WELCOME TO

“PERMIT TO WORK, LOTO &

RISK ASSESSMENT SESSION”

PREPARED BY: HSE ENGINEER

2 of 52

PERMIT TO WORK, LOTO & Risk Assessment

Table of Content

  1. Basic Permit Details.
  2. Hazards of Non-Compliance to PTW/ LOTO.
  3. Scope of Permit.
  4. Definitions.
  5. Competent Person responsibilities.
  6. Senior Authorized Person responsibilities.
  7. Authorized Person responsibilities.
  8. Control Person responsibilities.
  9. Types of Permits.
  10. Types of Certificates.
  11. LOTO 6 Steps.
  12. LOTO System at BQPS-III.
  13. LOTO Sequence at BQPS-III.
  14. Risk Assessment Technique.
  15. Risk Assessment at BQPS-III

3 of 52

What is a permit ?

  • It’s a part of safe system of work to control high risk activities, such as hot work, confined spaces, excavation, work on electrical equipment.

  • It ensures that all risk have been identified, all the precautions have been put in place before, during and after the work, also it ensures that appropriate information has been communicated to all relevant parties.

PERMIT TO WORK

4 of 52

Permit Operation & Application:

PTW is a formal documents specifying the work to be done, hazards, and the precautions to be taken. The permits provides a clear written record, signed by a responsible person, supervisor, that all foreseeable hazards have been considered and all the necessary actions have been taken. It must be in the possession of the person in charge of the work before work can commence.

PERMIT TO WORK

5 of 52

Common Sections of PTW

  • Issue
  • Acceptance
  • Clearance
  • Cancelation

PERMIT TO WORK

6 of 52

  1. Put you team at fatal risk.

  • Hazardous Substances
  • Hot/ Cold temperatures
  • Electrical hazards
  • Mechanical energy hazards
  • Hazardous areas
  • Height dangers
  • Radioactive substances
  • Dangerous Fumes

PERMIT TO WORK

2. Other Factors are as follows:

  • Put your equipment and business at risk.
  • Put your environment at risk.
  • Leads to direct cost following an incident ( first-aid treatment, hospital treatment replacement of equipment’s, overtime to make up for lost time, etc. )
  • Leads to indirect cost following an incident ( loss of competent staff, loss of staff morale, investigation cost, customers good will loss, overtimes to meet delivery dates, cost of recruiting and training of new employee)

Hazards of not following PTW system:

7 of 52

This contains Procedure, Definition and Guidelines. It is only applicable to the commissioning activities at

PERMIT TO WORK

Scope of Permit to Work

PROJECT SITE LAYOUT IMAGE HERE

8 of 52

PERMIT TO WORK

Personal Supervision

Supervision by a Person such that the supervising Person is at all times during the course of the work or testing is in the presence of the personnel being supervised. (face to face )

Immediate Supervision

Supervision by a Person who is continuously available at the Location where work or testing is in progress and who attends the work area as is necessary for the safe performance of the work. �( presence within an immediate distance )

Low Voltage (L.V.)

A voltage not exceeding 1000 volts.

High Voltage (H.V)

A voltage exceeding 1000 volts.

Definitions

9 of 52

PERMIT TO WORK

Issue

Handing over of specified document from SAP to recipient(CP) for carrying out specific job.

Acceptance

The receiving of safety document by recipient (CP) after which work can be commenced.

Surrender

Handing over of safety document from concerned upon job termination.

Transfer

Handover of a PFW, LWP, SFT to a competent person.

Suspend

Act by SAP to temporarily discontinue the issued specific job .

Clearance

The state when the assigned job & other formality is completed

Cancellation

Act by SAP of Hand-back of specified document from the competent person to SAP.

Definitions

10 of 52

PERMIT TO WORK

Issue

Handing over of specified document from SAP to recipient(CP) for carrying out specific job.

Acceptance

The receiving of safety document to recipient (CP) after which work can be commenced.

Surrender

Handing over of safety document from concerned upon job termination.

Transfer

Handover of a PFW, LWP, SFT to a competent person.

Suspend

Act by SAP to temporarily discontinue the issued specific job .

Clearance

The state when the assigned job & other formality is completed

Cancellation

Act by SAP of Hand-back of specified document from the competent person to SAP.

Definitions

11 of 52

Competent Person ( Permit Receiver)

  • Competent Persons shall comply with Safety Rules stated in [].
  • Works within limit of the work scope of permit.
  • Retain the Safety Document and Keys in safe custody, and display at job location.
  • Where required provide immediate as well as personal supervision as demanded by SAP or as per work nature.
  • Warn all personals and withdraw them from work location if during the course of work or testing a hazard which could give rise to Danger arises or is suspected. This situation shall be reported immediately by the Competent Person to a Senior Authorised Person.
  • Competent Person sign clearance section of permit only when persons are with drawn from site and warned not to work on the apparatus and system.

PERMIT TO WORK

Roles & Responsibilities of Personals

12 of 52

Competent Person ( Permit Receiver)

  • He shall ensure that all tools, gear and loose material have been removed, guards and access doors replaced, the house keeping has been done at work site.
  • When transferring or during suspension of permit he ensures that all associated Keys, documents and other items are surrendered or accounted for to a Senior Authorized Person and sign the section 1 of transfer record from, while Competent person receiving transferred permit he need to sign at section 2 of transfer record.
  • As the recipient of a PFW, give Personal Supervision and being responsible for all safety matters concerned with restoration of power supplies.
  • As the recipient of a SFT, giving Personal Supervision is mandatory and being responsible for all matters of safety concerned with the test.

PERMIT TO WORK

Roles & Responsibilities of Personals

13 of 52

HEI-Contractors’ Competent Person Authorization

HEI- Contractor nominates their Competent Person for CP Approval through e-mail by their Department manager/ Lead to HEI Project Manager and Commissioning Manager after which they will be approved on the basis of their interview on PTW, LOTO & Risk Assessment.

PERMIT TO WORK

Roles & Responsibilities of Personals

Competent Person = KATE

K=Knowledge

A= Ability

T= Training

E= Experience

14 of 52

Senior Authorized Person ( Permit Issuer)

  • Senior authorized person shall comply with Safety Rules stated in [].
  • Correctly implementing specified procedures for releasing Plant and Apparatus for work or testing and for ensuring that all safety precautions which achieve Safety from the System are completed, as well as obtaining agreement of the Control Person(s) to the release of Plant and Apparatus.
  • Discussing with Control Person(s), as appropriate, to confirm that the safety precautions which have been taken are adequate for the work or testing to be done when a Safety Document is to be issued on a High Voltage System with more than one point of High Voltage supply.
  • Ensure all possible feedbacks have been taken into account.

PERMIT TO WORK

Roles & Responsibilities of Personals

15 of 52

Senior Authorized Person ( Permit Issuer)

  • Deciding whether Drain Earths are required and, if so, ensuring that the correct number of Portable Drain Earths are applied(ii) Deciding whether Plant and Apparatus shall be Vented, Purged and its contents adjusted to a level which avoids Danger, and any action to be taken to contain or dissipate stored energy.
  • Deciding under what conditions the safety precautions applied are to be removed during the course of work or testing and, where appropriate, specifying the manner in which they may be removed and re-applied such that Safety from the System is maintained.
  • Issuing the Safety Document together with, as appropriate, any Keys Competent Person’s report and deciding whether the work to be done under a Permit for Work or Limited Work Permit shall be given the Immediate or Personal Supervision of the recipient.

PERMIT TO WORK

Roles & Responsibilities of Personals

16 of 52

Senior Authorized Person ( Permit Issuer)

  • When providing Personal Supervision of the transfer of a Safety Document, discharging the same responsibilities to the new recipient as of the Safety Document was being issued initially.
  • Ensuring that the Safety Document, Key Safe Key and any associated documents and Keys are placed in safe custody in a manner which secures the safety precautions during the period of suspension. Enter the reason on remarks column.
  • Informing the Control Person of the completion of work or testing, details of any restrictions on returning the Plant and/or Apparatus to service, and, in the case of a Sanction for Test, any changes to the condition of the System concerned.

PERMIT TO WORK

Roles & Responsibilities of Personals

17 of 52

Senior Authorized Person ( Permit Issuer)

  • After cancelling a Safety Document, ensuring that the Plant and/or Apparatus is in the correct commissioning/ operational state to return to service.
  • When the means of achieving Safety from the System from the System is by limiting the work or testing or the area in which they are to be carried out, deciding those limits.
  • When work or testing is to be done outside the Safety Distance from exposed High Voltage conductors, deciding whether to issue a Limited Work Permit because of the close proximity of the limit of the Safety Distance.
  • For work on or testing of L.V. Apparatus, determining whether this is to be carried out in accordance with normal routine instructions, by a Competent Person under a Safety Document or under Personal Supervision.

PERMIT TO WORK

Roles & Responsibilities of Personals

18 of 52

Authorized Person

  • Carryout the work area inspection, discuss with Senior Authorised Person and follow his instruction.
  • Appropriate Authorised Person shall be given Isolation Certificate along with lock and tags by Senior Authorised Person to effect the isolation. Authorised Person records his name and the date and time, sign in box provided in the Isolation Certificate. Hand over all keys so that Permit can be issued by Senior Authorised Person.
  • On completion of work and subsequent to permit cancellation, remove the isolations on Senior Authorised Person demand. Authorised Person can perform switching operation up to maximum 6.6kV depending upon its level. Above 6.6kV, the execution of switching operation is the Control Person responsibility.

PERMIT TO WORK

Roles & Responsibilities of Personals

19 of 52

Authorized Person

  • In case of Sanction for Test, isolation required to be removed shall be brought in writing and Appropriate Authorised Person will remove the isolation, put signature and handover the permit to Competent person for the test.
  • Authorised Person may be asked by Senior Authorised Person to be at place during testing. Upon test completion, re-instate the safety precaution as demanded by Senior Authorised Person.
  • Ensures the security of isolations, integrity of guards and safety devices, dissipation of stored energy.

PERMIT TO WORK

Roles & Responsibilities of Personals

20 of 52

Control Person(Commissioning Manager)

  • Agreeing to the release of Plant and Apparatus for the purpose of work or testing.
  • Acknowledging completion of work or testing under a Safety Document, details of any restrictions on returning the Plant and/or Apparatus to service, and, in the case of a Sanction for Test, any changes to condition of the System concerned. Take plant and apparatus when the permit is cancelled OK and all isolations removed normally done by authorized Person.

PERMIT TO WORK

Roles & Responsibilities of Personals

21 of 52

PERMIT TO WORK

Types Of Permits

Permit for Work : It is a safety document which is used when precautions need to be taken to achieve Safety from the System for work on any apparatus. It is designed to provide protection for employees who are working in hazardous situations.

Limited Work Permit: It is a safety document which is used to specify the limits of work or access when this alone is sufficient to achieve safety from the system. No isolation is required in it.

Sanction For Test: It is a safety document which is used when testing needs to be done on a system with adequate precautions need to be taken to achieve Safety from the System. To the system/ apparatus on which SFT is needed to be given, others permit need to be surrendered and this is only safety document issued.

22 of 52

PERMIT TO WORK

23 of 52

PERMIT TO WORK

24 of 52

PERMIT TO WORK

25 of 52

PERMIT TO WORK

26 of 52

PERMIT TO WORK

27 of 52

PERMIT TO WORK

28 of 52

PERMIT TO WORK AT BQPS-III

Types Of Certificates

Isolated: Disconnected from associated Plant and/or Apparatus by an Isolating Device(s) in the isolating position, or by adequate physical separation or sufficient gap.

Hot Work: Hot work is any work that involves burning, welding, cutting, brazing, soldering, grinding, using fire- or spark-producing tools, or other work that produces a source of ignition.

Confined Space: A space on which the following can be applicable:

  • It is not designed for permanent human occupancy
  • It has a limited access and egress.
  • It must be large enough that one person can go inside it.

29 of 52

PERMIT TO WORK

Types Of Certificates

Excavation: Excavation is the process of moving earth, rock or other materials with tools, equipment or explosives. Excavation is used in construction to create building foundations, reservoirs and roads.

Radiation: Radiation is the emission or transmission of energy in the form of waves or particles through space or through a material medium. This includes: electromagnetic radiation, such as radio waves, microwaves, infrared, visible light, ultraviolet, x-rays, and gamma radiation (γ).

Diving: Descending in water for the inspection, maintenance and filming or recording purpose”.

30 of 52

PERMIT TO WORK

31 of 52

PERMIT TO WORK

32 of 52

PERMIT TO WORK

33 of 52

PERMIT TO WORK

34 of 52

PERMIT TO WORK

35 of 52

PERMIT TO WORK

36 of 52

PERMIT TO WORK

  • Duration of permit & Certificates will be for 1 whole shift, then it will be reissued.

  • A permit can only be transferred till 2 week from date of issue, after which the permit will be cleared and cancelled with all safety documents and all newly issued will all safety precaution needed to achieve safety from system.

  • Possible attachments with the permit.

  • Required Certificates.
  • Key Safe Key
  • Daily TBT form.
  • Risk Assessment.
  • Confined Space Log Sheet.
  • Confined Space Emergency Rescue Plan.
  • Hot Work Atmosphere monitoring Sheet.

  • Permit will be suspended during Plant emergency and again can be reissued after SAP approval.

  • Permit needs to transferred if SAP or CP changes.

  • Isolations mentioned in isolation certificate needs to reviewed before issuance of permit.

General Instructions

37 of 52

Lock Out and Tag Out

Six Steps

Step 1: Preparation for LOTO

The first step of the locking and tagging out is the preparation phase. The SAP & AP must investigate and obtain a complete understanding of all kinds of hazardous energy that needs to be controlled. It is important to identify the particular hazards and of course, intends for the controlling or monitoring that energy. CP can also request for certain isolations pertaining to the nature of the job.

Step 2: Shut Down the equipment

With the planning complete, the actual or exact process of powering down and shutting off machines starts.

Shutting off command is initiated by a Control Person. An AP can also do the same if the equipment to be isolated is running on local state and if SAP nominates him.

Step 3: Isolate the Equipment

The next step of the Lockout/Tagout procedure is to isolate the machine and or the equipment from any source of energy. It starts with isolation from Electrical source of the equipment and draining / earthing of the power source if deemed necessary as per SAP instructions/IC certificate. Afterwards, Hydraulic, pneumatic, mechanical etc. energy sources are isolated and purging / venting carried out as per isolation certificate.

38 of 52

Lock Out and Tag Out

Six Steps

Step 4: Lockout/Tagout

With the machine or equipment separated or isolated from its energy source, the next step or the level of LOTO system is to lock and tag out the machine or device. Proper filling of the tags with name, sign and contact number is required.

During this step, the approved or the authorized employee will attach the lockout and Tagout devices to every energy-isolating device like motor breakers, valves, emergency push buttons etc.

Step 5: Stored Energy Check – Lockout/Tagout

Even after the energy source has been separated or disconnected, in step 3 (three) of the lockout safety process, and the machine has locked & secured out.

In step 4, that doesn’t fully guarantee that there’s no hazardous energy still stored or saved within the machine or that it’s safe to perform maintenance.

At this time, it’s important to look for any hazardous energy that’s been “stored” within the machine, or any “residual” energy. During this phase, any potentially hazardous stored or residual energy must be relieved, disconnected, restrained, or made non-hazardous in some other way. For example, Again opening of purge/vent valves can address the cause effectively.

39 of 52

Lock Out and Tag Out

Six Steps

Step 6: Isolation Verification – Lockout/Tagout

This last step of the Lockout/Tagout safety is all about making sure. Yes, shut down or turned off the machines are done, isolated them from their root of the power, locked them out, and inspected for hazardous stored energy.

At this point, an authorized person verifies the machine or devices have been suitably isolated and de energized.

A competent person (CP) is also required to check that all desired isolations have been performed in true spirit before the commencement of work at site.

40 of 52

Lock Out and Tag Out

LOTO System

41 of 52

Lock Out and Tag Out

LOTO Sequence

  1. For the application of Isolation Lock (Pad Lock) by the SAP designated person, designated person shall apply the tags & locks where applicable at the relevant isolated equipment or breaker or plant/ apparatus.
  2. The keys of the Isolation Locks (Isolation Keys) are put into any selected Key Safe box.
  3. Then Control Lock Key from the Key Safe box needed taken off and put into the Key Safe Cabinet and secured by the SAP.
  4. One Key Safe box Lock key from the Key Safe box representing the single work section and it is to be handed over to the Competent person at the acceptance of the permit. If more than one work sections have to work on the same isolated equipment/ system then more Key Safe box Locks shall be applied one for each section at the same key safe box.

42 of 52

Lock Out and Tag Out

LOTO Sequence

5. The keys applied Key Safe Locks (Key Safe box Keys) shall be handed over to each competent person of each work section with the work permit having Key Safe Key # on it and shall be kept till the issuance of the permit.

 6. After the completion of the job Key Safe Keys submitted one by one to SAP by the competent person of each work section while clearing the subject permit.

 

7. SAP removes the Key Safe Locks and opens the Key Safe as soon as he receives Key Safe Keys with the clearance of the permits.

 

8. After removal of Key Safe Locks, the isolation keys can be released for de-isolation by removing the control lock at the end.

43 of 52

Risk Assessment

Risk

The likelihood that a hazard will cause harm in combination with the severity of injury, damage or loss that

might foreseeably occur.

Hazard

A formalized process of identifying hazards, assessing the risk that they generate and then either eliminating

or controlling the risk.

A hazard is something that can cause harm, e.g. electricity, chemicals

Risk Assessment

44 of 52

Risk Assessment

Objectives of Risk Assessment

The aim of risk assessment is to ensure that hazards are eliminated, or risks minimized by the correct

application of relevant standards.

The objectives of risk assessment are to prevent:

• Death and personal injury.

• Other types of loss incident.

• Breaches of statute law, which might lead to enforcement action and/or prosecution.

• The direct and indirect costs that follow on from accidents.

45 of 52

Risk Assessment

Five Steps of Risk Assessment

Risk assessment can be described as a five-step process:

1. Identify the hazards.

2. Identify the people who might be harmed and how.

3. Evaluate the risk and decide on precautions.

4. Record the significant findings and implement them.

5. Review and update as necessary.

46 of 52

Risk Assessment

Hazard Identification Methods

There are various methods that might be used to identify hazards in a workplace as part of a risk assessment process:

  1. Inspection.
  2. Task Analysis (SREDIM)

Select the task.

Record the steps or stages of the task.

Evaluate the risks associated with each step.

Develop the safe working method.

Implement the safe working method.

Monitor to ensure it is effective.

  1. Legislation
  2. Manufacture Information
  3. Incident Data

47 of 52

Risk Assessment

Identifying the Population at Risk

When identifying people at risk, think not only of those carrying out particular activities but also of those who may be affected by those activities.

  • Workers/operators
  • Maintenance Staff
  • Cleaners
  • Contractors
  • Visitors
  • Members of the public

48 of 52

49 of 52

Risk Assessment

50 of 52

Risk Assessment

51 of 52

Risk Assessment

52 of 52

THANK YOU