Production Improvement &Decrease machine wear and tear
system | BRAND | SPEED (bpm) | CASES PRODUCTION PER DAY |
Previous system | Mcd No.1 (180ml) | 11500 | 1500-1600 |
Current system | Mcd No.1 (180ml) | 13800 | 1800-1900 |
Project goal
��
Problems & wear and tear of the worm
Before:
��
��
���
���
���
��Sent from my iPhone
Damaged worm due to the broken glass pieces
The conveyor before the ‘S’ pathway
After:
��
��
The ‘S’ pathway made to decrease the back pressure as well as speed of the incoming bottles. The material used to make the pathway is UHMW (ultra high molecular weight polyethylene).It is extremely tough plastic with high abrasion and wear resistance.
Cost Savings
Before kaizen implementation | After kaizen Implementation | Net Gain per shift | ||||
Production | Gain per case | Total Income | Production | Gain per box | Total Income |
|
1500-1600 cases per shift | 100rs | 100*1600=1,60,000 | 1800-1900 | 100rs | 100*1900=1,90,000 | 30,000rs |
The gain per shift is 30,000rs.