PROJECT OVERVIEW

  • 5-story, 120-unit apartment building with on-site parking
    • Located at 3230 SE Milwaukie Ave
    • Former U.S. Bank Branch (non-operational)
    • 10% units affordable at 60% AMI (consolidated on-site)
    • On-site parking with mechanized parking system

SE Powell Blvd

SE Kelly St

SE Franklin St

SE Milwaukie Ave

SE 12th Ave

HIGH STREET RESIDENTIAL | 2

3 of 13

LOCATION

HIGH STREET RESIDENTIAL | 3

4 of 13

PROJECT TIMELINE

  • Construction timeline:
    • ~19.5 months
    • Vertical Start Date: 12/7/2023
    • Expected Completion Date: 12/6/2024

HIGH STREET RESIDENTIAL | 4

5 of 13

FLOOR PLANS

Ground Floor/Level 1

Level 2

Level 3-5

HIGH STREET RESIDENTIAL | 5

6 of 13

TYPICAL UNIT LAYOUTS

HIGH STREET RESIDENTIAL | 6

7 of 13

TYPICAL UNIT LAYOUTS

Townhome

HIGH STREET RESIDENTIAL | 7

8 of 13

PROJECT – LOOK/FEEL

MAIN LOBBY

UPPER LOBBY

MAKER SPACE

MAIN LOBBY

COWORKING

HIGH STREET RESIDENTIAL | 8

9 of 13

PROJECT – LOOK/FEEL

HIGH STREET RESIDENTIAL | 9

10 of 13

HIGH STREET RESIDENTIAL | 10

11 of 13

HIGH STREET RESIDENTIAL | 11

12 of 13

HIGH STREET RESIDENTIAL | 12

13 of 13

HIGH STREET RESIDENTIAL | 13

HIGH STREET RESIDENTIAL | 13