How to use:
Hint: Use Calibri font for pretty look
Hint: Hold “Shift” button and use arrow keys for fine-grained position adjustments
Hint: (CMD + SHIFT + up-arrow) brings symbol to front
Hint: (CMD + SHIFT + down-arrow) sends symbol to back
Hint: Included are some slides to help with drawing maps (stages cheatsheet) as well as climate, doctrine, and associated gameplay
Value Chain
Visible
Invisible
Evolution
Genesis
Custom Built
Product (+ rental)
Commodity (+ utility)
Uncharted
Industrialized
Value Chain
Visible
Invisible
Evolution
Genesis
Custom Built
Product (+ rental)
Commodity (+ utility)
Uncharted
Industrialized
Value Chain
Visible
Invisible
Evolution
Genesis
Custom Built
Product (+ rental)
Commodity (+ utility)
Uncharted
Industrialized
Inertia
Positive return
Negative return
Evolution
Genesis
Custom Built
Product (+ rental)
Commodity (+ utility)
Uncharted
Industrialized
Profit
Profit = 0
Term | Symbol | Meaning |
Component past or future(red) | | A single entity in a map e.g. an activity , practice , data ,or knowledge |
Interface / line of the present | | A connection between components |
Point of change | | How the map is changing e.g. competitive force |
Flow | | A flow of capital (e.g. risk, financial, physical, social) between components |
Inertia | | Likely to face a resistance to a change |
Line of the future | | How the map is anticipated to be |
Constraint | | A limitation from one component to another |
Market | | Formation of a competitive marketplace |
Ecosystem | | An ecosystem model e.g. ILC |
Accelerator / decelerator | | An attempt to alter the map |
Area of interest / focus / cell | | An area of interest, something worth noting e.g. components designated to a team |
Method | | |
Attitude | |
build in-house with agile techniques
use off the shelf products.�Lean
outsource to utility suppliers.�Six Sigma
Pioneers
Settlers
Town Planners