SAP Material Management
Inventory Management
2-Step Transfer
across Plants
using 303 and 305
via MB1B
2 step Tranfer for
Batch B3 20pcs
from
Plant 1000 SLoc 0001
to
Plant 1100 SLoc 0003
via MB1B
Step 1
Movement Type 303
Removing from Storage Location in Supplying Plant
in MB1B
Select menu for …
“Rem.frm Stor. to Plant”
System defaults Movement Type
303
Next Minimum Entry is
Plant field
After Enter
Plant
Press Enter
Receiving SLOC not needed (as Step 1 only transfer to In-Transit STock Type at the Plant level of the Receiving Plant)
Press ENTER
SAVE
Material Document created
SLoc of Receiving Plant EMTPY…
received at PLANT levels’ in-transit
Check Step1
FI Posting
via BSX
Credit Stock Plant 1000
Debit Stock Plant 1100
after step 1
Stock theoritically belongs to
Receiving Plant 1100
This 20pc is at the PLANT level. The Transit stock type is called “Stck trans (plnt)”
Before
Step 1
After
Step 1
Step 2
Movement Type 305
Receiving into
Storage Location in Receiving Plant
in MB1B
Select menu for …
“Pl.in Stor. to Plant”
(Plane into Storage Location to Receiving Plant)
System defaults Movement Type
303
Next Minimum Entry is
Plant field
After Enter
Plant
Press Enter
Maximum Qty can be entered is what you can in the Transit area.
Press ENTER
SAVE
No more Accounting Posting at STEP 2
(Step 1 completed)
This 20pc is at the PLANT level. The Transit stock type is called “Stck trans (plnt)” is now PLACED in the proper Storage Location at the Receiving Plant
Before
Step 2
After
Step 2