Summer Cleaning

Includes but not limited to the following:

  • Empty all rooms of furniture and tech, deep clean from top down, refinish floors and restage rooms
  • Service all HVAC equipment including unit-ventilators, air handlers, and air purifiers
  • Strip and wax 1/3 of rooms, scrub and recoat 2/3 of rooms
  • Refinish and seal all corridors, and wood floors (Gyms, Cafe, Etc.)
  • Paint 20% of classrooms complete, touch up paint balance
  • Paint all door jams, parking lots, and athletic fields
  • Powerwash entrances and exterior signs

3 of 34

Replacement and �Color Coding of Custodial Supplies

  • Aligns with industry standards and reduces cross contamination. Includes mops, buckets, microfiber cloths, etc.
  • Red= Bathrooms, Nurse, Locker rooms
  • Blue= Offices/Classrooms
  • Green= Kitchen/ Cafeteria

4 of 34

Replacement � of Soap and Sanitizer Dispensers

  • Standardizes all chemicals across district
  • Dispensers are safer than loose pump bottles
  • Labels and color codes all dispensers

5 of 34

WS Gym Ceiling Repair & Painting Before

6 of 34

WS Gym Ceiling Repair & Painting AfterProject included removal and replacement of all joint packing, addition of supplemental

structural steel, and painting of the entire space.

7 of 34

WS Entrance Before & After

8 of 34

WS Freezer Before and After

Removed From Café to create space, reduce noise and benefit IAQ.

Installed in Kitchen by in house staff including demolition of closet, flooring repair, relocating heating lines, and adding new electrical circuits

9 of 34

WS Café HVACInstallation of HVAC equipment including two unit-ventilators with air conditioning,

and a rooftop exhaust fan integrated and controlled by the Building Management System.

10 of 34

WS Speed BumpProject included installation of replacement speed bump.

11 of 34

Jr/Sr High School Storefront��While the further renovation is planned several flags of concrete had �deteriorated creating a safety concern. As such their replacement was �expedited.

During

After

12 of 34

Jr/Sr High School Nurse’s Office

  • New Flooring
  • New Furniture
  • All Walls Refinished
  • New Electric and Data Lines
  • Anti-Microbial Floor Finish

13 of 34

Jr/Sr High School Field House Entrances

  • New Logo Carpeting
  • Proper Entry Matting for removing soils and protecting gym floor
  • New Cove Base
  • Tile Design allows for replacement of section or logo without requiring entire area to be replaced
  • Continued Campus Branding

14 of 34

Jr/Sr High School PAC

  • All New Light Fixtures
  • Removal of Wall Packs
  • New Emergency Lighting
  • Programming Upgrades
  • New Data Lines for Advanced Projector and Podium Control

15 of 34

Jr/Sr High School East CourtyardWhile the trees were healthy, they were inappropriate for the courtyard,�and were causing damage to the foundation and drain system. Further

renovation of the space is being planned with Mr. Danbusky.

Before

After

16 of 34

Jr/Sr HS Faucet and Fountain Replacement

Faucets

Bottle Filling Stations

17 of 34

Jr/Sr High School Tennis Court Repair

  • 525 square feet of patch
  • 250 square feet of crack repair
  • 1,000 linear feet of line painting
  • 5,800 square feet of resurfacer and paint

18 of 34

Lloyd Harbor Cafe Flooring

Before

After

19 of 34

Lloyd Harbor Library

  • Removal of Storybook Steps (Maintenance Dept.)
  • Replacement of Flooring
  • New Data Lines and Electrical Circuits (Maintenance Dept.)
  • Refinishing of all walls (Custodial Dept.)

20 of 34

Lloyd Harbor Entrances

  • Replacement of flooring and cove base at both entrances

21 of 34

LH Oil Tank Sump Covers

  • New Composite Material
  • Tapered Watertight Design
  • Not impacted by Snow
  • Ensures Compliance with SCDOL
  • Ease of use ensures PM and monitoring
  • Not susceptible to corrosion
  • Lightweight to avoid injuries

22 of 34

GPS Casework Project

23 of 34

GPS Bathroom Renovations

24 of 34

GPS Bathroom Renovations

25 of 34

GPS Casework Room 12

Upcycled from Music Room, Installed by CSH Maintenance Staff

26 of 34

GPS Casework Room 10

Elevation rebuilt and shelving installed by CSH Maintenance Staff.

27 of 34

GPS Oil Tank Sump Replacement

  • New Composite Material
  • Tapered Watertight Design
  • Not impacted by Snow
  • Ensures Compliance with SCDOL
  • Ease of use ensures PM and monitoring
  • Not susceptible to corrosion
  • Lightweight to avoid injuries

28 of 34

GPS Library Before and After

Included replacement of flooring removal of story book steps, refinishing, and painting of walls.

29 of 34

GPS Nurse Flooring Before and After

30 of 34

District-Wide�Door Project

  • New Doors and Hardware
  • Salto Electronic Hardware integrated with one button lockdown system
  • Armoured One Glass Vision Panels
  • Digital access monitoring

Before

After

31 of 34

District Office Digital Directory

Before

After

32 of 34

District Office Entrance Matting

  • New Logo Matting
  • Proper Entry Matting for removing soils and moisture
  • Continued Branding

33 of 34

District Office Furniture Before and After

34 of 34

All work made possible by the herculean

efforts of the district’s dedicated facilities staff

HS Custodial Crew

Maintenance Dept.

Grounds Dept.

GPS Custodial Crew

WS Custodial Crew

LH Custodial Crew

Summer Helpers