1 of 9

Space Mission Design Game

Interactive 3D Systems Engineering VAB & Orbital Flight Readiness Simulator

2026 NASA SPACE APPS CHALLENGE

SPACE APPS BENGALURU 2026

TEAM HIGH-FIVE

2 of 9

Space Mission Design Game (SMDG)

Project Overview

Challenge

2026 NASA Space Apps Challenge — Space Mission Design Game

Event

Space Apps Bengaluru 2026

Team

High-Five — four engineers, one mission

Repository

github.com/CHETHAN-K-96/Space-Mission-Design-Game

Team High-Five

1

Chethan K

2

Kirthan N B

3

Rohith M

4

Narasimhamurthy

3 of 9

The Abstract Gap in Space Education

Existing space education tools fail students at the systems level — they simulate components in isolation while the real discipline demands integrated thinking across mass, power, propulsion, and cost simultaneously.

⚡ Siloed Tooling

Existing simulators isolate orbital mechanics or rocket launches — never both. Interdependent spacecraft subsystems functioning as one integrated system remain invisible to learners.

🔄 The Invisible Trade-Off Loop

Enhancing scientific instruments adds mass → requiring larger boosters → draining budgets → demanding heavier eclipse batteries. No existing tool surfaces this cascade in real time.

📐 Theory Without Feedback

Students master complex equations theoretically but lack intuitive environments where design failures deliver immediate, tangible engineering lessons.

​

​

​

​

4 of 9

5 of 9

The Solution: 3D Systems Engineering Spaceport

Core Simulation Features

1

3D Voxel Vehicle Assembly Bay (VAB)

Fly freely around Cape Canaveral Pad 39A. Mount first-stage engines, cryogenic propellant tanks, interstage pushers, and satellite cores in full spatial 3D.

2

Zero-Gap Aerodynamic Fairing & X-Ray Cutaway

Protect satellites with carbon-composite fairing clamshells. Toggle X-ray cutaway to inspect internal electronics, wiring harnesses, and CubeSat bus architecture.

3

Real-Time Telemetry HUD

Live automated computation of critical parameters with hard engineering gates enforced in-engine.

Live HUD Telemetry Gates

TWR ≥ 1.0

Thrust-to-Weight Ratio — hard launch inhibit below threshold

Net Solar Wattage

Live power budget accounting for instrument draw and charging loss

35-min Eclipse Reserve

Mandatory battery survival margin per NASA CubeSat 101 Handbook

NASA Budget Cap

Real-time mission cost tracking against authenticated budget constraints

6 of 9

Authentic NASA Data & Engineering Frameworks

SMDG is not a toy simulator — every constant, every gate, and every framework is sourced directly from NASA and JPL primary documentation, grounding player decisions in real aerospace engineering practice.

NASA CubeSat 101 Handbook (NP-2017-10-2470-HQ)

Parameterized 1U–6U modular bus frames, solar yield of +50W, and mandatory 35-minute eclipse battery survival baked into every power budget calculation.

JPL Concept Maturity Levels (CML 1–4)

Progressive game loop: CML 1 (Cocktail Napkin Feasibility) → CML 3 (Trade Space Exploration) → CML 4 (Point Design Certification). Each milestone unlocks new assembly tools and mission profiles.

CML 4 RYG Verification Matrix

Built-in Red-Yellow-Green audit sheet enforcing ≥80% green completion rate as a hard prerequisite before launch authorization.

JPL Horizons Ephemeris & GMAT Dynamics

Real gravitational constants embedded: μ_earth = 398,600 km³/s², μ_moon = 4,902.8 km³/s², Trans-Lunar Injection Δv = 3,120 m/s.

Key Physics Constants

Parameter

Value

μ_earth

398,600 km³/s²

μ_moon

4,902.8 km³/s²

TLI Δv

3,120 m/s

Solar Yield

+50 W (1U–6U)

Eclipse Reserve

35 min

Min TWR

≥ 1.0

RYG Green Gate

≥ 80%

7 of 9

The Astronaut Engineer Loop: Narrative Missions

Four sequential phases transform a student from mission recipient to orbital operator — each gate demanding authentic engineering decisions before progression is authorized.

01 · Mission Briefing

Select authentic NASA flight profiles: Artemis III Lunar Transfer, Sentinel-6 Earth Observation, or Psyche Asteroid Scout — each with locked scientific objectives and hard constraints.

02 · Interactive 3D Assembly

Construct the launcher on the pad using holographic wireframe blueprint guides and modular component hotbars. Every component choice cascades through the live telemetry HUD.

03 · Flight Readiness Review

Verify all 6 critical safety gates: Budget Cap, Lift Thrust (TWR ≥ 1.0), Net Power, Eclipse Reserve, Closed DSN Link, and Sensor Payloads. No gate, no launch.

04 · Cinematic Staging Ascent

Countdown → engine ignition → acoustic exhaust plumes → Max-Q dynamic pressure → stage separation → orbital capture. Full mission cinematics upon successful FRR clearance.

FRR Safety Gates

Budget Cap

Lift Thrust TWR ≥ 1.0

Net Power Positive

35-min Eclipse Reserve

Closed DSN Link

Sensor Payloads Active

8 of 9

Impact, Verification & Technical Roadmap

Strict Engineering Accountability

🚫 Launch Gatekeeping

Launch is physically inhibited if TWR < 1.0, power budget is negative, or fairing shroud is unsealed. Unrealistic designs cannot proceed — full stop.

📊 Flight Debrief Scorecard

Post-orbital-injection audit: CML Milestone Achieved, Performance Score (science points + budget margin + mass efficiency), and annotated design feedback.

👥 4-Player Collaborative Roles

Asymmetric classroom team modes: Propulsion Lead, Power Engineer, Comms Specialist, Science PI — each with distinct responsibilities and tools.

Future Roadmap

Phase 1 — Current

Single-player FRR loop, 3 NASA mission profiles, full CML 1–4 progression, RYG verification matrix.

Phase 2 — WebRTC Multiplayer

Real-time multi-client synchronization enabling live 4-player collaborative classroom sessions with role-locked interfaces.

​

Phase 3 — Live Ephemeris

Direct JPL Horizons REST API integration for dynamic celestial ephemeris — real orbital positions updated at mission runtime.

9 of 9

Next.js 14 + TypeScript

Application framework

Three.js WebGL

3D engine & physics

Tailwind + Web Audio API

Mission-control UI & sound

Repository

github.com/CHETHAN-K-96/Space-Mission-Design-Game

Mission Debrief Modal + GitHub QR code with technology stack logos-

Tech Stack