1 of 8

Internship�Project Review�

Name : Chaitanya Patwardhan , B.TECH – Mechanical Engineering �United Spirits Limited(DIAGEO INDIA),Aurangabad

2 of 8

Our DIAGEO Journey

  • LEARNINGS / KNOWLEDGE
  • Company policies and procedure
  • EHS standards & Procedures, importance of Safety at Work
  • Production lines / Line capacities, Brands / SKU`s, Line efficiency etc.
  • Procurement process at the plant location.
  • Mechanical Performance monitoring system, Log books, Checklists,
  • Permit to work procedure
  • Work orders, craft inspection and preventive maintenance checklists.
  • Operation of process plan, Bottling

​

​

  • WORKING EXPERIENCE
  • Design Preventive maintenance strategies, procedures and Checklist
  • Carry out Preventive maintenance work and respond to equipment faults
  • Diagnose breakdown problems
  • Carry out quality inspections on jobs

3 of 8

Our DIAGEO Journey

  • Operation Of control maintenance tools, stores and equipment
  • Deal with emergencies, unplanned problems and repairs
  • Work with specialist equipment, domino & labeling machine.
  • Active involvement in machine installations
  • Work with filling sealing and packaging machines.

​

​

  • SKILL IMPROVED
  • Teamworking skills to work cooperatively and liaise with people at all levels
  • The confidence to respond positively when under pressure
  • People-management skills
  • Good diagnostic and problem-solving skills.

​

4 of 8

Discovered at DIAGEO

Production Improvement &Decrease machine wear and tear

system

​

BRAND

​

SPEED (bpm)

​

CASES PRODUCTION PER DAY

Previous system

​

Mcd No.1

(180ml)

11500

1500-1600

​

Current system

Mcd No.1

(180ml)

13800

1800-1900

Project goal

  • To decrease the breakage of the market bottles on line number 5.
  • Decrease the labelling machine worm wear and tear.
  • Increase the production per shift
  • Make an ‘S’ pathway for the bottles on the conveyor before the labelling machine to decrease the speed and back pressure of incoming bottles

​

​

��

5 of 8

Problems & wear and tear of the worm

Before:

��

��

���

���

���

��Sent from my iPhone

Damaged worm due to the broken glass pieces

The conveyor before the ‘S’ pathway

6 of 8

After:

��

��

The ‘S’ pathway made to decrease the back pressure as well as speed of the incoming bottles. The material used to make the pathway is UHMW (ultra high molecular weight polyethylene).It is extremely tough plastic with high abrasion and wear resistance.

7 of 8

Cost Savings

Before kaizen implementation

After kaizen Implementation

Net Gain per shift

Production

Gain per case

Total Income

Production

Gain per box

Total Income

 

1500-1600 cases per shift

100rs

100*1600=1,60,000

1800-1900

100rs

100*1900=1,90,000

30,000rs

The gain per shift is 30,000rs.

​

8 of 8