building no longer used as a middle school.
61,100 square feet of heavy renovations to existing building accommodate relocated District Office and Montessori School.
Minimal updates needed to building systems.
Pool would be closed.
WHITMAN
Community Recreation
11.4-acre site
Existing: 475,000 sq. ft.
Building would no longer be used as �a school.
Portions of building would remain for a community recreation center (such as gym space, performing arts center, and pool).
Minor site restoration.
All athletic fields �remain intact.
Pool remains open.
EAST
21.68-acre site
Existing: 63,200 sq. ft.
Building is closed and the District would seek to sell.
District Office and Montessori School relocate to Whitman building.
District would retain athletic fields (Breitlow Complex) at site.
FISHER
Estimated Total Project Costs
Grade level, building additions, and student enrollment would only occur if this model is implemented.; enrollment is projected for the 2029-30 school year.
X
12/16/2025
Model I: $362,000,000
WEST
Existing: 297,635 sq. ft.
297,635 square feet of existing building would receive light and heavy renovations.
Minimal updates needed to building systems.
Capital maintenance needs addressed including windows, lighting, roofing, etc.
Pool would remain open.
Grades 7-8
471 students projected
20-acre site
LONGFELLOW
Existing: 191,200 sq. ft.
117,000 square feet of existing building would receive light and heavy renovations.
30,700 square feet of renovations to existing building accommodate Montessori relocation.
Minimal updates needed to building systems.
Capital maintenance needs addressed including windows, lighting, roofing, etc.
Pool would remain closed.
Grades 9-12
1,055 students projected
11.4-acre site
Existing: 475,000 sq. ft.
Third floor is not renovated.
337,000 square feet of existing building would receive light and heavy renovations.
Majority of building systems are replaced.
Capital maintenance needs addressed including windows, lighting, roofing, etc.
Pool would remain open.
EAST
21.68-acre site
Existing: 63,200 sq. ft.
Building is closed and the District would seek to sell.
District Office relocates to Whitman.
Montessori School relocates to Longfellow.
District would retain athletic fields (Breitlow Complex) at site.
FISHER
Grades 9-12
988 students projected
27.3-acre site
Grades 7-8
456 students projected
21.5-acre site
WHITMAN
Existing: 141,175 sq. ft.
114,175 square feet of existing building would receive light and heavy renovations.
27,000 square feet of renovations to accommodate District Office relocation.
Minimal updates needed to building systems.
Capital maintenance needs addressed including windows, lighting, roofing, etc.
Pool would be closed and space is repurposed.
X
Grade level, building additions, and student enrollment would only occur if this model is implemented.; enrollment is projected for the 2029-30 school year.
Estimated Total Project Costs
12/16/2025
Agenda
Welcome & Inclusion!
Ad Hoc Committee Talking Points to the Community
School Configuration
Reflections and Next Steps
BUILD CAPACITY CONSULTING
Models Voted to Be Studied | |
Model | Configuration |
I | Two grades 7-8 buildings Two HS |
F | Two grades 7-8 buildings Two HS |
A1 | Two 7-12 buildings |
H | Two 7-12 Buildings |
D | One grades 7-8 building One HS |
Configurations
7-12
OR
7-8 & 9-12
BUILD CAPACITY CONSULTING
Please circle one of the following:
I support a 7-12 school configuration.
I support a 7-8 and 9-12 school configuration.
Why?
SCHOOL CONFIGURATION
BUILD CAPACITY CONSULTING
Group Process
BUILD CAPACITY CONSULTING
Agenda
Welcome & Inclusion!
Ad Hoc Committee Talking Points to the Community
School Configuration
Reflections and Next Steps
BUILD CAPACITY CONSULTING
Future Meeting Dates:
January 13
January 20
February 3
February 10
FUTURE MEETINGS
Location: Fisher Administration Building
Time: 6:00 - 8:00 pm
School Board Presentation
Thursday, February 26 6-8:30pm
BUILD CAPACITY CONSULTING
Thank you!
Paige Richards buildcapacityconsulting.com paige@buildcapacityconsulting.com