Space Mission Design Game
Interactive 3D Systems Engineering VAB & Orbital Flight Readiness Simulator
2026 NASA SPACE APPS CHALLENGE
SPACE APPS BENGALURU 2026
TEAM HIGH-FIVE
Space Mission Design Game (SMDG)
Project Overview
Challenge
2026 NASA Space Apps Challenge — Space Mission Design Game
Event
Space Apps Bengaluru 2026
Team
High-Five — four engineers, one mission
Repository
github.com/CHETHAN-K-96/Space-Mission-Design-Game
Team High-Five
1
Chethan K
2
Kirthan N B
3
Rohith M
4
Narasimhamurthy
The Abstract Gap in Space Education
Existing space education tools fail students at the systems level — they simulate components in isolation while the real discipline demands integrated thinking across mass, power, propulsion, and cost simultaneously.
⚡ Siloed Tooling
Existing simulators isolate orbital mechanics or rocket launches — never both. Interdependent spacecraft subsystems functioning as one integrated system remain invisible to learners.
🔄 The Invisible Trade-Off Loop
Enhancing scientific instruments adds mass → requiring larger boosters → draining budgets → demanding heavier eclipse batteries. No existing tool surfaces this cascade in real time.
📐 Theory Without Feedback
Students master complex equations theoretically but lack intuitive environments where design failures deliver immediate, tangible engineering lessons.
The Solution: 3D Systems Engineering Spaceport
Core Simulation Features
1
3D Voxel Vehicle Assembly Bay (VAB)
Fly freely around Cape Canaveral Pad 39A. Mount first-stage engines, cryogenic propellant tanks, interstage pushers, and satellite cores in full spatial 3D.
2
Zero-Gap Aerodynamic Fairing & X-Ray Cutaway
Protect satellites with carbon-composite fairing clamshells. Toggle X-ray cutaway to inspect internal electronics, wiring harnesses, and CubeSat bus architecture.
3
Real-Time Telemetry HUD
Live automated computation of critical parameters with hard engineering gates enforced in-engine.
Live HUD Telemetry Gates
TWR ≥ 1.0
Thrust-to-Weight Ratio — hard launch inhibit below threshold
Net Solar Wattage
Live power budget accounting for instrument draw and charging loss
35-min Eclipse Reserve
Mandatory battery survival margin per NASA CubeSat 101 Handbook
NASA Budget Cap
Real-time mission cost tracking against authenticated budget constraints
Authentic NASA Data & Engineering Frameworks
SMDG is not a toy simulator — every constant, every gate, and every framework is sourced directly from NASA and JPL primary documentation, grounding player decisions in real aerospace engineering practice.
NASA CubeSat 101 Handbook (NP-2017-10-2470-HQ)
Parameterized 1U–6U modular bus frames, solar yield of +50W, and mandatory 35-minute eclipse battery survival baked into every power budget calculation.
JPL Concept Maturity Levels (CML 1–4)
Progressive game loop: CML 1 (Cocktail Napkin Feasibility) → CML 3 (Trade Space Exploration) → CML 4 (Point Design Certification). Each milestone unlocks new assembly tools and mission profiles.
CML 4 RYG Verification Matrix
Built-in Red-Yellow-Green audit sheet enforcing ≥80% green completion rate as a hard prerequisite before launch authorization.
JPL Horizons Ephemeris & GMAT Dynamics
Real gravitational constants embedded: μ_earth = 398,600 km³/s², μ_moon = 4,902.8 km³/s², Trans-Lunar Injection Δv = 3,120 m/s.
Key Physics Constants
Parameter | Value |
μ_earth | 398,600 km³/s² |
μ_moon | 4,902.8 km³/s² |
TLI Δv | 3,120 m/s |
Solar Yield | +50 W (1U–6U) |
Eclipse Reserve | 35 min |
Min TWR | ≥ 1.0 |
RYG Green Gate | ≥ 80% |
The Astronaut Engineer Loop: Narrative Missions
Four sequential phases transform a student from mission recipient to orbital operator — each gate demanding authentic engineering decisions before progression is authorized.
01 · Mission Briefing
Select authentic NASA flight profiles: Artemis III Lunar Transfer, Sentinel-6 Earth Observation, or Psyche Asteroid Scout — each with locked scientific objectives and hard constraints.
02 · Interactive 3D Assembly
Construct the launcher on the pad using holographic wireframe blueprint guides and modular component hotbars. Every component choice cascades through the live telemetry HUD.
03 · Flight Readiness Review
Verify all 6 critical safety gates: Budget Cap, Lift Thrust (TWR ≥ 1.0), Net Power, Eclipse Reserve, Closed DSN Link, and Sensor Payloads. No gate, no launch.
04 · Cinematic Staging Ascent
Countdown → engine ignition → acoustic exhaust plumes → Max-Q dynamic pressure → stage separation → orbital capture. Full mission cinematics upon successful FRR clearance.
FRR Safety Gates
Budget Cap
Lift Thrust TWR ≥ 1.0
Net Power Positive
35-min Eclipse Reserve
Closed DSN Link
Sensor Payloads Active
Impact, Verification & Technical Roadmap
Strict Engineering Accountability
🚫 Launch Gatekeeping
Launch is physically inhibited if TWR < 1.0, power budget is negative, or fairing shroud is unsealed. Unrealistic designs cannot proceed — full stop.
📊 Flight Debrief Scorecard
Post-orbital-injection audit: CML Milestone Achieved, Performance Score (science points + budget margin + mass efficiency), and annotated design feedback.
👥 4-Player Collaborative Roles
Asymmetric classroom team modes: Propulsion Lead, Power Engineer, Comms Specialist, Science PI — each with distinct responsibilities and tools.
Future Roadmap
Phase 1 — Current
Single-player FRR loop, 3 NASA mission profiles, full CML 1–4 progression, RYG verification matrix.
Phase 2 — WebRTC Multiplayer
Real-time multi-client synchronization enabling live 4-player collaborative classroom sessions with role-locked interfaces.
Phase 3 — Live Ephemeris
Direct JPL Horizons REST API integration for dynamic celestial ephemeris — real orbital positions updated at mission runtime.
Next.js 14 + TypeScript
Application framework
Three.js WebGL
3D engine & physics
Tailwind + Web Audio API
Mission-control UI & sound
Repository
github.com/CHETHAN-K-96/Space-Mission-Design-Game
Mission Debrief Modal + GitHub QR code with technology stack logos-
Tech Stack